{"title":"区域产业结构损害的早期估计:2020年7月暴雨对熊本县的损害","authors":"Keisuke MATSUSHIMA, Sakae MITSUI","doi":"10.2457/srs.53.53","DOIUrl":null,"url":null,"abstract":"Prompt implementation of measures according to the industrial structure of a region is indispensable for the reconstruction of affected areas. For that purpose, it is necessary to present the amount of damage at an early stage. This requires estimates of the damage to capital stock and impacts on production based on limited damage information, but methods have not been established.","PeriodicalId":38487,"journal":{"name":"Studies in Regional Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Early Estimation of Damage on Regional Industrial Structure: Damage in Kumamoto Prefecture Due to Heavy Rain in July 2020\",\"authors\":\"Keisuke MATSUSHIMA, Sakae MITSUI\",\"doi\":\"10.2457/srs.53.53\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Prompt implementation of measures according to the industrial structure of a region is indispensable for the reconstruction of affected areas. For that purpose, it is necessary to present the amount of damage at an early stage. This requires estimates of the damage to capital stock and impacts on production based on limited damage information, but methods have not been established.\",\"PeriodicalId\":38487,\"journal\":{\"name\":\"Studies in Regional Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Studies in Regional Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2457/srs.53.53\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Studies in Regional Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2457/srs.53.53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Social Sciences","Score":null,"Total":0}
Early Estimation of Damage on Regional Industrial Structure: Damage in Kumamoto Prefecture Due to Heavy Rain in July 2020
Prompt implementation of measures according to the industrial structure of a region is indispensable for the reconstruction of affected areas. For that purpose, it is necessary to present the amount of damage at an early stage. This requires estimates of the damage to capital stock and impacts on production based on limited damage information, but methods have not been established.