通过供应商尽早参与设计过程,提高建筑物的可维护性

Ayman Ahmed Ezzat Othman, Ahmed Kamal
{"title":"通过供应商尽早参与设计过程,提高建筑物的可维护性","authors":"Ayman Ahmed Ezzat Othman, Ahmed Kamal","doi":"10.2478/otmcj-2023-0005","DOIUrl":null,"url":null,"abstract":"Abstract The post-construction phase represents a critical milestone in the project lifecycle. This is because design errors and omissions as well as construction defects are examined during this phase. The traditional procurement approaches that are commonly adopted in construction projects separate design from construction, which inhibits contractors, suppliers and other parties from providing the design team with constructive comments and feedback to improve the project design. Consequently, lack of considering maintainability aspects during the design process results in increasing maintenance and operation costs as well as reducing building performance. This research aims to investigate the role of early supplier involvement (ESI) in the design process as an approach for enhancing building maintainability. To achieve this aim, a research methodology consisted of literature review, case studies and survey questionnaire was designed to accomplish four objectives. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was conducted with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI during the design process in ADFs in Egypt. Data analysis showed that ‘Difficulty of trusting external parties and sharing information with transparency’ was ranked the highest challenge of ESI in ADFs in Egypt.","PeriodicalId":157020,"journal":{"name":"Organization, technology and management in construction: An international journal","volume":"225 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enhancing building maintainability through early supplier involvement in the design process\",\"authors\":\"Ayman Ahmed Ezzat Othman, Ahmed Kamal\",\"doi\":\"10.2478/otmcj-2023-0005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The post-construction phase represents a critical milestone in the project lifecycle. This is because design errors and omissions as well as construction defects are examined during this phase. The traditional procurement approaches that are commonly adopted in construction projects separate design from construction, which inhibits contractors, suppliers and other parties from providing the design team with constructive comments and feedback to improve the project design. Consequently, lack of considering maintainability aspects during the design process results in increasing maintenance and operation costs as well as reducing building performance. This research aims to investigate the role of early supplier involvement (ESI) in the design process as an approach for enhancing building maintainability. To achieve this aim, a research methodology consisted of literature review, case studies and survey questionnaire was designed to accomplish four objectives. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was conducted with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI during the design process in ADFs in Egypt. Data analysis showed that ‘Difficulty of trusting external parties and sharing information with transparency’ was ranked the highest challenge of ESI in ADFs in Egypt.\",\"PeriodicalId\":157020,\"journal\":{\"name\":\"Organization, technology and management in construction: An international journal\",\"volume\":\"225 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization, technology and management in construction: An international journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2023-0005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization, technology and management in construction: An international journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2023-0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设后阶段是项目生命周期中一个关键的里程碑。这是因为在这个阶段会检查设计错误和遗漏以及施工缺陷。建筑项目中通常采用的传统采购方式是将设计与施工分开,这阻碍了承包商、供应商和其他各方向设计团队提供建设性的意见和反馈,以改进项目设计。因此,在设计过程中缺乏对可维护性方面的考虑,导致了维护和运营成本的增加以及建筑性能的降低。本研究旨在探讨早期供应商参与(ESI)在设计过程中作为一种提高建筑可维护性的方法所扮演的角色。为了实现这一目标,研究方法包括文献综述,案例研究和调查问卷设计,以实现四个目标。首先,通过文献综述对建筑维护、可维护性、设计过程和ESI的概念进行了研究。其次,提出并分析了三个案例研究,以探讨ESI在设计过程中对提高建筑可维护性的作用。第三,对具有代表性的埃及建筑设计公司(adf)进行问卷调查,调查他们在设计过程中对ESI提高建筑可维护性的看法和应用。最后,该研究开发了一个框架,以促进在埃及adf设计过程中的ESI。数据分析显示,“难以信任外部各方和透明地共享信息”是埃及adf的ESI面临的最大挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Enhancing building maintainability through early supplier involvement in the design process
Abstract The post-construction phase represents a critical milestone in the project lifecycle. This is because design errors and omissions as well as construction defects are examined during this phase. The traditional procurement approaches that are commonly adopted in construction projects separate design from construction, which inhibits contractors, suppliers and other parties from providing the design team with constructive comments and feedback to improve the project design. Consequently, lack of considering maintainability aspects during the design process results in increasing maintenance and operation costs as well as reducing building performance. This research aims to investigate the role of early supplier involvement (ESI) in the design process as an approach for enhancing building maintainability. To achieve this aim, a research methodology consisted of literature review, case studies and survey questionnaire was designed to accomplish four objectives. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was conducted with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI during the design process in ADFs in Egypt. Data analysis showed that ‘Difficulty of trusting external parties and sharing information with transparency’ was ranked the highest challenge of ESI in ADFs in Egypt.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Life-cycle cost estimation of a building structure: An example of partition walls The factors that affect constructability in Iraq Disruptive method for managing BIM design and construction using Kanban A competency framework for strategic planning managers in multi-business holding organisations Comparative assessment of deterministic methodologies for estimating excavation productivity
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1