Yiyi Mo, Chen Wang, Yutong Tang, Jeffrey Boon Hui Yap, Lincoln C. Wood, Zhi Wee Guaz
{"title":"项目时间、成本和质量约束通过心理现象的结构化模糊映射进行管理","authors":"Yiyi Mo, Chen Wang, Yutong Tang, Jeffrey Boon Hui Yap, Lincoln C. Wood, Zhi Wee Guaz","doi":"10.3846/jcem.2023.19212","DOIUrl":null,"url":null,"abstract":"Construction business involves people from different employers who have to work together in one project, thus a project manager needs to apply scientific principles to understand and to utilize those common psychological phenomena such as Hedgehog Effect, Butterfly Effect, Pygmalion Effect, Boiled Frog Syndrome, Parkinson’s Law, and Bandwagon Effect in completing work well and keeping people satisfied. The aim of this study is to develop a fuzzy mapping to assist project managers in implementing significant psychological phenomena in construction management through reflections on common psychological phenomena in the construction management. Through a structured interview survey among construction managers, the inferential association among gender, working experience, and the six psychological phenomena were plotted based on the Partial Least Square Structural Equation Modelling. Through the pairwise comparison technique, a fuzzy mapping of psychological phenomena in time, cost, and quality management was developed to facilitate the managerial efficiency in construction.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":"61 6","pages":"0"},"PeriodicalIF":4.3000,"publicationDate":"2023-10-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PROJECT TIME, COST AND QUALITY CONSTRAINTS MANAGEMENT THROUGH STRUCTURED FUZZY MAPPING ON PSYCHOLOGICAL PHENOMENA\",\"authors\":\"Yiyi Mo, Chen Wang, Yutong Tang, Jeffrey Boon Hui Yap, Lincoln C. Wood, Zhi Wee Guaz\",\"doi\":\"10.3846/jcem.2023.19212\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction business involves people from different employers who have to work together in one project, thus a project manager needs to apply scientific principles to understand and to utilize those common psychological phenomena such as Hedgehog Effect, Butterfly Effect, Pygmalion Effect, Boiled Frog Syndrome, Parkinson’s Law, and Bandwagon Effect in completing work well and keeping people satisfied. The aim of this study is to develop a fuzzy mapping to assist project managers in implementing significant psychological phenomena in construction management through reflections on common psychological phenomena in the construction management. Through a structured interview survey among construction managers, the inferential association among gender, working experience, and the six psychological phenomena were plotted based on the Partial Least Square Structural Equation Modelling. Through the pairwise comparison technique, a fuzzy mapping of psychological phenomena in time, cost, and quality management was developed to facilitate the managerial efficiency in construction.\",\"PeriodicalId\":15524,\"journal\":{\"name\":\"Journal of Civil Engineering and Management\",\"volume\":\"61 6\",\"pages\":\"0\"},\"PeriodicalIF\":4.3000,\"publicationDate\":\"2023-10-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Civil Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3846/jcem.2023.19212\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3846/jcem.2023.19212","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
PROJECT TIME, COST AND QUALITY CONSTRAINTS MANAGEMENT THROUGH STRUCTURED FUZZY MAPPING ON PSYCHOLOGICAL PHENOMENA
Construction business involves people from different employers who have to work together in one project, thus a project manager needs to apply scientific principles to understand and to utilize those common psychological phenomena such as Hedgehog Effect, Butterfly Effect, Pygmalion Effect, Boiled Frog Syndrome, Parkinson’s Law, and Bandwagon Effect in completing work well and keeping people satisfied. The aim of this study is to develop a fuzzy mapping to assist project managers in implementing significant psychological phenomena in construction management through reflections on common psychological phenomena in the construction management. Through a structured interview survey among construction managers, the inferential association among gender, working experience, and the six psychological phenomena were plotted based on the Partial Least Square Structural Equation Modelling. Through the pairwise comparison technique, a fuzzy mapping of psychological phenomena in time, cost, and quality management was developed to facilitate the managerial efficiency in construction.
期刊介绍:
The Journal of Civil Engineering and Management is a peer-reviewed journal that provides an international forum for the dissemination of the latest original research, achievements and developments. We publish for researchers, designers, users and manufacturers in the different fields of civil engineering and management.
The journal publishes original articles that present new information and reviews. Our objective is to provide essential information and new ideas to help improve civil engineering competency, efficiency and productivity in world markets.
The Journal of Civil Engineering and Management publishes articles in the following fields:
building materials and structures,
structural mechanics and physics,
geotechnical engineering,
road and bridge engineering,
urban engineering and economy,
constructions technology, economy and management,
information technologies in construction,
fire protection, thermoinsulation and renovation of buildings,
labour safety in construction.