{"title":"案例研究基准计划的时间偏差分析:克罗地亚共和国学校建设项目钢筋混凝土工程的实施情况","authors":"Ksenija Tijanić Štrok, D. Car-Pušić, Filip Marfan","doi":"10.47960/2232-9080.2023.26.13.64","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":507246,"journal":{"name":"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta","volume":"158 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Time deviation analysis of the baseline plan on the case study: Implementation of reinforced concrete works on a school construction project in the Republic of Croatia\",\"authors\":\"Ksenija Tijanić Štrok, D. Car-Pušić, Filip Marfan\",\"doi\":\"10.47960/2232-9080.2023.26.13.64\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":507246,\"journal\":{\"name\":\"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta\",\"volume\":\"158 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47960/2232-9080.2023.26.13.64\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47960/2232-9080.2023.26.13.64","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Time deviation analysis of the baseline plan on the case study: Implementation of reinforced concrete works on a school construction project in the Republic of Croatia