{"title":"调查施工延误的原因、影响和对COVID-19后的看法:受全球影响的公司缓解策略","authors":"Abhijeet Deshpande, George Okere, Kwame Amoah","doi":"10.1504/ijbeam.2023.10060132","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":371568,"journal":{"name":"International Journal of the Built Environment and Asset Management","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigating Construction Delay Causes, Impact and Post COVID-19 Perception: The Globally Affected Companies Mitigation Strategies\",\"authors\":\"Abhijeet Deshpande, George Okere, Kwame Amoah\",\"doi\":\"10.1504/ijbeam.2023.10060132\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":371568,\"journal\":{\"name\":\"International Journal of the Built Environment and Asset Management\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of the Built Environment and Asset Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijbeam.2023.10060132\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of the Built Environment and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijbeam.2023.10060132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}