{"title":"yuzhkuzbassugol JSC yerunakovskaya -viii矿分公司48-8开挖现场开发过程中处理工作面移动速率对近等高线土体状态变化影响应急态势发展的影响","authors":"V.V. Sementsov, V.A. Gogolin, I.A. Ermakova, A.A. Isachenko","doi":"10.18796/0041-5790-2023-4-37-41","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":489247,"journal":{"name":"Ugolʹ","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"INFLUENCE OF THE RATE OF MOVEMENT OF THE TREATMENT FACE DURING THE DEVELOPMENT OF THE EXCAVATION SITE AT 48-8 OF THE YERUNAKOVSKAYA –VIII MINE BRANCH OF YUZHKUZBASSUGOL JSC ON THE CHANGE IN THE STATE OF THE NEAR-CONTOUR GEOMASS AFFECTING THE DEVELOPMENT OF EMERGENCY SITUATIONS\",\"authors\":\"V.V. Sementsov, V.A. Gogolin, I.A. Ermakova, A.A. Isachenko\",\"doi\":\"10.18796/0041-5790-2023-4-37-41\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":489247,\"journal\":{\"name\":\"Ugolʹ\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ugolʹ\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18796/0041-5790-2023-4-37-41\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ugolʹ","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18796/0041-5790-2023-4-37-41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
INFLUENCE OF THE RATE OF MOVEMENT OF THE TREATMENT FACE DURING THE DEVELOPMENT OF THE EXCAVATION SITE AT 48-8 OF THE YERUNAKOVSKAYA –VIII MINE BRANCH OF YUZHKUZBASSUGOL JSC ON THE CHANGE IN THE STATE OF THE NEAR-CONTOUR GEOMASS AFFECTING THE DEVELOPMENT OF EMERGENCY SITUATIONS