隧道连通输水多水库运行规律模拟

Khairul Iqbal, Moh Abduh, , Variadi
{"title":"隧道连通输水多水库运行规律模拟","authors":"Khairul Iqbal, Moh Abduh, , Variadi","doi":"10.13170/aijst.12.2.32532","DOIUrl":null,"url":null,"abstract":"The multi-reservoir operation rules require accuracy in developing its technical parameters. This is done to prevent operational failure in one of the reservoirs. The water transfer concept is to manage the water resources distribution between the receiving watershed and the donor watershed. The availability of transferable water must be prioritized, meeting the water demand of the donor reservoir. Storage capacity in both reservoirs aims to meet water demand, especially in the recipient. The elevation of the interconnecting tunnel is the minimum limit for water use in simulation. The interconnected tunnels' location and capacity will determine the multi-reservoir's operation rule. The interconnected tunnel in the Rukoh Tiro reservoir transfers water in the operation of the two reservoirs. The simulation is carried out in three seasons, considering the inflow of each watershed, the reservoir's downstream water demand, and the reservoir's technical conditions. The simulation results of the Rukoh Tiro reservoir operated simultaneously in all three seasons show that the fulfillment of irrigation water demand can reach 100% as needed. The water transfer process through interconnected tunnels occurs throughout the year. The reservoir operating rule is expected to be a reference in the multi-reservoir operation to obtain an optimal reservoir operating rule.","PeriodicalId":7128,"journal":{"name":"Aceh International Journal of Science and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation of Multi Reservoir Operation Rules with Interconnected Tunnel and Water Transfer\",\"authors\":\"Khairul Iqbal, Moh Abduh, , Variadi\",\"doi\":\"10.13170/aijst.12.2.32532\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The multi-reservoir operation rules require accuracy in developing its technical parameters. This is done to prevent operational failure in one of the reservoirs. The water transfer concept is to manage the water resources distribution between the receiving watershed and the donor watershed. The availability of transferable water must be prioritized, meeting the water demand of the donor reservoir. Storage capacity in both reservoirs aims to meet water demand, especially in the recipient. The elevation of the interconnecting tunnel is the minimum limit for water use in simulation. The interconnected tunnels' location and capacity will determine the multi-reservoir's operation rule. The interconnected tunnel in the Rukoh Tiro reservoir transfers water in the operation of the two reservoirs. The simulation is carried out in three seasons, considering the inflow of each watershed, the reservoir's downstream water demand, and the reservoir's technical conditions. The simulation results of the Rukoh Tiro reservoir operated simultaneously in all three seasons show that the fulfillment of irrigation water demand can reach 100% as needed. The water transfer process through interconnected tunnels occurs throughout the year. The reservoir operating rule is expected to be a reference in the multi-reservoir operation to obtain an optimal reservoir operating rule.\",\"PeriodicalId\":7128,\"journal\":{\"name\":\"Aceh International Journal of Science and Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Aceh International Journal of Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.13170/aijst.12.2.32532\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aceh International Journal of Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13170/aijst.12.2.32532","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

多油藏作业规律要求其技术参数的制定具有准确性。这样做是为了防止其中一个储层的操作失败。水转移的概念是管理水资源在接收流域和捐赠流域之间的分配。可转移水的可用性必须优先考虑,以满足供体水库的用水需求。这两个水库的储水量旨在满足水的需求,特别是在受援国。在模拟中,连接隧道的标高是最小用水限制。连网隧洞的位置和容量决定了多水库的运行规律。在两个水库的运行中,Rukoh Tiro水库的相互连接的隧道调水。模拟分三个季节进行,考虑了各流域入水量、水库下游需水量和水库技术条件。三季同时运行的鹿湖水库的模拟结果表明,灌溉需水量的满足率可以达到100%。通过相互连接的隧道的调水过程贯穿全年。该水库运行规则可为多水库运行提供参考,以获得最优的水库运行规则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Simulation of Multi Reservoir Operation Rules with Interconnected Tunnel and Water Transfer
The multi-reservoir operation rules require accuracy in developing its technical parameters. This is done to prevent operational failure in one of the reservoirs. The water transfer concept is to manage the water resources distribution between the receiving watershed and the donor watershed. The availability of transferable water must be prioritized, meeting the water demand of the donor reservoir. Storage capacity in both reservoirs aims to meet water demand, especially in the recipient. The elevation of the interconnecting tunnel is the minimum limit for water use in simulation. The interconnected tunnels' location and capacity will determine the multi-reservoir's operation rule. The interconnected tunnel in the Rukoh Tiro reservoir transfers water in the operation of the two reservoirs. The simulation is carried out in three seasons, considering the inflow of each watershed, the reservoir's downstream water demand, and the reservoir's technical conditions. The simulation results of the Rukoh Tiro reservoir operated simultaneously in all three seasons show that the fulfillment of irrigation water demand can reach 100% as needed. The water transfer process through interconnected tunnels occurs throughout the year. The reservoir operating rule is expected to be a reference in the multi-reservoir operation to obtain an optimal reservoir operating rule.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
19
审稿时长
8 weeks
期刊最新文献
Structural Health Monitoring by Identification Dynamic Properties and Load Rating Factor at Multi-span Prestressed Concrete Girder Bridge Isotherm and Kinetic Adsorption of Cadmium (Cd) onto Biosorbent Made from Kepok Banana Peel (Musa Acuminata balbisian): the Effect of Activator Type and Biosorbent Dosage Life Cycle Cost Analysis and Payback Period of 12-kW Wind Turbine for a Remote Telecommunications Base Station Simulation of Multi Reservoir Operation Rules with Interconnected Tunnel and Water Transfer Simple Technology of Material Physics of Groundwater Conservation in Dealing with Climate Change in Disaster Areas of North Sumatra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1