{"title":"一家锯木厂的改进干预建议:气密性软件","authors":"Felipe Facco Mendes Ferreira, Evandro Bezerra Soares, Priscila Pasti Barbosa","doi":"10.7769/gesec.v14i11.3120","DOIUrl":null,"url":null,"abstract":"With the competition that exists between the timber sector in Brazil, companies in this sector need to adapt to the market, where many of the causes that hinder companies are in the way in which internal activities are carried out. Within this issue, a process that generates problems within a company is the lack of Production Planning, Programming and Control (PPCP). The lack of PPCP causes delays in production and products are made without quality, thus damaging the company's name. Using quality tools and the PDCA cycle (Plan, Do, Check, Act), phenomenon and process analyzes were carried out. As a result, it was found that the lack of a PPCP was causing delays and losses for the company. In order to act on this problem, data on the processes and their causes were collected. Based on the data collected, PPCP software was created using the Airtable platform, which enabled solutions to problems involving delays in order delivery. Finally, the work achieved its objectives, meeting the company's needs and continuing with future improvements.","PeriodicalId":0,"journal":{"name":"","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-11-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Proposal for improvement intervention for a sawmill: airtable software\",\"authors\":\"Felipe Facco Mendes Ferreira, Evandro Bezerra Soares, Priscila Pasti Barbosa\",\"doi\":\"10.7769/gesec.v14i11.3120\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the competition that exists between the timber sector in Brazil, companies in this sector need to adapt to the market, where many of the causes that hinder companies are in the way in which internal activities are carried out. Within this issue, a process that generates problems within a company is the lack of Production Planning, Programming and Control (PPCP). The lack of PPCP causes delays in production and products are made without quality, thus damaging the company's name. Using quality tools and the PDCA cycle (Plan, Do, Check, Act), phenomenon and process analyzes were carried out. As a result, it was found that the lack of a PPCP was causing delays and losses for the company. In order to act on this problem, data on the processes and their causes were collected. Based on the data collected, PPCP software was created using the Airtable platform, which enabled solutions to problems involving delays in order delivery. Finally, the work achieved its objectives, meeting the company's needs and continuing with future improvements.\",\"PeriodicalId\":0,\"journal\":{\"name\":\"\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0,\"publicationDate\":\"2023-11-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7769/gesec.v14i11.3120\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7769/gesec.v14i11.3120","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于巴西木材部门之间存在竞争,该部门的公司需要适应市场,其中许多阻碍公司开展内部活动的原因。在这个问题中,在公司内部产生问题的一个过程是缺乏生产计划,编程和控制(PPCP)。缺乏PPCP导致生产延误,产品质量不高,从而损害了公司的声誉。运用质量工具和PDCA循环(计划、执行、检查、行动),对现象和过程进行分析。结果发现,缺乏PPCP给公司造成了延误和损失。为了解决这个问题,收集了有关过程及其原因的数据。基于收集到的数据,使用Airtable平台创建了PPCP软件,该软件能够解决涉及订单交付延迟的问题。最后,这项工作达到了目标,满足了公司的需求,并将继续改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
Proposal for improvement intervention for a sawmill: airtable software
With the competition that exists between the timber sector in Brazil, companies in this sector need to adapt to the market, where many of the causes that hinder companies are in the way in which internal activities are carried out. Within this issue, a process that generates problems within a company is the lack of Production Planning, Programming and Control (PPCP). The lack of PPCP causes delays in production and products are made without quality, thus damaging the company's name. Using quality tools and the PDCA cycle (Plan, Do, Check, Act), phenomenon and process analyzes were carried out. As a result, it was found that the lack of a PPCP was causing delays and losses for the company. In order to act on this problem, data on the processes and their causes were collected. Based on the data collected, PPCP software was created using the Airtable platform, which enabled solutions to problems involving delays in order delivery. Finally, the work achieved its objectives, meeting the company's needs and continuing with future improvements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1