不确定条件下制造系统调度的截止日期报价模型

Zhiguo Wang, Tsan Sheng Ng, Chee Khiang Pang
{"title":"不确定条件下制造系统调度的截止日期报价模型","authors":"Zhiguo Wang, Tsan Sheng Ng, Chee Khiang Pang","doi":"10.1007/s10626-020-00332-y","DOIUrl":null,"url":null,"abstract":"This paper studies the scheduling problem for the manufacturing systems with uncertain job duration, and the possibility of planning due-date quotations for critical manufacturing tasks given a fixed contingency budget. We propose a due-date quotation model to measure the risk of delay in the manufacturing process in terms of the allocated contingency budget. The risk of delay is measured in the same unit as its corresponding milestone factor such that the decision makers could directly visualize and quantify the level of risks in units of hours or days. In addition, the proposed model possesses various great properties required by a convex risk measure and it represents a minimized certainty equivalent of the overall expected risk in achieving the manufacturing due-dates. Extensive computational experiments are conducted to evaluate the model performance. The results show that our proposed model, compared to various existing methods, provides a much more balanced performance in terms of success rate of due-date achievement, due-date quotation shortfall, as well as, robustness against uncertainties. The practical applicability of the proposed models are also tested with the job scheduling problem in a real stamping industry application.","PeriodicalId":92890,"journal":{"name":"Discrete event dynamic systems","volume":"25 70","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Due-date quotation model for manufacturing system scheduling under uncertainty\",\"authors\":\"Zhiguo Wang, Tsan Sheng Ng, Chee Khiang Pang\",\"doi\":\"10.1007/s10626-020-00332-y\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies the scheduling problem for the manufacturing systems with uncertain job duration, and the possibility of planning due-date quotations for critical manufacturing tasks given a fixed contingency budget. We propose a due-date quotation model to measure the risk of delay in the manufacturing process in terms of the allocated contingency budget. The risk of delay is measured in the same unit as its corresponding milestone factor such that the decision makers could directly visualize and quantify the level of risks in units of hours or days. In addition, the proposed model possesses various great properties required by a convex risk measure and it represents a minimized certainty equivalent of the overall expected risk in achieving the manufacturing due-dates. Extensive computational experiments are conducted to evaluate the model performance. The results show that our proposed model, compared to various existing methods, provides a much more balanced performance in terms of success rate of due-date achievement, due-date quotation shortfall, as well as, robustness against uncertainties. The practical applicability of the proposed models are also tested with the job scheduling problem in a real stamping industry application.\",\"PeriodicalId\":92890,\"journal\":{\"name\":\"Discrete event dynamic systems\",\"volume\":\"25 70\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-01-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Discrete event dynamic systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/s10626-020-00332-y\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Discrete event dynamic systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/s10626-020-00332-y","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

研究了具有不确定工期的制造系统的调度问题,以及在给定固定的应急预算的情况下,关键制造任务计划截止日期报价的可能性。我们提出了一个截止日期报价模型来衡量在分配的应急预算制造过程中的延迟风险。延迟的风险以与其相应的里程碑因素相同的单位来度量,这样决策者可以直接以小时或天为单位来可视化和量化风险水平。此外,所提出的模型具有凸风险度量所需的各种重要性质,并且它表示实现制造截止日期的总体预期风险的最小化确定性当量。进行了大量的计算实验来评估模型的性能。结果表明,与各种现有方法相比,我们提出的模型在到期日期成就的成功率,到期日期报价不足以及对不确定性的鲁棒性方面提供了更加平衡的性能。并以冲压行业的实际作业调度问题为例,验证了所提模型的实用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Due-date quotation model for manufacturing system scheduling under uncertainty
This paper studies the scheduling problem for the manufacturing systems with uncertain job duration, and the possibility of planning due-date quotations for critical manufacturing tasks given a fixed contingency budget. We propose a due-date quotation model to measure the risk of delay in the manufacturing process in terms of the allocated contingency budget. The risk of delay is measured in the same unit as its corresponding milestone factor such that the decision makers could directly visualize and quantify the level of risks in units of hours or days. In addition, the proposed model possesses various great properties required by a convex risk measure and it represents a minimized certainty equivalent of the overall expected risk in achieving the manufacturing due-dates. Extensive computational experiments are conducted to evaluate the model performance. The results show that our proposed model, compared to various existing methods, provides a much more balanced performance in terms of success rate of due-date achievement, due-date quotation shortfall, as well as, robustness against uncertainties. The practical applicability of the proposed models are also tested with the job scheduling problem in a real stamping industry application.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Reducing the computational effort of symbolic supervisor synthesis An extremum timed extended reachability graph for temporal analysis of time Petri nets Diagnosability and attack detection for discrete event systems under sensor attacks A tropical-algebraic method for the control of timed event graphs with partial synchronization MGF-based SNC for stationary independent Markovian processes with localized application of martingales
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1