潘当岛灯塔混合(光伏/柴油)发电机的功率流分析

{"title":"潘当岛灯塔混合(光伏/柴油)发电机的功率流分析","authors":"","doi":"10.30596/rmme.v6i2.14224","DOIUrl":null,"url":null,"abstract":"Study of power flow analysis to obtain information about the flow of power or voltage in an electric power system. As time goes by and the number of tourists on Pandang Island, especially in the development and change sector, will also increase, the amount of burden incurred will also increase, so that a good initial design is no longer suitable for the current load. For this reason, it is necessary to analyze the power flow in order to determine the condition of the electric power system. The benefits of this research are also for planning evaluation if there will be additional burden innovations. In this study, ETAP Power Station 19.0 software was used using Newton Raphson for power flow simulation. The results obtained in the Etap simulation are 37% generating load with a total active power of 10.35 KW, reactive power of 6.85 Kvar, and apparent power of 12.42 KVA. This research also increases the load by 4,800 watts, where the photovoltaic generator must increase the photovoltaic capacity from the previous 10.26 kw to 13.29 kw, therefore solar cell panels will be added as many as 8 panels.","PeriodicalId":53345,"journal":{"name":"Jurnal Energi Dan Manufaktur","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Aliran Daya Pembangkit Hybrid (Photovoltaic/Diesel) Pada Menara Mercusuar Di Pulau Pandang\",\"authors\":\"\",\"doi\":\"10.30596/rmme.v6i2.14224\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Study of power flow analysis to obtain information about the flow of power or voltage in an electric power system. As time goes by and the number of tourists on Pandang Island, especially in the development and change sector, will also increase, the amount of burden incurred will also increase, so that a good initial design is no longer suitable for the current load. For this reason, it is necessary to analyze the power flow in order to determine the condition of the electric power system. The benefits of this research are also for planning evaluation if there will be additional burden innovations. In this study, ETAP Power Station 19.0 software was used using Newton Raphson for power flow simulation. The results obtained in the Etap simulation are 37% generating load with a total active power of 10.35 KW, reactive power of 6.85 Kvar, and apparent power of 12.42 KVA. This research also increases the load by 4,800 watts, where the photovoltaic generator must increase the photovoltaic capacity from the previous 10.26 kw to 13.29 kw, therefore solar cell panels will be added as many as 8 panels.\",\"PeriodicalId\":53345,\"journal\":{\"name\":\"Jurnal Energi Dan Manufaktur\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Energi Dan Manufaktur\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30596/rmme.v6i2.14224\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Energi Dan Manufaktur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30596/rmme.v6i2.14224","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

研究潮流分析,以获得电力系统中功率或电压的流动信息。随着时间的推移和在盘东岛的游客数量,特别是在开发和变化部门,也会增加,所产生的负担量也会增加,以至于一个好的初始设计不再适合目前的负荷。为此,有必要对潮流进行分析,以确定电力系统的状态。这项研究的好处也可用于规划评价,如果会有额外的负担创新。本研究使用ETAP Power Station 19.0软件,采用Newton Raphson进行潮流模拟。Etap仿真的结果为:发电负荷为37%,总有功功率为10.35 KW,无功功率为6.85 Kvar,视在功率为12.42 KVA。本研究还增加了4800瓦的负荷,其中光伏发电机必须将光伏容量从之前的10.26千瓦增加到13.29千瓦,因此太阳能电池板将增加多达8块。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analisis Aliran Daya Pembangkit Hybrid (Photovoltaic/Diesel) Pada Menara Mercusuar Di Pulau Pandang
Study of power flow analysis to obtain information about the flow of power or voltage in an electric power system. As time goes by and the number of tourists on Pandang Island, especially in the development and change sector, will also increase, the amount of burden incurred will also increase, so that a good initial design is no longer suitable for the current load. For this reason, it is necessary to analyze the power flow in order to determine the condition of the electric power system. The benefits of this research are also for planning evaluation if there will be additional burden innovations. In this study, ETAP Power Station 19.0 software was used using Newton Raphson for power flow simulation. The results obtained in the Etap simulation are 37% generating load with a total active power of 10.35 KW, reactive power of 6.85 Kvar, and apparent power of 12.42 KVA. This research also increases the load by 4,800 watts, where the photovoltaic generator must increase the photovoltaic capacity from the previous 10.26 kw to 13.29 kw, therefore solar cell panels will be added as many as 8 panels.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
13
审稿时长
24 weeks
期刊最新文献
Penggunaan Las Gesek (Friction Welding) Guna Penyambungan Dua Buah Logam Baja Karbon ST 42 pada Pengujian Tarik dan Struktur Mikro untuk Spring Pin pada Mobil STUDI EKSPERIMENTAL NATURAL REFIGERANT DENGAN VARIASI DIAMETER TiT-HEAT EXCHANGER TERHADAP REFRIGERATOR PERFORMANCE Sintesis kapsul mikro poli (urea-formaldehid) berisi minyak biji rami sebagai self-healing coating dengan variasi kecepatan agitasi Analisis Pengaruh Waktu Etsa Terhadap Ukuran Struktur Mikrografi Material Logam dan Paduannya Analisis Audit Energi di Gedung Teknik Elektro Universitas Diponegoro
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1