{"title":"基于NIST SP 800-34框架的容灾计划分析(案例研究:PT Wijaya Karya (Persero) Tbk)","authors":"Eric Dwi Pamungkas, Nenden Siti Fatonah, Gerry Firmansyah, Habibullah Akbar","doi":"10.59141/jiss.v4i09.879","DOIUrl":null,"url":null,"abstract":"PT Wijaya Karya (Persero) Tbk. (WIKA) is a state-owned company engaged in the construction sector and EPC is currently developing its business in the mining and investment sectors both at home and abroad. Information Technology is one of the supports to achieve its goals. The use of Information Technology is urgently needed by WIKA in order to increase the effectiveness and efficiency of the company's operational activities. In this regard, it is necessary to develop procedures for managing information technology resources to support WIKA's business continuity, which includes services for internal or external users. In the use of information technology, the Disaster Recovery Plan (DRP) is an important part of IT services in efforts to prevent Data Center Fail-Over caused by disasters. With the DRP procedure, it is expected that the Information Systems Bureau as the manager of WIKA's information technology can immediately anticipate if a Disturbance or Disaster occurs that has the potential to disrupt a large number (the majority) of processes or activities that are very critical for business continuity. This Disaster Recovery Plan is guided by the NIST SP 800-34 framework which begins with identifying and assessing risk, Business Impact Analysis (BIA), identification of preventive controls and preparation of contingency strategies.","PeriodicalId":500768,"journal":{"name":"Jurnal Indonesia Sosial Sains","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Disaster Recovery Plan Analysis Based on the NIST SP 800-34 Framework (Case Study: PT Wijaya Karya (Persero) Tbk.)\",\"authors\":\"Eric Dwi Pamungkas, Nenden Siti Fatonah, Gerry Firmansyah, Habibullah Akbar\",\"doi\":\"10.59141/jiss.v4i09.879\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT Wijaya Karya (Persero) Tbk. (WIKA) is a state-owned company engaged in the construction sector and EPC is currently developing its business in the mining and investment sectors both at home and abroad. Information Technology is one of the supports to achieve its goals. The use of Information Technology is urgently needed by WIKA in order to increase the effectiveness and efficiency of the company's operational activities. In this regard, it is necessary to develop procedures for managing information technology resources to support WIKA's business continuity, which includes services for internal or external users. In the use of information technology, the Disaster Recovery Plan (DRP) is an important part of IT services in efforts to prevent Data Center Fail-Over caused by disasters. With the DRP procedure, it is expected that the Information Systems Bureau as the manager of WIKA's information technology can immediately anticipate if a Disturbance or Disaster occurs that has the potential to disrupt a large number (the majority) of processes or activities that are very critical for business continuity. This Disaster Recovery Plan is guided by the NIST SP 800-34 framework which begins with identifying and assessing risk, Business Impact Analysis (BIA), identification of preventive controls and preparation of contingency strategies.\",\"PeriodicalId\":500768,\"journal\":{\"name\":\"Jurnal Indonesia Sosial Sains\",\"volume\":\"72 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Indonesia Sosial Sains\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59141/jiss.v4i09.879\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Indonesia Sosial Sains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59141/jiss.v4i09.879","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT Wijaya Karya (Persero) Tbk威卡(WIKA)是一家从事建筑行业的国有企业,EPC目前正在国内外开展采矿和投资领域的业务。信息技术是实现其目标的支持之一。威卡迫切需要使用信息技术,以提高公司运营活动的有效性和效率。在这方面,有必要制定管理信息技术资源的程序,以支持威卡的业务连续性,其中包括为内部或外部用户提供服务。在信息技术应用中,灾难恢复计划(Disaster Recovery Plan, DRP)是IT服务中防止灾难导致的数据中心故障转移(Data Center Fail-Over)的重要组成部分。通过DRP程序,作为威卡信息技术经理的信息系统局可以立即预测是否发生干扰或灾难,这些干扰或灾难有可能破坏对业务连续性非常重要的大量(大多数)流程或活动。该灾难恢复计划由NIST SP 800-34框架指导,该框架从识别和评估风险、业务影响分析(BIA)、识别预防控制和准备应急策略开始。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Disaster Recovery Plan Analysis Based on the NIST SP 800-34 Framework (Case Study: PT Wijaya Karya (Persero) Tbk.)
PT Wijaya Karya (Persero) Tbk. (WIKA) is a state-owned company engaged in the construction sector and EPC is currently developing its business in the mining and investment sectors both at home and abroad. Information Technology is one of the supports to achieve its goals. The use of Information Technology is urgently needed by WIKA in order to increase the effectiveness and efficiency of the company's operational activities. In this regard, it is necessary to develop procedures for managing information technology resources to support WIKA's business continuity, which includes services for internal or external users. In the use of information technology, the Disaster Recovery Plan (DRP) is an important part of IT services in efforts to prevent Data Center Fail-Over caused by disasters. With the DRP procedure, it is expected that the Information Systems Bureau as the manager of WIKA's information technology can immediately anticipate if a Disturbance or Disaster occurs that has the potential to disrupt a large number (the majority) of processes or activities that are very critical for business continuity. This Disaster Recovery Plan is guided by the NIST SP 800-34 framework which begins with identifying and assessing risk, Business Impact Analysis (BIA), identification of preventive controls and preparation of contingency strategies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Designing a Game Board to Educate Children in Getting to Know the History of the Majapahit Kingdom Digital-Based Sharia Marketing Strategy to Increase Sales at The Ciwaringin Natural Dye Writing Batik Center Cirebon Moral Values and Social Values in the Novel Sawitri dan Tujuh Pohon Kelahiran by Mashdar Zainal as an Effort to Select Learning Materials for Literary Appreciation Redesign of the Galaxy Gym Tembung Logo as Brand Identity Jayapura Regency Government's Strategy in Flood Disaster Management in Sentani District
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1