公路网电动汽车能源补充基础设施的最优选址与规模

IF 2.1 Q2 ENGINEERING, MULTIDISCIPLINARY Inventions Pub Date : 2023-09-15 DOI:10.3390/inventions8050117
Ding Jin, Huayu Zhang, Bing Han, Gang Liu, Fei Xue, Shaofeng Lu
{"title":"公路网电动汽车能源补充基础设施的最优选址与规模","authors":"Ding Jin, Huayu Zhang, Bing Han, Gang Liu, Fei Xue, Shaofeng Lu","doi":"10.3390/inventions8050117","DOIUrl":null,"url":null,"abstract":"The electric vehicle (EV) market is expanding rapidly to achieve the future goal of eco-friendly transportation. The scientific planning of energy supplement infrastructures (ESIs), with appropriate locations and capacity, is imperative to develop the EV industry. In this research, a mixed integer linear programming (MILP) model is proposed to optimize the location and capacity of ESIs, including vehicle charging stations (VCSs), battery swapping stations (BSSs), and battery charging stations (BCSs), in highway networks. The objective of this model is to minimize the total cost with the average waiting time for EVs being constrained. In this model, battery swapping and transportation behaviors are optimized such that the EV average waiting time can be reduced, and the average queue and service process waiting time is estimated by the M/M/1 model. Real-world data, i.e., from the London M25 highway network system, are used as a case study to test the effectiveness of the proposed method. The results show that considering battery transportation behaviors is more cost efficient, and the results are sensitive to the EV average waiting time tolerance, battery cost, and charging demand.","PeriodicalId":14564,"journal":{"name":"Inventions","volume":"53 1","pages":"0"},"PeriodicalIF":2.1000,"publicationDate":"2023-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal Siting and Sizing of Electric Vehicle Energy Supplement Infrastructure in Highway Networks\",\"authors\":\"Ding Jin, Huayu Zhang, Bing Han, Gang Liu, Fei Xue, Shaofeng Lu\",\"doi\":\"10.3390/inventions8050117\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The electric vehicle (EV) market is expanding rapidly to achieve the future goal of eco-friendly transportation. The scientific planning of energy supplement infrastructures (ESIs), with appropriate locations and capacity, is imperative to develop the EV industry. In this research, a mixed integer linear programming (MILP) model is proposed to optimize the location and capacity of ESIs, including vehicle charging stations (VCSs), battery swapping stations (BSSs), and battery charging stations (BCSs), in highway networks. The objective of this model is to minimize the total cost with the average waiting time for EVs being constrained. In this model, battery swapping and transportation behaviors are optimized such that the EV average waiting time can be reduced, and the average queue and service process waiting time is estimated by the M/M/1 model. Real-world data, i.e., from the London M25 highway network system, are used as a case study to test the effectiveness of the proposed method. The results show that considering battery transportation behaviors is more cost efficient, and the results are sensitive to the EV average waiting time tolerance, battery cost, and charging demand.\",\"PeriodicalId\":14564,\"journal\":{\"name\":\"Inventions\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2023-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Inventions\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/inventions8050117\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inventions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/inventions8050117","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

电动汽车(EV)市场正在迅速扩大,以实现环保交通的未来目标。科学规划合适的位置和容量的能源补充基础设施是发展电动汽车产业的必要条件。本文提出了一种混合整数线性规划(MILP)模型,用于优化公路网络中车辆充电站(VCSs)、电池交换站(bss)和电池充电站(BCSs)的位置和容量。该模型的目标是在限制电动汽车平均等待时间的情况下使总成本最小化。在该模型中,对换电池行为和运输行为进行优化,使电动汽车平均等待时间减少,并通过M/M/1模型估计平均排队和服务过程等待时间。真实世界的数据,即来自伦敦M25高速公路网系统,被用作一个案例研究,以测试所提出的方法的有效性。结果表明,考虑电池运输行为更具成本效益,且结果对电动汽车平均等待时间容限、电池成本和充电需求较为敏感。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal Siting and Sizing of Electric Vehicle Energy Supplement Infrastructure in Highway Networks
The electric vehicle (EV) market is expanding rapidly to achieve the future goal of eco-friendly transportation. The scientific planning of energy supplement infrastructures (ESIs), with appropriate locations and capacity, is imperative to develop the EV industry. In this research, a mixed integer linear programming (MILP) model is proposed to optimize the location and capacity of ESIs, including vehicle charging stations (VCSs), battery swapping stations (BSSs), and battery charging stations (BCSs), in highway networks. The objective of this model is to minimize the total cost with the average waiting time for EVs being constrained. In this model, battery swapping and transportation behaviors are optimized such that the EV average waiting time can be reduced, and the average queue and service process waiting time is estimated by the M/M/1 model. Real-world data, i.e., from the London M25 highway network system, are used as a case study to test the effectiveness of the proposed method. The results show that considering battery transportation behaviors is more cost efficient, and the results are sensitive to the EV average waiting time tolerance, battery cost, and charging demand.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Inventions
Inventions Engineering-Engineering (all)
CiteScore
4.80
自引率
11.80%
发文量
91
审稿时长
12 weeks
期刊最新文献
Enhancing Smart Agriculture Monitoring via Connectivity Management Scheme and Dynamic Clustering Strategy Computer Vision Algorithm for Characterization of a Turbulent Gas–Liquid Jet A Modified Xception Deep Learning Model for Automatic Sorting of Olives Based on Ripening Stages Automatic Control and System Theory and Advanced Applications—Volume 2 Large-Scale BESS for Damping Frequency Oscillations of Power Systems with High Wind Power Penetration
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1