{"title":"使用平衡堵塞固井法进行堵塞和废弃的比较研究:NV-01 井案例研究油田 \"NS","authors":"Krt. Nur Suhascaryo, Ciiqa Ciiqa, Andi Novita Mama Anugrah","doi":"10.29017/scog.46.2.1502","DOIUrl":null,"url":null,"abstract":"The NOV-01 well is a directional well that has technical problems (fish), namely the stuck pipe problem and the problem of high land use operational costs. Based on the results of the evaluation of the economic and risk technical aspects, a plug abandonment (PA) was carried out for the NOV-01 well. The purpose of this research is to compare the 3 stages and 5 stages in PA work and their influence on work program planning and budgeting. The research methodology is qualitative and quantitative. The NOV-01 well plug abandonment activity is carried out by preparing a work program plan such as determining the depth interval of the well to be plugged, the volume of cement slurry additives, as well as the rig method which all refer to the existing standards and regulations, namely SNI 13-6910-2002 and NORSOK D-010. The results of a comparative study on PA planning at 3 stages required 279 sacks of cement and 450 sacks of cement at 5 stages with a density of 15.8 ppg. PA on well NOV-01 uses the rig method with a capacity of 450 HP. For 3 stages it takes 9 days and 5 stages for 11 days. Comparison of estimated costs for PA of NOV-01 well, namely 3 stages of IDR 6,062,977,890.31- and 5 stages of IDR 8,374,824,218.62-. Well NOV-01, PA which is suitable is 5 stages because there is an overpressured zone so that the cement plug is isolated.","PeriodicalId":21649,"journal":{"name":"Scientific Contributions Oil and Gas","volume":"80 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparative Study of Plug and Abandonment Using Balanced Plug Cementing Method: Case Study of Well “NV-01” Field “NS”\",\"authors\":\"Krt. Nur Suhascaryo, Ciiqa Ciiqa, Andi Novita Mama Anugrah\",\"doi\":\"10.29017/scog.46.2.1502\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The NOV-01 well is a directional well that has technical problems (fish), namely the stuck pipe problem and the problem of high land use operational costs. Based on the results of the evaluation of the economic and risk technical aspects, a plug abandonment (PA) was carried out for the NOV-01 well. The purpose of this research is to compare the 3 stages and 5 stages in PA work and their influence on work program planning and budgeting. The research methodology is qualitative and quantitative. The NOV-01 well plug abandonment activity is carried out by preparing a work program plan such as determining the depth interval of the well to be plugged, the volume of cement slurry additives, as well as the rig method which all refer to the existing standards and regulations, namely SNI 13-6910-2002 and NORSOK D-010. The results of a comparative study on PA planning at 3 stages required 279 sacks of cement and 450 sacks of cement at 5 stages with a density of 15.8 ppg. PA on well NOV-01 uses the rig method with a capacity of 450 HP. For 3 stages it takes 9 days and 5 stages for 11 days. Comparison of estimated costs for PA of NOV-01 well, namely 3 stages of IDR 6,062,977,890.31- and 5 stages of IDR 8,374,824,218.62-. Well NOV-01, PA which is suitable is 5 stages because there is an overpressured zone so that the cement plug is isolated.\",\"PeriodicalId\":21649,\"journal\":{\"name\":\"Scientific Contributions Oil and Gas\",\"volume\":\"80 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Contributions Oil and Gas\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29017/scog.46.2.1502\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Contributions Oil and Gas","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29017/scog.46.2.1502","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Comparative Study of Plug and Abandonment Using Balanced Plug Cementing Method: Case Study of Well “NV-01” Field “NS”
The NOV-01 well is a directional well that has technical problems (fish), namely the stuck pipe problem and the problem of high land use operational costs. Based on the results of the evaluation of the economic and risk technical aspects, a plug abandonment (PA) was carried out for the NOV-01 well. The purpose of this research is to compare the 3 stages and 5 stages in PA work and their influence on work program planning and budgeting. The research methodology is qualitative and quantitative. The NOV-01 well plug abandonment activity is carried out by preparing a work program plan such as determining the depth interval of the well to be plugged, the volume of cement slurry additives, as well as the rig method which all refer to the existing standards and regulations, namely SNI 13-6910-2002 and NORSOK D-010. The results of a comparative study on PA planning at 3 stages required 279 sacks of cement and 450 sacks of cement at 5 stages with a density of 15.8 ppg. PA on well NOV-01 uses the rig method with a capacity of 450 HP. For 3 stages it takes 9 days and 5 stages for 11 days. Comparison of estimated costs for PA of NOV-01 well, namely 3 stages of IDR 6,062,977,890.31- and 5 stages of IDR 8,374,824,218.62-. Well NOV-01, PA which is suitable is 5 stages because there is an overpressured zone so that the cement plug is isolated.