使用从图到表法改进生产区设施布局的建议(案例研究:PT.)

Muhammad Ivan Yudha Rifdhani, Hidayat Hidayat, Akhmad wasiur Rizqi
{"title":"使用从图到表法改进生产区设施布局的建议(案例研究:PT.)","authors":"Muhammad Ivan Yudha Rifdhani, Hidayat Hidayat, Akhmad wasiur Rizqi","doi":"10.32672/jse.v8i4.6677","DOIUrl":null,"url":null,"abstract":"An industry, both in the help and assembling areas, unquestionably has a few offices to help its creation cycle. Office design connects with the area, format, floor plan, equipment, and exercises related with the work environment. Different sorts of data from research led by finishing direct discernments and assessments made by areas on organizations taking part in the assembling of woven sarong materials at PT. Ibrahim Bin Manrapi which is situated on Jl. Malik Ibrahim Gresik, 24-26. in view of the discoveries of the examination of PT. In terms of format prior to design planning, PT. Ibrahim Bin Manrapi 's container is that there are still many areas that are not utilized to their full potential, and there are still many distances between offices that must be expanded as much as possible. From the technique for making the stream before the platform, there is a material conveyance distance of 102 m. Given the effect of information the board from the issues seen by PT. Ibrahim Bin Manrapi saw a lack in the plan so the gathering cycle went poorly and the conveyed item couldn't be anticipated to be great. This course of action should be possible by arranging the arrangement of the assembling office utilizing the From To Chart (FTC) procedure to restrict forward and backward during the assembling cooperation (Backtracking).","PeriodicalId":17758,"journal":{"name":"Jurnal Serambi Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Usulan Perbaikan Tata Letak Fasilitas Pada Area Produksi Menggunakan Metode From to Chart (Studi Kasus: PT. Ibrahim Bin Manrapi)\",\"authors\":\"Muhammad Ivan Yudha Rifdhani, Hidayat Hidayat, Akhmad wasiur Rizqi\",\"doi\":\"10.32672/jse.v8i4.6677\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An industry, both in the help and assembling areas, unquestionably has a few offices to help its creation cycle. Office design connects with the area, format, floor plan, equipment, and exercises related with the work environment. Different sorts of data from research led by finishing direct discernments and assessments made by areas on organizations taking part in the assembling of woven sarong materials at PT. Ibrahim Bin Manrapi which is situated on Jl. Malik Ibrahim Gresik, 24-26. in view of the discoveries of the examination of PT. In terms of format prior to design planning, PT. Ibrahim Bin Manrapi 's container is that there are still many areas that are not utilized to their full potential, and there are still many distances between offices that must be expanded as much as possible. From the technique for making the stream before the platform, there is a material conveyance distance of 102 m. Given the effect of information the board from the issues seen by PT. Ibrahim Bin Manrapi saw a lack in the plan so the gathering cycle went poorly and the conveyed item couldn't be anticipated to be great. This course of action should be possible by arranging the arrangement of the assembling office utilizing the From To Chart (FTC) procedure to restrict forward and backward during the assembling cooperation (Backtracking).\",\"PeriodicalId\":17758,\"journal\":{\"name\":\"Jurnal Serambi Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Serambi Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32672/jse.v8i4.6677\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Serambi Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32672/jse.v8i4.6677","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一个行业,无论是在帮助领域还是在组装领域,毫无疑问都会有一些办公室来帮助其创造周期。办公室设计涉及与工作环境相关的区域、格式、平面图、设备和练习。在 PT.Ibrahim Bin Manrapi 位于 Jl. Malik Ibrahim Gresik, 24-26。在设计规划前的格式方面,PT.Ibrahim Bin Manrapi 的集装箱仍有许多地方没有得到充分利用,办公室之间仍有许多距离必须尽可能地扩大。从平台前的流水作业技术来看,材料输送距离为 102 米。Ibrahim Bin Manrapi 在计划中看到了不足之处,因此集料周期进行得很不顺利,输送的物品预计不会很大。在此过程中,应利用 "从到图"(FTC)程序对组装办公室进行安排,以限制组装合作过程中的前进和后退(回溯)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Usulan Perbaikan Tata Letak Fasilitas Pada Area Produksi Menggunakan Metode From to Chart (Studi Kasus: PT. Ibrahim Bin Manrapi)
An industry, both in the help and assembling areas, unquestionably has a few offices to help its creation cycle. Office design connects with the area, format, floor plan, equipment, and exercises related with the work environment. Different sorts of data from research led by finishing direct discernments and assessments made by areas on organizations taking part in the assembling of woven sarong materials at PT. Ibrahim Bin Manrapi which is situated on Jl. Malik Ibrahim Gresik, 24-26. in view of the discoveries of the examination of PT. In terms of format prior to design planning, PT. Ibrahim Bin Manrapi 's container is that there are still many areas that are not utilized to their full potential, and there are still many distances between offices that must be expanded as much as possible. From the technique for making the stream before the platform, there is a material conveyance distance of 102 m. Given the effect of information the board from the issues seen by PT. Ibrahim Bin Manrapi saw a lack in the plan so the gathering cycle went poorly and the conveyed item couldn't be anticipated to be great. This course of action should be possible by arranging the arrangement of the assembling office utilizing the From To Chart (FTC) procedure to restrict forward and backward during the assembling cooperation (Backtracking).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Kajian Alokasi Global Carbon Budget kepada National Carbon Budget Indonesia Efektivitas Penambahan Limbah Kotoran Sapi Dalam Pengolahan Kompos Dari Limbah Daun Jati Menggunakan EM-4 Di Desa Tuksono Kecamatan Sentolo Kabupaten Kulonprogo Analisis Pengaruh Keselamatan dan Kesehatan Kerja Terhadap Risiko Kecelakaan Kerja Menggunakan Metode Failure Mode Effect and Analysis pada 888 Plast Nematoda Gastrointestinal Pada Sapi Berdasarkan Ekologis Lingkungan Perhitungan Beban Emisi Particulate Matter berdasarkan Data CEMS dari PLTU Batu Bara Milik PT PLN (Persero)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1