评估供应商早期参与对公共工程采购的影响

Vincent Kwame Osei-Appiah, Ernest Kissi, Victor Acheamfour Karikari, Prosper Ayeng, Eugene Danquah-Smith, Michael Adesi
{"title":"评估供应商早期参与对公共工程采购的影响","authors":"Vincent Kwame Osei-Appiah, Ernest Kissi, Victor Acheamfour Karikari, Prosper Ayeng, Eugene Danquah-Smith, Michael Adesi","doi":"10.1108/jfmpc-09-2022-0047","DOIUrl":null,"url":null,"abstract":"Purpose Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement performance positively. Works procurement has been attracting significant attention from major players due to poor performance characterized by poor performance, budget overruns and incompetence. Hence, the purpose of this study was to assess the impact of ESI on public works procurement performance. Design/methodology/approach Based on a thorough review of the literature for a pilot survey, the main questionnaires were administered to 103 public procurement officers. To assess the impact of ESI on public works procurement performance, three constructs that served as factors for implementing ESI and five that measure works procurement performance were validated using partial least square structural equation modelling (PLS-SEM). Findings The outcome of this study shows a significant positive impact of ESI on works procurement performance. This included communication, trust and supplier capabilities. The study further showed that even though cost, schedule, quality, health and safety are essential, sustainability measures are also crucial for work procurement. Research limitations/implications The results of this study could help firms make better decisions regarding public works procurement by encouraging ESI. This will likely significantly impact the successful project delivery and preservation of sustainability and efficiency objectives. Originality/value The application of PLS-SEM analysis in this study provides insights into how ESI can impact the procurement of public works in Ghana.","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"38 1","pages":"0"},"PeriodicalIF":1.2000,"publicationDate":"2023-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessing the impact of early supplier involvement on public works procurement\",\"authors\":\"Vincent Kwame Osei-Appiah, Ernest Kissi, Victor Acheamfour Karikari, Prosper Ayeng, Eugene Danquah-Smith, Michael Adesi\",\"doi\":\"10.1108/jfmpc-09-2022-0047\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement performance positively. Works procurement has been attracting significant attention from major players due to poor performance characterized by poor performance, budget overruns and incompetence. Hence, the purpose of this study was to assess the impact of ESI on public works procurement performance. Design/methodology/approach Based on a thorough review of the literature for a pilot survey, the main questionnaires were administered to 103 public procurement officers. To assess the impact of ESI on public works procurement performance, three constructs that served as factors for implementing ESI and five that measure works procurement performance were validated using partial least square structural equation modelling (PLS-SEM). Findings The outcome of this study shows a significant positive impact of ESI on works procurement performance. This included communication, trust and supplier capabilities. The study further showed that even though cost, schedule, quality, health and safety are essential, sustainability measures are also crucial for work procurement. Research limitations/implications The results of this study could help firms make better decisions regarding public works procurement by encouraging ESI. This will likely significantly impact the successful project delivery and preservation of sustainability and efficiency objectives. Originality/value The application of PLS-SEM analysis in this study provides insights into how ESI can impact the procurement of public works in Ghana.\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2023-09-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfmpc-09-2022-0047\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-09-2022-0047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 0

摘要

工程采购绩效是项目成功交付的关键。然而,在其他行业,早期供应商参与(ESI)已经被吹捧为对采购绩效产生积极影响。由于业绩不佳、预算超支、能力不足等表现不佳,工程采购一直受到主要参与者的极大关注。因此,本研究的目的是评估ESI对公共工程采购绩效的影响。根据对试点调查文献的彻底审查,向103名公共采购干事发放了主要问题单。为了评估ESI对公共工程采购绩效的影响,使用偏最小二乘结构方程模型(PLS-SEM)验证了作为实施ESI因素的三个结构和衡量工程采购绩效的五个结构。本研究的结果显示ESI对工程采购绩效有显著的正向影响。这包括沟通、信任和供应商能力。研究进一步表明,尽管成本、进度、质量、健康和安全至关重要,但可持续性措施对工作采购也至关重要。本研究的结果可以通过鼓励ESI来帮助企业在公共工程采购方面做出更好的决策。这可能会对项目的成功交付以及可持续性和效率目标的保持产生重大影响。原创性/价值PLS-SEM分析在本研究中的应用提供了ESI如何影响加纳公共工程采购的见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Assessing the impact of early supplier involvement on public works procurement
Purpose Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement performance positively. Works procurement has been attracting significant attention from major players due to poor performance characterized by poor performance, budget overruns and incompetence. Hence, the purpose of this study was to assess the impact of ESI on public works procurement performance. Design/methodology/approach Based on a thorough review of the literature for a pilot survey, the main questionnaires were administered to 103 public procurement officers. To assess the impact of ESI on public works procurement performance, three constructs that served as factors for implementing ESI and five that measure works procurement performance were validated using partial least square structural equation modelling (PLS-SEM). Findings The outcome of this study shows a significant positive impact of ESI on works procurement performance. This included communication, trust and supplier capabilities. The study further showed that even though cost, schedule, quality, health and safety are essential, sustainability measures are also crucial for work procurement. Research limitations/implications The results of this study could help firms make better decisions regarding public works procurement by encouraging ESI. This will likely significantly impact the successful project delivery and preservation of sustainability and efficiency objectives. Originality/value The application of PLS-SEM analysis in this study provides insights into how ESI can impact the procurement of public works in Ghana.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1