{"title":"金属冲压生产线停工的统计分析:案例研究","authors":"Lisaura Rodríguez Alvarado, Usiel Silva Rivera, Jesús Loyo Quijada","doi":"10.3926/jiem.4347","DOIUrl":null,"url":null,"abstract":"Purpose: This article seeks to establish a statistical analysis to estimate the time of stoppages in a stamping line, which have a high variability that generates an unreliable scenario for the production program. Likewise, this document shows the methodological sequence to carry out a statistical analysis in a case study at an industrial level, considering variables of a real scenario.Design/methodology/approach: The methodological sequence is divided into five stages. Initially, the information of the stamping process was collected, later the types of stoppage were categorized according to the characteristics of the process. A collection of historical data information on stoppage times was carried out. With the information collected, the percentage frequency of occurrence of stops due to tool changes and incidents in the process was determined, and they were characterized by a Weibull distribution. Finally, to verify the effectiveness of the downtime behavior, a model was developed to simulate the availability of the stamping line in the Vensim Ple ® program.Findings: The model showed that the frequency analysis and the Weibull distribution obtained a similar behavior to reality. The study verified that it is necessary to establish a categorization of the characteristics of the downtimes, according to the characteristics of the pieces produced to evaluate the information, in this way, the times of change by tooling were established through a frequency of use and the stoppages by additional incidences to the process were better.Research limitations/implications: The basis for this study is the reliability of the information, especially in the data record. It has the disadvantage that the bias of the analyst is present when the information is recorded and analyzed.Practical implications: The methodology presented in this article is a reference for industrial applications in which it is required to establish improvement scenarios based on the reduction of stoppages present in the production lines.Originality/value: The importance of this study is that it was possible to establish a suitable workload allocation in the presses to optimize production.","PeriodicalId":38526,"journal":{"name":"International Journal of Industrial Engineering and Management","volume":"50 3","pages":"0"},"PeriodicalIF":2.4000,"publicationDate":"2023-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Statistical analysis of stoppages in a metal stamping line: Case study\",\"authors\":\"Lisaura Rodríguez Alvarado, Usiel Silva Rivera, Jesús Loyo Quijada\",\"doi\":\"10.3926/jiem.4347\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: This article seeks to establish a statistical analysis to estimate the time of stoppages in a stamping line, which have a high variability that generates an unreliable scenario for the production program. Likewise, this document shows the methodological sequence to carry out a statistical analysis in a case study at an industrial level, considering variables of a real scenario.Design/methodology/approach: The methodological sequence is divided into five stages. Initially, the information of the stamping process was collected, later the types of stoppage were categorized according to the characteristics of the process. A collection of historical data information on stoppage times was carried out. With the information collected, the percentage frequency of occurrence of stops due to tool changes and incidents in the process was determined, and they were characterized by a Weibull distribution. Finally, to verify the effectiveness of the downtime behavior, a model was developed to simulate the availability of the stamping line in the Vensim Ple ® program.Findings: The model showed that the frequency analysis and the Weibull distribution obtained a similar behavior to reality. The study verified that it is necessary to establish a categorization of the characteristics of the downtimes, according to the characteristics of the pieces produced to evaluate the information, in this way, the times of change by tooling were established through a frequency of use and the stoppages by additional incidences to the process were better.Research limitations/implications: The basis for this study is the reliability of the information, especially in the data record. It has the disadvantage that the bias of the analyst is present when the information is recorded and analyzed.Practical implications: The methodology presented in this article is a reference for industrial applications in which it is required to establish improvement scenarios based on the reduction of stoppages present in the production lines.Originality/value: The importance of this study is that it was possible to establish a suitable workload allocation in the presses to optimize production.\",\"PeriodicalId\":38526,\"journal\":{\"name\":\"International Journal of Industrial Engineering and Management\",\"volume\":\"50 3\",\"pages\":\"0\"},\"PeriodicalIF\":2.4000,\"publicationDate\":\"2023-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3926/jiem.4347\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3926/jiem.4347","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Statistical analysis of stoppages in a metal stamping line: Case study
Purpose: This article seeks to establish a statistical analysis to estimate the time of stoppages in a stamping line, which have a high variability that generates an unreliable scenario for the production program. Likewise, this document shows the methodological sequence to carry out a statistical analysis in a case study at an industrial level, considering variables of a real scenario.Design/methodology/approach: The methodological sequence is divided into five stages. Initially, the information of the stamping process was collected, later the types of stoppage were categorized according to the characteristics of the process. A collection of historical data information on stoppage times was carried out. With the information collected, the percentage frequency of occurrence of stops due to tool changes and incidents in the process was determined, and they were characterized by a Weibull distribution. Finally, to verify the effectiveness of the downtime behavior, a model was developed to simulate the availability of the stamping line in the Vensim Ple ® program.Findings: The model showed that the frequency analysis and the Weibull distribution obtained a similar behavior to reality. The study verified that it is necessary to establish a categorization of the characteristics of the downtimes, according to the characteristics of the pieces produced to evaluate the information, in this way, the times of change by tooling were established through a frequency of use and the stoppages by additional incidences to the process were better.Research limitations/implications: The basis for this study is the reliability of the information, especially in the data record. It has the disadvantage that the bias of the analyst is present when the information is recorded and analyzed.Practical implications: The methodology presented in this article is a reference for industrial applications in which it is required to establish improvement scenarios based on the reduction of stoppages present in the production lines.Originality/value: The importance of this study is that it was possible to establish a suitable workload allocation in the presses to optimize production.
期刊介绍:
International Journal of Industrial Engineering and Management (IJIEM) is an interdisciplinary international academic journal published quarterly. IJIEM serves researchers in the industrial engineering, manufacturing engineering and management fields. The major aims are: To collect and disseminate information on new and advanced developments in the field of industrial engineering and management; To encourage further progress in engineering and management methodology and applications; To cover the range of engineering and management development and usage in their use of managerial policies and strategies. Thus, IJIEM invites the submission of original, high quality, theoretical and application-oriented research; general surveys and critical reviews; educational or training articles including case studies, in the field of industrial engineering and management. The journal covers all aspects of industrial engineering and management, particularly: -Smart Manufacturing & Industry 4.0, -Production Systems, -Service Engineering, -Automation, Robotics and Mechatronics, -Information and Communication Systems, -ICT for Collaborative Manufacturing, -Quality, Maintenance and Logistics, -Safety and Reliability, -Organization and Human Resources, -Engineering Management, -Entrepreneurship and Innovation, -Project Management, -Marketing and Commerce, -Investment, Finance and Accounting, -Insurance Engineering and Management, -Media Engineering and Management, -Education and Practices in Industrial Engineering and Management.