IF 3.4 Q2 CONSTRUCTION & BUILDING TECHNOLOGY International Journal of Construction Management Pub Date : 2023-11-06 DOI:10.1080/15623599.2023.2276652
T. N. Liyanawatta, M. Francis, K. A. T. O. Ranadewa
{"title":"避免施工纠纷:合同前规划的综合框架","authors":"T. N. Liyanawatta, M. Francis, K. A. T. O. Ranadewa","doi":"10.1080/15623599.2023.2276652","DOIUrl":null,"url":null,"abstract":"AbstractMany industry disputes originate during the pre-contract stage, emphasizing the importance of preventing these issues early on rather than relying on post-facto resolutions. Therefore, professionals need to act proactively to avoid lapses in the pre-contract stage from the initial stage of the construction project. However, the current literature lacks an investigation of dispute avoidance by identifying professionals involved in the pre-contract phase of construction projects. This research, thus, aims to investigate the strategies to avoid disputes in construction projects in the pre-contract stage from the perspective of responsible professionals. The study adopted a qualitative approach by conducting semi-structured interviews among 15 industry practitioners involved in dispute management practices, selected through purposive sampling. The data collected was analyzed using the N-Vivo12. The findings revealed 48 lapses in the pre-contract stage and 104 strategies to avoid disputes. The findings further revealed that most of the lapses occurred during the technical stage. In contrast, the architects are responsible for design errors, and quantity surveyors contribute to documentation issues. The research offers a comprehensive framework for professionals and regulatory authorities to encourage dispute mitigation efforts, thereby contributing to the body of knowledge.Keywords: Dispute avoidancelapsespre-contractprofessionalsRIBA 2020strategies Disclosure statementNo potential conflict of interest was reported by the author(s).Data availability statementThe data that support the findings of this study are available from the corresponding author, [Liynawatta T.N.], upon reasonable request.","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":null,"pages":null},"PeriodicalIF":3.4000,"publicationDate":"2023-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Avoiding construction disputes: a comprehensive framework for pre-contract planning\",\"authors\":\"T. N. Liyanawatta, M. Francis, K. A. T. O. Ranadewa\",\"doi\":\"10.1080/15623599.2023.2276652\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"AbstractMany industry disputes originate during the pre-contract stage, emphasizing the importance of preventing these issues early on rather than relying on post-facto resolutions. Therefore, professionals need to act proactively to avoid lapses in the pre-contract stage from the initial stage of the construction project. However, the current literature lacks an investigation of dispute avoidance by identifying professionals involved in the pre-contract phase of construction projects. This research, thus, aims to investigate the strategies to avoid disputes in construction projects in the pre-contract stage from the perspective of responsible professionals. The study adopted a qualitative approach by conducting semi-structured interviews among 15 industry practitioners involved in dispute management practices, selected through purposive sampling. The data collected was analyzed using the N-Vivo12. The findings revealed 48 lapses in the pre-contract stage and 104 strategies to avoid disputes. The findings further revealed that most of the lapses occurred during the technical stage. In contrast, the architects are responsible for design errors, and quantity surveyors contribute to documentation issues. The research offers a comprehensive framework for professionals and regulatory authorities to encourage dispute mitigation efforts, thereby contributing to the body of knowledge.Keywords: Dispute avoidancelapsespre-contractprofessionalsRIBA 2020strategies Disclosure statementNo potential conflict of interest was reported by the author(s).Data availability statementThe data that support the findings of this study are available from the corresponding author, [Liynawatta T.N.], upon reasonable request.\",\"PeriodicalId\":47375,\"journal\":{\"name\":\"International Journal of Construction Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.4000,\"publicationDate\":\"2023-11-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Construction Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/15623599.2023.2276652\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/15623599.2023.2276652","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

摘要许多行业纠纷发生在合同前阶段,强调了早期预防这些问题的重要性,而不是依赖于事后解决。因此,专业人员需要从建设项目的初始阶段就主动采取行动,避免在合同前阶段出现失误。然而,目前的文献缺乏通过确定参与建设项目合同前阶段的专业人员来避免纠纷的调查。因此,本研究旨在从责任专业人员的角度,探讨在合同前阶段避免建筑项目纠纷的策略。本研究采用定性方法,通过有目的的抽样选择,对参与争议管理实践的15名行业从业者进行了半结构化访谈。使用N-Vivo12对收集的数据进行分析。调查结果揭示了合同前阶段的48个失误和104个避免纠纷的策略。调查结果进一步表明,大多数故障发生在技术阶段。相比之下,建筑师要对设计错误负责,而工料测量师要对文件问题负责。这项研究为专业人员和管理当局提供了一个全面的框架,以鼓励缓解争端的努力,从而促进知识体系。关键词:争议规避、合同前专业人员、riba 2020策略披露声明作者未报告潜在的利益冲突。数据可用性声明支持本研究结果的数据可根据合理要求从通讯作者[Liynawatta T.N.]处获得。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Avoiding construction disputes: a comprehensive framework for pre-contract planning
AbstractMany industry disputes originate during the pre-contract stage, emphasizing the importance of preventing these issues early on rather than relying on post-facto resolutions. Therefore, professionals need to act proactively to avoid lapses in the pre-contract stage from the initial stage of the construction project. However, the current literature lacks an investigation of dispute avoidance by identifying professionals involved in the pre-contract phase of construction projects. This research, thus, aims to investigate the strategies to avoid disputes in construction projects in the pre-contract stage from the perspective of responsible professionals. The study adopted a qualitative approach by conducting semi-structured interviews among 15 industry practitioners involved in dispute management practices, selected through purposive sampling. The data collected was analyzed using the N-Vivo12. The findings revealed 48 lapses in the pre-contract stage and 104 strategies to avoid disputes. The findings further revealed that most of the lapses occurred during the technical stage. In contrast, the architects are responsible for design errors, and quantity surveyors contribute to documentation issues. The research offers a comprehensive framework for professionals and regulatory authorities to encourage dispute mitigation efforts, thereby contributing to the body of knowledge.Keywords: Dispute avoidancelapsespre-contractprofessionalsRIBA 2020strategies Disclosure statementNo potential conflict of interest was reported by the author(s).Data availability statementThe data that support the findings of this study are available from the corresponding author, [Liynawatta T.N.], upon reasonable request.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
8.60
自引率
17.90%
发文量
112
期刊介绍: The International Journal of Construction Management publishes quality papers aiming to advance the knowledge of construction management. The Journal is devoted to the publication of original research including, but not limited to the following: Sustainable Construction (Green building; Carbon emission; Waste management; Energy saving) Construction life cycle management Construction informatics (Building information modelling; Information communication technology; Virtual design and construction) Smart construction (Robotics; Artificial intelligence; 3D printing) Big data for construction Legal issues in construction Public policies for construction Building and Infrastructures Health, safety and well-being in construction Risk management in construction Disaster management and resilience Construction procurement Construction management education
期刊最新文献
Assessing work-life balance strategies employed by Nigerian Builders Optimal design of diversion dams based on Upgraded Multi-Objective Particle Swarm Optimization (UMOPSO) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK An appraisal of barriers to digitalisation of construction industry in developing countries: perspective from India Critical barriers to effective communication in the construction industry: evidence from Nigeria
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1