使用平衡堵塞固井法进行堵塞和废弃的比较研究:NV-01 井案例研究油田 "NS

Krt. Nur Suhascaryo, Ciiqa Ciiqa, Andi Novita Mama Anugrah
{"title":"使用平衡堵塞固井法进行堵塞和废弃的比较研究:NV-01 井案例研究油田 \"NS","authors":"Krt. Nur Suhascaryo, Ciiqa Ciiqa, Andi Novita Mama Anugrah","doi":"10.29017/scog.46.2.1502","DOIUrl":null,"url":null,"abstract":"The NOV-01 well is a directional well that has technical problems (fish), namely the stuck pipe problem and the problem of high land use operational costs. Based on the results of the evaluation of the economic and risk technical aspects, a plug abandonment (PA) was carried out for the NOV-01 well. The purpose of this research is to compare the 3 stages and 5 stages in PA work and their influence on work program planning and budgeting. The research methodology is qualitative and quantitative. The NOV-01 well plug abandonment activity is carried out by preparing a work program plan such as determining the depth interval of the well to be plugged, the volume of cement slurry additives, as well as the rig method which all refer to the existing standards and regulations, namely SNI 13-6910-2002 and NORSOK D-010. The results of a comparative study on PA planning at 3 stages required 279 sacks of cement and 450 sacks of cement at 5 stages with a density of 15.8 ppg. PA on well NOV-01 uses the rig method with a capacity of 450 HP. For 3 stages it takes 9 days and 5 stages for 11 days. Comparison of estimated costs for PA of NOV-01 well, namely 3 stages of IDR 6,062,977,890.31- and 5 stages of IDR 8,374,824,218.62-. Well NOV-01, PA which is suitable is 5 stages because there is an overpressured zone so that the cement plug is isolated.","PeriodicalId":21649,"journal":{"name":"Scientific Contributions Oil and Gas","volume":"80 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparative Study of Plug and Abandonment Using Balanced Plug Cementing Method: Case Study of Well “NV-01” Field “NS”\",\"authors\":\"Krt. Nur Suhascaryo, Ciiqa Ciiqa, Andi Novita Mama Anugrah\",\"doi\":\"10.29017/scog.46.2.1502\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The NOV-01 well is a directional well that has technical problems (fish), namely the stuck pipe problem and the problem of high land use operational costs. Based on the results of the evaluation of the economic and risk technical aspects, a plug abandonment (PA) was carried out for the NOV-01 well. The purpose of this research is to compare the 3 stages and 5 stages in PA work and their influence on work program planning and budgeting. The research methodology is qualitative and quantitative. The NOV-01 well plug abandonment activity is carried out by preparing a work program plan such as determining the depth interval of the well to be plugged, the volume of cement slurry additives, as well as the rig method which all refer to the existing standards and regulations, namely SNI 13-6910-2002 and NORSOK D-010. The results of a comparative study on PA planning at 3 stages required 279 sacks of cement and 450 sacks of cement at 5 stages with a density of 15.8 ppg. PA on well NOV-01 uses the rig method with a capacity of 450 HP. For 3 stages it takes 9 days and 5 stages for 11 days. Comparison of estimated costs for PA of NOV-01 well, namely 3 stages of IDR 6,062,977,890.31- and 5 stages of IDR 8,374,824,218.62-. Well NOV-01, PA which is suitable is 5 stages because there is an overpressured zone so that the cement plug is isolated.\",\"PeriodicalId\":21649,\"journal\":{\"name\":\"Scientific Contributions Oil and Gas\",\"volume\":\"80 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Contributions Oil and Gas\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29017/scog.46.2.1502\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Contributions Oil and Gas","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29017/scog.46.2.1502","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

NOV-01 井是一口定向井,存在技术问题(鱼),即卡管问题和土地使用运营成本高的问题。根据经济和风险技术方面的评估结果,对 NOV-01 井进行了堵塞弃井(PA)。本研究的目的是比较 PA 工作的 3 个阶段和 5 个阶段及其对工作计划规划和预算编制的影响。研究方法是定性和定量相结合。NOV-01 井的堵漏废弃活动是通过编制工作方案计划来进行的,例如确定要堵漏的井深间隔、水泥浆添加剂的用量以及钻机方法,这些都要参照现有的标准和规定,即 SNI 13-6910-2002 和 NORSOK D-010。对 3 个阶段的 PA 规划进行比较研究的结果显示,需要 279 袋水泥,而 5 个阶段需要 450 袋水泥,密度为 15.8 ppg。NOV-01 井的 PA 采用钻机法,功率为 450 HP。3 个阶段需要 9 天,5 个阶段需要 11 天。NOV-01 号井 PA 的估计成本比较,即 3 级 6,062,977,890.31 印尼盾和 5 级 8,374,824,218.62 印尼盾。NOV-01 井适合采用 5 级 PA,因为该井存在超压区,水泥塞被隔离。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Comparative Study of Plug and Abandonment Using Balanced Plug Cementing Method: Case Study of Well “NV-01” Field “NS”
The NOV-01 well is a directional well that has technical problems (fish), namely the stuck pipe problem and the problem of high land use operational costs. Based on the results of the evaluation of the economic and risk technical aspects, a plug abandonment (PA) was carried out for the NOV-01 well. The purpose of this research is to compare the 3 stages and 5 stages in PA work and their influence on work program planning and budgeting. The research methodology is qualitative and quantitative. The NOV-01 well plug abandonment activity is carried out by preparing a work program plan such as determining the depth interval of the well to be plugged, the volume of cement slurry additives, as well as the rig method which all refer to the existing standards and regulations, namely SNI 13-6910-2002 and NORSOK D-010. The results of a comparative study on PA planning at 3 stages required 279 sacks of cement and 450 sacks of cement at 5 stages with a density of 15.8 ppg. PA on well NOV-01 uses the rig method with a capacity of 450 HP. For 3 stages it takes 9 days and 5 stages for 11 days. Comparison of estimated costs for PA of NOV-01 well, namely 3 stages of IDR 6,062,977,890.31- and 5 stages of IDR 8,374,824,218.62-. Well NOV-01, PA which is suitable is 5 stages because there is an overpressured zone so that the cement plug is isolated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.50
自引率
0.00%
发文量
0
期刊最新文献
SYNTHESIS AND EVALUATION OF SULPHONYL BORATE ESTER AS GREASE ADDITIVE Integrated Approach to Investigate the Potential of Asphalt/Tar Sand on Buton Island, Indonesia Comparative Study of Plug and Abandonment Using Balanced Plug Cementing Method: Case Study of Well “NV-01” Field “NS” The Comparation of Water Saturation Approaches to Reveal a Low Resistivity Reservoir Potential Case in Gumai Formation, South Sumatra Basin The 3D Seismic Survey Design of South Walio Offshore, Indonesia: Optimizing the 3D Survey Design Parameters
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1