{"title":"具有随机持续时间的工程应用和项目中的激励模型分析","authors":"J. Zhao, J.F. Su","doi":"10.14743/apem2023.4.487","DOIUrl":null,"url":null,"abstract":"Incentives are quite common to be utilized in engineering applications such as some infrastructure development projects or construction projects. Due to the increasing complexity of construction management and the continuing trend towards outsourcing of component or engineering outsourcing activities, we focus on the issue of incentive design. Time collaboration is one of the main focuses of random project duration time in parallel projects. In this article, we consider a setting where a manufacturer outsources two parallel subtasks to two different suppliers, and the manufacturer is time sensitive. On the premise that the project completion time follows the exponential distribution, some models are established to compare the proposed incentives and we get the comparative analysis of the proposed incentives. This paper puts forward three kinds of time-based incentive mechanisms, namely, deadline incentive mechanism, competition mechanism and mixed incentive mechanism. We do modeling analysis for all incentive mechanisms. We get the optimal work rates determined by suppliers and compare various incentive mechanisms to maximize manufacturers' profits.","PeriodicalId":445710,"journal":{"name":"Advances in Production Engineering & Management","volume":"18 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Incentive modeling analysis in engineering applications and projects with stochastic duration time\",\"authors\":\"J. Zhao, J.F. Su\",\"doi\":\"10.14743/apem2023.4.487\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Incentives are quite common to be utilized in engineering applications such as some infrastructure development projects or construction projects. Due to the increasing complexity of construction management and the continuing trend towards outsourcing of component or engineering outsourcing activities, we focus on the issue of incentive design. Time collaboration is one of the main focuses of random project duration time in parallel projects. In this article, we consider a setting where a manufacturer outsources two parallel subtasks to two different suppliers, and the manufacturer is time sensitive. On the premise that the project completion time follows the exponential distribution, some models are established to compare the proposed incentives and we get the comparative analysis of the proposed incentives. This paper puts forward three kinds of time-based incentive mechanisms, namely, deadline incentive mechanism, competition mechanism and mixed incentive mechanism. We do modeling analysis for all incentive mechanisms. We get the optimal work rates determined by suppliers and compare various incentive mechanisms to maximize manufacturers' profits.\",\"PeriodicalId\":445710,\"journal\":{\"name\":\"Advances in Production Engineering & Management\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Production Engineering & Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14743/apem2023.4.487\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Production Engineering & Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14743/apem2023.4.487","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

激励机制在工程应用中十分常见,如一些基础设施开发项目或建筑项目。由于施工管理的复杂性不断增加,以及组件或工程外包活动的持续趋势,我们将重点放在激励设计问题上。时间协作是并行项目中随机项目工期时间的重点之一。在本文中,我们考虑这样一种情况:制造商将两个并行的子任务外包给两个不同的供应商,制造商对时间非常敏感。在项目完成时间服从指数分布的前提下,建立了一些模型来比较所提出的激励措施,并对所提出的激励措施进行了比较分析。本文提出了三种基于时间的激励机制,即限期激励机制、竞争机制和混合激励机制。我们对所有激励机制进行了建模分析。我们得到了由供应商决定的最优工作率,并对各种激励机制进行了比较,以实现制造商利润的最大化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Incentive modeling analysis in engineering applications and projects with stochastic duration time
Incentives are quite common to be utilized in engineering applications such as some infrastructure development projects or construction projects. Due to the increasing complexity of construction management and the continuing trend towards outsourcing of component or engineering outsourcing activities, we focus on the issue of incentive design. Time collaboration is one of the main focuses of random project duration time in parallel projects. In this article, we consider a setting where a manufacturer outsources two parallel subtasks to two different suppliers, and the manufacturer is time sensitive. On the premise that the project completion time follows the exponential distribution, some models are established to compare the proposed incentives and we get the comparative analysis of the proposed incentives. This paper puts forward three kinds of time-based incentive mechanisms, namely, deadline incentive mechanism, competition mechanism and mixed incentive mechanism. We do modeling analysis for all incentive mechanisms. We get the optimal work rates determined by suppliers and compare various incentive mechanisms to maximize manufacturers' profits.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optimizing smart manufacturing systems using digital twin IoT-based Deep Learning Neural Network (DLNN) algorithm for voltage stability control and monitoring of solar power generation Reduction of surface defects by optimization of casting speed using genetic programming: An industrial case study Incentive modeling analysis in engineering applications and projects with stochastic duration time Comparing Fault Tree Analysis methods combined with Generalized Grey Relation Analysis: A new approach and case study in the automotive industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1