建筑采购新模式对抗建筑项目成本超支的潜力:从承包商角度的探索性研究

Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru, Maxwell Fordjour Antwi-Afari
{"title":"建筑采购新模式对抗建筑项目成本超支的潜力:从承包商角度的探索性研究","authors":"Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru, Maxwell Fordjour Antwi-Afari","doi":"10.1108/jfmpc-08-2022-0035","DOIUrl":null,"url":null,"abstract":"Purpose Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects. Design/methodology/approach A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach. Findings Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction. Research limitations/implications The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers. Practical implications The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods. Originality/value Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"211 1","pages":"0"},"PeriodicalIF":1.2000,"publicationDate":"2023-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The potential of new models of construction procurement to counter cost overruns in construction projects: an exploratory study from a contractors’ perspective\",\"authors\":\"Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru, Maxwell Fordjour Antwi-Afari\",\"doi\":\"10.1108/jfmpc-08-2022-0035\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects. Design/methodology/approach A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach. Findings Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction. Research limitations/implications The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers. Practical implications The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods. Originality/value Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\"211 1\",\"pages\":\"0\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2023-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfmpc-08-2022-0035\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-08-2022-0035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 0

摘要

成本超支是建设中的一个重要问题,这是该行业长期以来一直存在的一个不良特征。不良的采购做法经常被归咎于随后的建设成本超支,特别是传统的采购方法导致离谱的成本超支。本研究的目的是回顾新建筑采购模式(NMCP)的特点,并评估其在减少建筑项目成本超支方面的潜力。设计/方法/方法进行了文献审查,以确定导致成本上升的采购问题。主要数据是通过使用案例研究方法的探索性半结构化访谈获得的。客户缺乏知识被强调为采购中的一个关键问题,它与导致成本上升的许多因素相互关联。研究结果表明,NMCP中包含的特征,如承包商的早期参与和整个项目团队的合作,有可能对解决施工成本上升做出积极贡献。研究的局限性/启示主要研究是作为一项探索性研究进行的,并提出了承包商的观点。因此,建议与代表建筑项目中所有关键利益相关者的多个组织进行进一步研究,包括客户、顾问、分包商和供应商。该研究建议提高整个行业对NMCP的认识,必须提供简化的信息,以帮助扩大对这些现代采购方法的采用。原创性/价值解决了关于NMCP在行业内使用的研究的缺乏,本研究通过说明这些新的采购方法为解决成本上升提供的潜力,对建筑成本管理知识体系做出了一个小贡献。对于一个有保留地接受合作的行业,本案例研究展示了如何将开放式成本计算、项目银行账户和共享痛苦和收获机制等新颖的合作策略作为采购策略的一部分来实施,以及这些策略如何有助于将建筑项目中固有的成本升级降至最低。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The potential of new models of construction procurement to counter cost overruns in construction projects: an exploratory study from a contractors’ perspective
Purpose Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects. Design/methodology/approach A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach. Findings Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction. Research limitations/implications The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers. Practical implications The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods. Originality/value Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1