{"title":"连续曲线箱梁桥支座更换过程中的设计、施工与监测-实例研究","authors":"Hongshuai Gao, Jiashuo Jian, Bochen Li, Yue Sun, Hongbo Liu","doi":"10.1080/15732479.2023.2266725","DOIUrl":null,"url":null,"abstract":"AbstractRubber bearing has been widely applied in bridge engineering because of its simple structure. During use, rubber bearings are prone to cracking, aging and shear deformation, which need to be replaced in time. In this paper, a bearing replacement project of continuous curved bridge in Lin’an, Zhejiang, China is taken as a case, and the design scheme, construction technology and construction monitoring of the bridge bearing replacement without interrupting traffic were proposed. Finite element model of this bridge was established, the jacking force and jacking height of this bridge were determined through analysis, and a scheme was designed for the reinforcement of piers. The construction process and specific construction technical points was introduced in detail. In addition, to determine and control the absolute safety of the jacking process, the jacking force, box-girder displacement, and bridge stress were monitored. The results show that the finite element analysis can provide technical guidance for the design theory of bearing replacement. The bearing replacement design scheme, construction technology and construction monitoring adopted in this project were safe and feasible. The research content has important reference significance for solving similar bridge bearing replacement projects in the future.Keywords: Bearing replacementbridge jackingconstruction monitoringcontinuous curved bridgefinite element analysisreinforcement scheme AcknowledgementsThe authors acknowledge the financial support provided by scientific research projects of basic scientific research expenses in Heilongjiang Provincial Colleges and Universities (2022-KYYWF-1094, 2021-KYYWF-0033), Key research and development plan guidance project in Heilongjiang Province (GZ20220083), Key Laboratory of Functional Inorganic Material Chemistry Ministry of Education (Heilongjiang University), Heilongjiang Provincial Universities Central Support Local Universities Reform and Development Funding, and Key research and development plan guidance project in Heilongjiang Province.Disclosure statementNo potential conflict of interest was reported by the authors.","PeriodicalId":49468,"journal":{"name":"Structure and Infrastructure Engineering","volume":"93 1","pages":"0"},"PeriodicalIF":2.6000,"publicationDate":"2023-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design, construction and monitoring of continuous curved box girder bridge during bearing replacement-case study\",\"authors\":\"Hongshuai Gao, Jiashuo Jian, Bochen Li, Yue Sun, Hongbo Liu\",\"doi\":\"10.1080/15732479.2023.2266725\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"AbstractRubber bearing has been widely applied in bridge engineering because of its simple structure. During use, rubber bearings are prone to cracking, aging and shear deformation, which need to be replaced in time. In this paper, a bearing replacement project of continuous curved bridge in Lin’an, Zhejiang, China is taken as a case, and the design scheme, construction technology and construction monitoring of the bridge bearing replacement without interrupting traffic were proposed. Finite element model of this bridge was established, the jacking force and jacking height of this bridge were determined through analysis, and a scheme was designed for the reinforcement of piers. The construction process and specific construction technical points was introduced in detail. In addition, to determine and control the absolute safety of the jacking process, the jacking force, box-girder displacement, and bridge stress were monitored. The results show that the finite element analysis can provide technical guidance for the design theory of bearing replacement. The bearing replacement design scheme, construction technology and construction monitoring adopted in this project were safe and feasible. The research content has important reference significance for solving similar bridge bearing replacement projects in the future.Keywords: Bearing replacementbridge jackingconstruction monitoringcontinuous curved bridgefinite element analysisreinforcement scheme AcknowledgementsThe authors acknowledge the financial support provided by scientific research projects of basic scientific research expenses in Heilongjiang Provincial Colleges and Universities (2022-KYYWF-1094, 2021-KYYWF-0033), Key research and development plan guidance project in Heilongjiang Province (GZ20220083), Key Laboratory of Functional Inorganic Material Chemistry Ministry of Education (Heilongjiang University), Heilongjiang Provincial Universities Central Support Local Universities Reform and Development Funding, and Key research and development plan guidance project in Heilongjiang Province.Disclosure statementNo potential conflict of interest was reported by the authors.\",\"PeriodicalId\":49468,\"journal\":{\"name\":\"Structure and Infrastructure Engineering\",\"volume\":\"93 1\",\"pages\":\"0\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2023-10-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Structure and Infrastructure Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/15732479.2023.2266725\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structure and Infrastructure Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/15732479.2023.2266725","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

