{"title":"基于工厂的生产函数和基于机组的生产函数在有共同水道的水电站的日前能源和储备调度中的比较","authors":"J. Pérez-Díaz, Jesús González-Martínez","doi":"10.1007/s12667-023-00643-7","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":11825,"journal":{"name":"Energy Systems","volume":"45 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparison between plant-based and unit-based production functions for the day-ahead energy and reserve scheduling of a hydropower plant with common waterways\",\"authors\":\"J. Pérez-Díaz, Jesús González-Martínez\",\"doi\":\"10.1007/s12667-023-00643-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":11825,\"journal\":{\"name\":\"Energy Systems\",\"volume\":\"45 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energy Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/s12667-023-00643-7\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/s12667-023-00643-7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Comparison between plant-based and unit-based production functions for the day-ahead energy and reserve scheduling of a hydropower plant with common waterways