{"title":"有限缓冲条件下流水车间环境下的集成生产和非周期维修计划","authors":"Shahrzad DerakhshanHoreh, Mehdi Bijari","doi":"10.1504/ijise.2023.134718","DOIUrl":null,"url":null,"abstract":"In this paper, we work on a problem of determination of production and maintenance scheduling as well as the production lot sizes in flow-shop environment with limited buffer. We introduce a new mathematical model that can schedule production and non-cyclical maintenance activities. The objective of the problem is minimising the total costs consisting of production, setup, inventory and preventive maintenance costs. A method for linearising the mathematical model is introduced. Since the problem is NP-hard, solving the problem with proposed mathematical model in large and medium sizes is hard and time consuming. Hence, two heuristic algorithms based on fix and optimise approach are developed. For checking the solution quality, the numerical results of heuristic algorithms are compared with optimal solution, lower bound value and the best answer that gained among the examples.","PeriodicalId":35142,"journal":{"name":"International Journal of Industrial and Systems Engineering","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated production and non-cyclical maintenance planning in flow-shop environment with limited buffer\",\"authors\":\"Shahrzad DerakhshanHoreh, Mehdi Bijari\",\"doi\":\"10.1504/ijise.2023.134718\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we work on a problem of determination of production and maintenance scheduling as well as the production lot sizes in flow-shop environment with limited buffer. We introduce a new mathematical model that can schedule production and non-cyclical maintenance activities. The objective of the problem is minimising the total costs consisting of production, setup, inventory and preventive maintenance costs. A method for linearising the mathematical model is introduced. Since the problem is NP-hard, solving the problem with proposed mathematical model in large and medium sizes is hard and time consuming. Hence, two heuristic algorithms based on fix and optimise approach are developed. For checking the solution quality, the numerical results of heuristic algorithms are compared with optimal solution, lower bound value and the best answer that gained among the examples.\",\"PeriodicalId\":35142,\"journal\":{\"name\":\"International Journal of Industrial and Systems Engineering\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial and Systems Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijise.2023.134718\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial and Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijise.2023.134718","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
Integrated production and non-cyclical maintenance planning in flow-shop environment with limited buffer
In this paper, we work on a problem of determination of production and maintenance scheduling as well as the production lot sizes in flow-shop environment with limited buffer. We introduce a new mathematical model that can schedule production and non-cyclical maintenance activities. The objective of the problem is minimising the total costs consisting of production, setup, inventory and preventive maintenance costs. A method for linearising the mathematical model is introduced. Since the problem is NP-hard, solving the problem with proposed mathematical model in large and medium sizes is hard and time consuming. Hence, two heuristic algorithms based on fix and optimise approach are developed. For checking the solution quality, the numerical results of heuristic algorithms are compared with optimal solution, lower bound value and the best answer that gained among the examples.
期刊介绍:
In today"s global economy, the most successful engineering managers rely on a combination of technical skills and business principles. Industrial and systems engineering (ISE) aims at imparting fundamental knowledge to develop the ability to address complex industrial issues, emphasising on how to design, run, control and optimise production systems. The field of industrial engineering embraces a broad spectrum of technical activities including the classical techniques of work methods, production and facilities planning, quality control and safety. It also embraces the fields of human factors, operations research, manufacturing systems, and organisation and management systems.