华南雨季对流综合预报的不同初始扰动方法

IF 2.8 3区 地球科学 Q3 METEOROLOGY & ATMOSPHERIC SCIENCES Monthly Weather Review Pub Date : 2023-11-06 DOI:10.1175/mwr-d-23-0093.1
Xubin Zhang, Jingshan Li
{"title":"华南雨季对流综合预报的不同初始扰动方法","authors":"Xubin Zhang, Jingshan Li","doi":"10.1175/mwr-d-23-0093.1","DOIUrl":null,"url":null,"abstract":"Abstract In this study, downscaling, ensemble of data assimilation, time-lagging, and their combination were used to generate initial condition (IC) perturbations for 12-h convection-permitting ensemble forecasting for heavy-rainfall events over South China during the rainy season in 2013–2020. These events were classified as weak- and strong-forcing cases based on synoptic-scale forcing during the presummer rainy season and as landfalling tropical cyclone (TC) cases. This study investigated the impacts of various IC perturbation methods on multiscale characteristics of perturbations and the forecast performance for both nonprecipitation and precipitation variables. These perturbation methods represented different-source IC uncertainties and thus differed in multiscale characteristics of perturbations in vertical structures, horizontal distributions, and time evolution. Combination of various IC perturbation methods evidently increased perturbations or spreads of precipitation in both magnitude and location and thus improved the forecast-error estimation. Such an improvement was most and least evident for TC cases during the early and late forecasts, respectively, and was more evident for strong- than weak-forcing cases beyond 6 h. Combination of various IC perturbation methods generally improved both the ensemble-mean and probabilistic forecasts with case-dependent improvements. For heavy rainfall forecasting, 1–6-h improvements were most prominent for TC cases in terms of discrimination and accuracy, while 7–12-h improvements were least prominent for weak-forcing cases in terms of reliability and accuracy. In particular, the improvements in predicting weak-forcing cases increased with spatial errors. In contrast, for strong-forcing cases, the improvements were least and most prominent before and beyond 6 h, respectively.","PeriodicalId":18824,"journal":{"name":"Monthly Weather Review","volume":"18 6","pages":"0"},"PeriodicalIF":2.8000,"publicationDate":"2023-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Different Initial Condition Perturbation Methods for Convection-Permitting Ensemble Forecasting over South China during the Rainy Season\",\"authors\":\"Xubin Zhang, Jingshan Li\",\"doi\":\"10.1175/mwr-d-23-0093.1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract In this study, downscaling, ensemble of data assimilation, time-lagging, and their combination were used to generate initial condition (IC) perturbations for 12-h convection-permitting ensemble forecasting for heavy-rainfall events over South China during the rainy season in 2013–2020. These events were classified as weak- and strong-forcing cases based on synoptic-scale forcing during the presummer rainy season and as landfalling tropical cyclone (TC) cases. This study investigated the impacts of various IC perturbation methods on multiscale characteristics of perturbations and the forecast performance for both nonprecipitation and precipitation variables. These perturbation methods represented different-source IC uncertainties and thus differed in multiscale characteristics of perturbations in vertical structures, horizontal distributions, and time evolution. Combination of various IC perturbation methods evidently increased perturbations or spreads of precipitation in both magnitude and location and thus improved the forecast-error estimation. Such an improvement was most and least evident for TC cases during the early and late forecasts, respectively, and was more evident for strong- than weak-forcing cases beyond 6 h. Combination of various IC perturbation methods generally improved both the ensemble-mean and probabilistic forecasts with case-dependent improvements. For heavy rainfall forecasting, 1–6-h improvements were most prominent for TC cases in terms of discrimination and accuracy, while 7–12-h improvements were least prominent for weak-forcing cases in terms of reliability and accuracy. In particular, the improvements in predicting weak-forcing cases increased with spatial errors. In contrast, for strong-forcing cases, the improvements were least and most prominent before and beyond 6 h, respectively.\",\"PeriodicalId\":18824,\"journal\":{\"name\":\"Monthly Weather Review\",\"volume\":\"18 6\",\"pages\":\"0\"},\"PeriodicalIF\":2.8000,\"publicationDate\":\"2023-11-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Monthly Weather Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1175/mwr-d-23-0093.1\",\"RegionNum\":3,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"METEOROLOGY & ATMOSPHERIC SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Monthly Weather Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1175/mwr-d-23-0093.1","RegionNum":3,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"METEOROLOGY & ATMOSPHERIC SCIENCES","Score":null,"Total":0}
引用次数: 0

