Namra Mubarak, Jabran Khan, Jamshed Ali Turi, Robina Yasmin
{"title":"政治风险与项目成功:中介机制与交互效应","authors":"Namra Mubarak, Jabran Khan, Jamshed Ali Turi, Robina Yasmin","doi":"10.1504/ijbex.2023.133495","DOIUrl":null,"url":null,"abstract":"Complexities bring risks in projects. Political risk involves political instability in the project domain, and lessens the chances of return on investment. In this study, we aim to investigate the impact of the political risk on project success. Data were collected from project-based organisations (information technology, construction and other developmental projects) operating in Islamabad and Rawalpindi. Confirmatory factor analysis was used to test model fitness. Results of the study suggest that political risk has an astounding effect on project industry and negatively effects manager's stress resulting in project failure. But, if there is some risk avoidance strategy against political risk adopted by the manager, then the stress of the manager will also be lessened with fewer chances of project failure. Theoretical and practical implications are discussed.","PeriodicalId":39431,"journal":{"name":"International Journal of Business Excellence","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Political risk and project success: mediating mechanism and interacting effect\",\"authors\":\"Namra Mubarak, Jabran Khan, Jamshed Ali Turi, Robina Yasmin\",\"doi\":\"10.1504/ijbex.2023.133495\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Complexities bring risks in projects. Political risk involves political instability in the project domain, and lessens the chances of return on investment. In this study, we aim to investigate the impact of the political risk on project success. Data were collected from project-based organisations (information technology, construction and other developmental projects) operating in Islamabad and Rawalpindi. Confirmatory factor analysis was used to test model fitness. Results of the study suggest that political risk has an astounding effect on project industry and negatively effects manager's stress resulting in project failure. But, if there is some risk avoidance strategy against political risk adopted by the manager, then the stress of the manager will also be lessened with fewer chances of project failure. Theoretical and practical implications are discussed.\",\"PeriodicalId\":39431,\"journal\":{\"name\":\"International Journal of Business Excellence\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Business Excellence\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijbex.2023.133495\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Business Excellence","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijbex.2023.133495","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
Political risk and project success: mediating mechanism and interacting effect
Complexities bring risks in projects. Political risk involves political instability in the project domain, and lessens the chances of return on investment. In this study, we aim to investigate the impact of the political risk on project success. Data were collected from project-based organisations (information technology, construction and other developmental projects) operating in Islamabad and Rawalpindi. Confirmatory factor analysis was used to test model fitness. Results of the study suggest that political risk has an astounding effect on project industry and negatively effects manager's stress resulting in project failure. But, if there is some risk avoidance strategy against political risk adopted by the manager, then the stress of the manager will also be lessened with fewer chances of project failure. Theoretical and practical implications are discussed.
期刊介绍:
Business excellence relies heavily on the type of strategies, techniques and tools for measuring and benchmarking the business performance. Subsequently, identifying best practices and their implementation eventually decides excellence in business. Given the importance of business excellence, a journal devoted to performance evaluation and best practices, especially in order to be competitive in the global market, is essential. IJBEX addresses new developments in business excellence and best practices, and methodologies to determine these in both manufacturing and service organisations. Topics covered include: -Performance measures and metrics in business management- Methodologies and tools for performance measurement- Benchmarking business performance- Business excellence in various functional areas- Best practices in business management- World class business and operational strategies and techniques- Alignment between different levels of strategies- Understanding the customer requirements- Process design and management- Knowledge management for improved performance- Systems approach for determining the best practices- Six-Sigma, QFD, Taguchi methods and TQM- Data warehousing and data mining in business excellence- Measuring performance in creative industries- Best practices in creative economy and industries