基于电容-电阻模型和非线性生产力指数的注水工艺效率估算

IF 1.7 0 ENGINEERING, PETROLEUM SOCAR Proceedings Pub Date : 2023-06-30 DOI:10.5510/ogp2023si100820
A. A. Abbasov, E. M. Abbasov, Sh. Z. Ismayilov
{"title":"基于电容-电阻模型和非线性生产力指数的注水工艺效率估算","authors":"A. A. Abbasov, E. M. Abbasov, Sh. Z. Ismayilov","doi":"10.5510/ogp2023si100820","DOIUrl":null,"url":null,"abstract":"A modified Capacitance-Resistance Model (CRM), with Forchheimer two terms law non-linear Productivity Indexes (PI), has been suggested to evaluate efficiency of waterflooding in heterogeneous reservoirs. The model represents the intra-formation processes in heterogeneous reservoirs more accurately, thus it can be used for production forecasting and waterflood monitoring. CRM model is based on continuity equation between production and injection, and has several additional advantages. The technique does not require sophisticated geological and hydrodynamics numerical simulation modeling, which would require expensive computing time and based on actual hydrodynamic data. The model adequately describes depletion process and can be used for production forecasting and waterflooding mechanism. Capacitance-resistance model with non-linear productivity index has been tested against numerical model as well as actual production data. Additionally, non-linear productivity index based CRM model was compared against the CRM model with linear productivity index function. Keywords: production, modeling, waterflooding efficiency, capacitance-resistance model, non-linear productivity index, Forchheimer two terms law.","PeriodicalId":43516,"journal":{"name":"SOCAR Proceedings","volume":null,"pages":null},"PeriodicalIF":1.7000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of the waterflooding process efficiency based on a capacitive-resistive model with a nonlinear productivity index\",\"authors\":\"A. A. Abbasov, E. M. Abbasov, Sh. Z. Ismayilov\",\"doi\":\"10.5510/ogp2023si100820\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A modified Capacitance-Resistance Model (CRM), with Forchheimer two terms law non-linear Productivity Indexes (PI), has been suggested to evaluate efficiency of waterflooding in heterogeneous reservoirs. The model represents the intra-formation processes in heterogeneous reservoirs more accurately, thus it can be used for production forecasting and waterflood monitoring. CRM model is based on continuity equation between production and injection, and has several additional advantages. The technique does not require sophisticated geological and hydrodynamics numerical simulation modeling, which would require expensive computing time and based on actual hydrodynamic data. The model adequately describes depletion process and can be used for production forecasting and waterflooding mechanism. Capacitance-resistance model with non-linear productivity index has been tested against numerical model as well as actual production data. Additionally, non-linear productivity index based CRM model was compared against the CRM model with linear productivity index function. Keywords: production, modeling, waterflooding efficiency, capacitance-resistance model, non-linear productivity index, Forchheimer two terms law.\",\"PeriodicalId\":43516,\"journal\":{\"name\":\"SOCAR Proceedings\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.7000,\"publicationDate\":\"2023-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SOCAR Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5510/ogp2023si100820\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"0\",\"JCRName\":\"ENGINEERING, PETROLEUM\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SOCAR Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5510/ogp2023si100820","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 0

摘要

有人提出了一种改进的电容-电阻模型(CRM),该模型具有福赫海默(Forchheimer)二项定律非线性生产力指数(PI),用于评估异质油藏的注水效率。该模型更准确地反映了异质油藏的内部形成过程,因此可用于产量预测和注水监测。CRM 模型基于生产与注水之间的连续性方程,还具有其他一些优点。该技术不需要复杂的地质和流体力学数值模拟模型,而这些模型需要昂贵的计算时间和实际的流体力学数据。该模型充分描述了耗竭过程,可用于产量预测和注水机制。带有非线性生产力指数的电容-电阻模型已根据数值模型和实际生产数据进行了测试。此外,还将基于非线性生产率指数的 CRM 模型与基于线性生产率指数的 CRM 模型进行了比较。关键词:生产、建模、注水效率、电容-电阻模型、非线性生产率指数、福希海默二项法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Estimation of the waterflooding process efficiency based on a capacitive-resistive model with a nonlinear productivity index
A modified Capacitance-Resistance Model (CRM), with Forchheimer two terms law non-linear Productivity Indexes (PI), has been suggested to evaluate efficiency of waterflooding in heterogeneous reservoirs. The model represents the intra-formation processes in heterogeneous reservoirs more accurately, thus it can be used for production forecasting and waterflood monitoring. CRM model is based on continuity equation between production and injection, and has several additional advantages. The technique does not require sophisticated geological and hydrodynamics numerical simulation modeling, which would require expensive computing time and based on actual hydrodynamic data. The model adequately describes depletion process and can be used for production forecasting and waterflooding mechanism. Capacitance-resistance model with non-linear productivity index has been tested against numerical model as well as actual production data. Additionally, non-linear productivity index based CRM model was compared against the CRM model with linear productivity index function. Keywords: production, modeling, waterflooding efficiency, capacitance-resistance model, non-linear productivity index, Forchheimer two terms law.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
SOCAR Proceedings
SOCAR Proceedings ENGINEERING, PETROLEUM-
CiteScore
3.00
自引率
82.40%
发文量
0
期刊最新文献
Estimation of the waterflooding process efficiency based on a capacitive-resistive model with a nonlinear productivity index Determination of the conditions of sedimentation of the Jurassic deposits of the Karaton field based on a comparison of electrofacies and sedimentological description of the core Innovative mechanisms for improving oil production efficiency Novel water shut off method based on temporary plugging agent and gel composition Discrete rough surface intensifiers in the thermal decomposition plants: current status and future potential
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1