摘要

本文采用降尺度、数据同化集合、时间滞后及其组合方法,对2013-2020年华南雨季暴雨事件的12 h对流集合预报进行初始条件摄动(IC)模拟。根据夏前雨季天气尺度强迫将这些事件分为弱强迫和强强迫以及登陆热带气旋(TC)事件。本文研究了不同的IC摄动方法对扰动多尺度特征的影响,以及对非降水和降水变量的预报性能。这些摄动方法代表了不同来源的集成电路不确定性,因此在垂直结构、水平分布和时间演化方面的摄动多尺度特征不同。各种集成电路摄动方法的组合在量级和位置上明显增加了降水的摄动或扩展,从而提高了预报误差估计。这种改进分别在早期和后期预报中最明显和最不明显,并且在超过6 h的强强迫情况下比弱强迫情况更明显。各种IC摄动方法的组合通常改善了总体平均和概率预报,并具有个案相关的改进。在强降水预报中,1 ~ 6 h对TC情景的判别和精度的提高最为显著,而7 ~ 12 h对弱强迫情景的可靠性和精度的提高最不显著。特别是,预测弱强迫情况的改进随着空间误差的增加而增加。相比之下,强强迫情况下,改善在6 h前和6 h后分别最不明显和最显著。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Different Initial Condition Perturbation Methods for Convection-Permitting Ensemble Forecasting over South China during the Rainy Season
Abstract In this study, downscaling, ensemble of data assimilation, time-lagging, and their combination were used to generate initial condition (IC) perturbations for 12-h convection-permitting ensemble forecasting for heavy-rainfall events over South China during the rainy season in 2013–2020. These events were classified as weak- and strong-forcing cases based on synoptic-scale forcing during the presummer rainy season and as landfalling tropical cyclone (TC) cases. This study investigated the impacts of various IC perturbation methods on multiscale characteristics of perturbations and the forecast performance for both nonprecipitation and precipitation variables. These perturbation methods represented different-source IC uncertainties and thus differed in multiscale characteristics of perturbations in vertical structures, horizontal distributions, and time evolution. Combination of various IC perturbation methods evidently increased perturbations or spreads of precipitation in both magnitude and location and thus improved the forecast-error estimation. Such an improvement was most and least evident for TC cases during the early and late forecasts, respectively, and was more evident for strong- than weak-forcing cases beyond 6 h. Combination of various IC perturbation methods generally improved both the ensemble-mean and probabilistic forecasts with case-dependent improvements. For heavy rainfall forecasting, 1–6-h improvements were most prominent for TC cases in terms of discrimination and accuracy, while 7–12-h improvements were least prominent for weak-forcing cases in terms of reliability and accuracy. In particular, the improvements in predicting weak-forcing cases increased with spatial errors. In contrast, for strong-forcing cases, the improvements were least and most prominent before and beyond 6 h, respectively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Monthly Weather Review
Monthly Weather Review 地学-气象与大气科学
CiteScore
6.40
自引率
12.50%
发文量
186
审稿时长
3-6 weeks
期刊介绍: Monthly Weather Review (MWR) (ISSN: 0027-0644; eISSN: 1520-0493) publishes research relevant to the analysis and prediction of observed atmospheric circulations and physics, including technique development, data assimilation, model validation, and relevant case studies. This research includes numerical and data assimilation techniques that apply to the atmosphere and/or ocean environments. MWR also addresses phenomena having seasonal and subseasonal time scales.
期刊最新文献
Predicting fibrosis progression in non-alcoholic fatty liver disease patients using the FAST Score: A paired biopsy study. Improvement of albedo and snow-cover simulation during snow events over the Tibetan Plateau Influences of the South American Low-Level Jet on the Convective Environment in Central Argentina using a Convection-Permitting Simulation Orographic Controls on Extreme Precipitation associated with a Mei-yu Front The Response of Precipitation to Initial Soil Moisture over the Tibetan Plateau: Respective Effects of Boundary Layer Vertical Heat and Vapor Diffusions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1