系统协调保护传输系统70 kV GI Banaran Kediri Transmission Line Pare

None Hafid Abibie, None Sulistyowati, None Ferdian Ronilaya
{"title":"系统协调保护传输系统70 kV GI Banaran Kediri Transmission Line Pare","authors":"None Hafid Abibie, None Sulistyowati, None Ferdian Ronilaya","doi":"10.33795/elposys.v7i3.668","DOIUrl":null,"url":null,"abstract":"The substation is one of the components in the electric power distribution system which plays a very important role because itis the connection between electricity services to customers. In the electric power distribution system, there are disturbances that often occur,one of which is a short circuit. For that, the way to overcome this is using the Distance Relay protection system, OCR / GFR and DEF. Thepurpose of writing this research is to determine the value of setting relay distance, setting Over Current Rele and Directional Earth Fault relayin order to secure the 70 kV transmission network connected to GI Banaran, which is then simulated using DigSILENT 15.1 software on thePare line by calculating symmetrical and asymmetrical disturbances. including 3-phase disturbance on February 1, 2018. The simulationresults show that the 3-phase disturbance occurs at Zone 1 relay distance of the Banaran Bay Pare substation with a trip time of 0.02 secondswith a fault impedance of 0.083 ohms below the relay impedance value of 0.887 ohms. The coordination between the distance relay on theside of the Banaran Bay Pare substation has worked well because there is no error reading the relay when it will cut off the disturbance.","PeriodicalId":476257,"journal":{"name":"Elposys: Jurnal Sistem Kelistrikan","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Kajian Koordinasi Sistem Proteksi Pada Sistem Transmisi 70 kV GI Banaran Kediri Transmission Line Bay Pare\",\"authors\":\"None Hafid Abibie, None Sulistyowati, None Ferdian Ronilaya\",\"doi\":\"10.33795/elposys.v7i3.668\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The substation is one of the components in the electric power distribution system which plays a very important role because itis the connection between electricity services to customers. In the electric power distribution system, there are disturbances that often occur,one of which is a short circuit. For that, the way to overcome this is using the Distance Relay protection system, OCR / GFR and DEF. Thepurpose of writing this research is to determine the value of setting relay distance, setting Over Current Rele and Directional Earth Fault relayin order to secure the 70 kV transmission network connected to GI Banaran, which is then simulated using DigSILENT 15.1 software on thePare line by calculating symmetrical and asymmetrical disturbances. including 3-phase disturbance on February 1, 2018. The simulationresults show that the 3-phase disturbance occurs at Zone 1 relay distance of the Banaran Bay Pare substation with a trip time of 0.02 secondswith a fault impedance of 0.083 ohms below the relay impedance value of 0.887 ohms. The coordination between the distance relay on theside of the Banaran Bay Pare substation has worked well because there is no error reading the relay when it will cut off the disturbance.\",\"PeriodicalId\":476257,\"journal\":{\"name\":\"Elposys: Jurnal Sistem Kelistrikan\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Elposys: Jurnal Sistem Kelistrikan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33795/elposys.v7i3.668\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elposys: Jurnal Sistem Kelistrikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/elposys.v7i3.668","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

变电站是配电系统的重要组成部分之一,它是电力服务与用户之间的连接,起着非常重要的作用。在配电系统中,经常会出现各种干扰,其中之一就是短路。为此,克服这一问题的方法是使用距离继电保护系统,OCR / GFR和DEF。编写本研究的目的是确定设置继电器距离,设置过电流继电器和定向接地故障继电器的值,以确保与GI Banaran相连的70 kV输电网,然后使用DigSILENT 15.1软件通过计算对称和不对称干扰在pare线上进行模拟。包括2018年2月1日的三相扰动。仿真结果表明,Banaran Bay Pare变电站1区继电距离处出现三相扰动,跳闸时间为0.02秒,故障阻抗低于继电器阻抗值0.887欧姆0.083欧姆。Banaran Bay Pare变电站两侧距离继电器的配合工作良好,因为继电器在切断干扰时没有读取错误。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Kajian Koordinasi Sistem Proteksi Pada Sistem Transmisi 70 kV GI Banaran Kediri Transmission Line Bay Pare
The substation is one of the components in the electric power distribution system which plays a very important role because itis the connection between electricity services to customers. In the electric power distribution system, there are disturbances that often occur,one of which is a short circuit. For that, the way to overcome this is using the Distance Relay protection system, OCR / GFR and DEF. Thepurpose of writing this research is to determine the value of setting relay distance, setting Over Current Rele and Directional Earth Fault relayin order to secure the 70 kV transmission network connected to GI Banaran, which is then simulated using DigSILENT 15.1 software on thePare line by calculating symmetrical and asymmetrical disturbances. including 3-phase disturbance on February 1, 2018. The simulationresults show that the 3-phase disturbance occurs at Zone 1 relay distance of the Banaran Bay Pare substation with a trip time of 0.02 secondswith a fault impedance of 0.083 ohms below the relay impedance value of 0.887 ohms. The coordination between the distance relay on theside of the Banaran Bay Pare substation has worked well because there is no error reading the relay when it will cut off the disturbance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Studi Ekonomis Implementasi Kapasitor Dengan Detuned Reactor Untuk Meningkatkan Efisiensi Faktor Daya Desain Pembangkit Listrik Tenaga Surya Off-Grid dan Monitoring Berbasis Node-Red Rancang Bangun Thermoelectric Generator (TEG) Sebagai Suplai Daya Alternatif Germinasi Kacang Hijau Implementasi Sistem Monitoring Alat Pengering Biji Kopi Berbasis IoT (Internet of Things) Rancang Bangun Akuarium Dengan Pengkondisian PH Air Otomatis Berbasis PLTS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1