优化采矿工程,以获得和安装外观一致的规格石材

Ivo Galić, Ivica Pavičić, Branimir Farkaš, Ž. Duić
{"title":"优化采矿工程,以获得和安装外观一致的规格石材","authors":"Ivo Galić, Ivica Pavičić, Branimir Farkaš, Ž. Duić","doi":"10.47960/2232-9080.2023.si.13.15","DOIUrl":null,"url":null,"abstract":": Deposits of dimension stone (hereinafter: DS) are mostly of heterogeneous composition and non-uniform properties. For the purpose of exploring the DS deposit, it is necessary to perform certain mining work in order to collect data for the determination of: existence, position and shape of the bed, quantity and quality, and the conditions for exploitation of DS. The position and shape of the deposit have a crucial influence on DS exploitation conditions. Discontinuities of different positions, dimensions and shapes were formed as a result of dynamic and chemical processes in the rocks. The exploitation of DS from the deposit is performed by obtaining as geometrically regular and as large in size blocks as possible. The DS exploitation should be harmonized with the position and shape of the deposit as well as discontinuities for the purpose of obtaining the highest possible exploitation of stone. However, a special requirement of construction is to obtain the DS, primarily of uniform appearance and other properties. Therefore, it is necessary to optimize mining works for the purpose of obtaining and installing DS of a uniform appearance, as described and shown on several examples in this paper.","PeriodicalId":507246,"journal":{"name":"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta","volume":"68 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of mining works for the purpose of obtaining and installing the dimension stone of a uniform appearance\",\"authors\":\"Ivo Galić, Ivica Pavičić, Branimir Farkaš, Ž. Duić\",\"doi\":\"10.47960/2232-9080.2023.si.13.15\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Deposits of dimension stone (hereinafter: DS) are mostly of heterogeneous composition and non-uniform properties. For the purpose of exploring the DS deposit, it is necessary to perform certain mining work in order to collect data for the determination of: existence, position and shape of the bed, quantity and quality, and the conditions for exploitation of DS. The position and shape of the deposit have a crucial influence on DS exploitation conditions. Discontinuities of different positions, dimensions and shapes were formed as a result of dynamic and chemical processes in the rocks. The exploitation of DS from the deposit is performed by obtaining as geometrically regular and as large in size blocks as possible. The DS exploitation should be harmonized with the position and shape of the deposit as well as discontinuities for the purpose of obtaining the highest possible exploitation of stone. However, a special requirement of construction is to obtain the DS, primarily of uniform appearance and other properties. Therefore, it is necessary to optimize mining works for the purpose of obtaining and installing DS of a uniform appearance, as described and shown on several examples in this paper.\",\"PeriodicalId\":507246,\"journal\":{\"name\":\"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta\",\"volume\":\"68 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47960/2232-9080.2023.si.13.15\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"E-Zbornik, elektronički zbornik radova Građevinskog fakulteta","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47960/2232-9080.2023.si.13.15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

:尺寸石(以下简称 "尺寸石")矿床大多具有不同的成分和不均匀的特性。为了勘探尺寸石矿床,有必要进行一定的采矿工作,以收集数据,确定:矿床的存在、位置和形状、数量和质量,以及尺寸石的开采条件。矿床的位置和形状对DS的开采条件有着至关重要的影响。不同位置、尺寸和形状的断块是岩石中动态和化学过程的结果。从矿床中开采矽卡岩的方法是尽可能获得几何形状规则、尺寸较大的岩块。石材开采应与矿床的位置和形状以及不连续性相协调,以获得尽可能高的石材开采量。然而,建筑工程的一个特殊要求是获得主要具有统一外观和其他特性的石材。因此,有必要优化采矿工程,以获得和安装外观一致的石材,本文中的几个实例对此进行了描述和展示。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimization of mining works for the purpose of obtaining and installing the dimension stone of a uniform appearance
: Deposits of dimension stone (hereinafter: DS) are mostly of heterogeneous composition and non-uniform properties. For the purpose of exploring the DS deposit, it is necessary to perform certain mining work in order to collect data for the determination of: existence, position and shape of the bed, quantity and quality, and the conditions for exploitation of DS. The position and shape of the deposit have a crucial influence on DS exploitation conditions. Discontinuities of different positions, dimensions and shapes were formed as a result of dynamic and chemical processes in the rocks. The exploitation of DS from the deposit is performed by obtaining as geometrically regular and as large in size blocks as possible. The DS exploitation should be harmonized with the position and shape of the deposit as well as discontinuities for the purpose of obtaining the highest possible exploitation of stone. However, a special requirement of construction is to obtain the DS, primarily of uniform appearance and other properties. Therefore, it is necessary to optimize mining works for the purpose of obtaining and installing DS of a uniform appearance, as described and shown on several examples in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Excavation of the foundation of piers S1L and S1R of the Vranduk I bridge by controlled blasting on the motorway route: Zenica Municipality Northern Administrative Boundary - Zenica North Life cycle cost analysis of an office building Giant stone buildings (III) - Cyclopean and other buildings of more developed architecture Variability analysis of the river flow – case study of river Gornja Dobra, Croatia Analyzing the possibility of using the internal energy of part of the Posušje municipality water supply system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1