摘要橡胶支座因其结构简单,在桥梁工程中得到了广泛的应用。在使用过程中,橡胶支座容易出现开裂、老化和剪切变形,需要及时更换。本文以浙江临安某连续曲线桥支座更换工程为例,提出了不中断交通的桥梁支座更换的设计方案、施工技术和施工监控。建立了该桥的有限元模型,通过分析确定了该桥的顶推力和顶高,并设计了桥墩加固方案。详细介绍了施工过程和具体施工技术要点。此外,为了确定和控制顶进过程的绝对安全,对顶进力、箱梁位移和桥梁应力进行了监测。结果表明,有限元分析可以为轴承更换的设计理论提供技术指导。本工程采用的轴承更换设计方案、施工工艺及施工监控安全可行。研究内容对今后解决类似桥梁支座更换工程具有重要的参考意义。关键词:本文感谢黑龙江省高校基础科研经费科研项目(2022-KYYWF-1094、2021-KYYWF-0033)、黑龙江省重点研发计划指导项目(GZ20220083)、功能无机材料化学教育部重点实验室(黑龙江大学)、黑龙江省高校中央支持地方高校改革发展专项资金、黑龙江省重点研发计划指导项目。披露声明作者未报告潜在的利益冲突。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design, construction and monitoring of continuous curved box girder bridge during bearing replacement-case study
AbstractRubber bearing has been widely applied in bridge engineering because of its simple structure. During use, rubber bearings are prone to cracking, aging and shear deformation, which need to be replaced in time. In this paper, a bearing replacement project of continuous curved bridge in Lin’an, Zhejiang, China is taken as a case, and the design scheme, construction technology and construction monitoring of the bridge bearing replacement without interrupting traffic were proposed. Finite element model of this bridge was established, the jacking force and jacking height of this bridge were determined through analysis, and a scheme was designed for the reinforcement of piers. The construction process and specific construction technical points was introduced in detail. In addition, to determine and control the absolute safety of the jacking process, the jacking force, box-girder displacement, and bridge stress were monitored. The results show that the finite element analysis can provide technical guidance for the design theory of bearing replacement. The bearing replacement design scheme, construction technology and construction monitoring adopted in this project were safe and feasible. The research content has important reference significance for solving similar bridge bearing replacement projects in the future.Keywords: Bearing replacementbridge jackingconstruction monitoringcontinuous curved bridgefinite element analysisreinforcement scheme AcknowledgementsThe authors acknowledge the financial support provided by scientific research projects of basic scientific research expenses in Heilongjiang Provincial Colleges and Universities (2022-KYYWF-1094, 2021-KYYWF-0033), Key research and development plan guidance project in Heilongjiang Province (GZ20220083), Key Laboratory of Functional Inorganic Material Chemistry Ministry of Education (Heilongjiang University), Heilongjiang Provincial Universities Central Support Local Universities Reform and Development Funding, and Key research and development plan guidance project in Heilongjiang Province.Disclosure statementNo potential conflict of interest was reported by the authors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Structure and Infrastructure Engineering
Structure and Infrastructure Engineering 工程技术-工程:机械
CiteScore
9.50
自引率
8.10%
发文量
131
审稿时长
5.3 months
期刊介绍: Structure and Infrastructure Engineering - Maintenance, Management, Life-Cycle Design and Performance is an international Journal dedicated to recent advances in maintenance, management and life-cycle performance of a wide range of infrastructures, such as: buildings, bridges, dams, railways, underground constructions, offshore platforms, pipelines, naval vessels, ocean structures, nuclear power plants, airplanes and other types of structures including aerospace and automotive structures. The Journal presents research and developments on the most advanced technologies for analyzing, predicting and optimizing infrastructure performance. The main gaps to be filled are those between researchers and practitioners in maintenance, management and life-cycle performance of infrastructure systems, and those between professionals working on different types of infrastructures. To this end, the journal will provide a forum for a broad blend of scientific, technical and practical papers. The journal is endorsed by the International Association for Life-Cycle Civil Engineering ( IALCCE) and the International Association for Bridge Maintenance and Safety ( IABMAS).
期刊最新文献
Vibration based dual-criteria damage detection method using deep neural networks in highway bridges with steel girders Numerical study on flexural behaviour of sulphate corroded RC beams strengthened with ultra-high-performance concrete A boosted deep learning-based approach for near real-time response estimation of structures under ground motion excitations Structural frequency-based maintenance management method for steel truss bridges under atmospheric corrosion Investigation of the time-dependent bearing capacities of concrete structures in different environments considering climate change
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1