{"title":"图森在斯普林维尔增加了第一太阳能模块","authors":"","doi":"10.1016/S1473-8325(03)01004-6","DOIUrl":null,"url":null,"abstract":"<div><p>In Arizona, First Solar has supplied two PV arrays totalling 240 kWp for Tucson Electric Power (TEP) at the company’s Springerville Generating Station.</p><p>This is a short news story only. Visit <span>www.re-focus.net</span><svg><path></path></svg> for the latest renewable energy industry news.</p></div>","PeriodicalId":101022,"journal":{"name":"Photovoltaics Bulletin","volume":"2003 10","pages":"Page 2"},"PeriodicalIF":0.0000,"publicationDate":"2003-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1473-8325(03)01004-6","citationCount":"0","resultStr":"{\"title\":\"Tucson adds First Solar modules at Springerville\",\"authors\":\"\",\"doi\":\"10.1016/S1473-8325(03)01004-6\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>In Arizona, First Solar has supplied two PV arrays totalling 240 kWp for Tucson Electric Power (TEP) at the company’s Springerville Generating Station.</p><p>This is a short news story only. Visit <span>www.re-focus.net</span><svg><path></path></svg> for the latest renewable energy industry news.</p></div>\",\"PeriodicalId\":101022,\"journal\":{\"name\":\"Photovoltaics Bulletin\",\"volume\":\"2003 10\",\"pages\":\"Page 2\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1473-8325(03)01004-6\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Photovoltaics Bulletin\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1473832503010046\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Photovoltaics Bulletin","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1473832503010046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
In Arizona, First Solar has supplied two PV arrays totalling 240 kWp for Tucson Electric Power (TEP) at the company’s Springerville Generating Station.
This is a short news story only. Visit www.re-focus.net for the latest renewable energy industry news.