量化成本超支风险和确定主要原因的新型概率方法

4区 工程技术 Q1 Mathematics Mathematical Problems in Engineering Pub Date : 2024-01-19 DOI:10.1155/2024/8893201
Tianyu Liu, Shen Zhang, Xingyu Wang
{"title":"量化成本超支风险和确定主要原因的新型概率方法","authors":"Tianyu Liu, Shen Zhang, Xingyu Wang","doi":"10.1155/2024/8893201","DOIUrl":null,"url":null,"abstract":"Cost management is a crucial component of construction project management, which assumes an increasingly critical role in modern large-scale projects. Ideally, cost management is achieved through a comparison between the current cost and the predetermined cost schedule. However, in real-world projects, it is often difficult to consistently obtain accurate costs for each cost item throughout the project life cycle and to predict the probability of various risk occurrences. To address this challenge, we propose a novel building information modeling- (BIM-) based algorithm to quantify the risk of cost overruns and cost deviation; and identify the primary causes without a detailed cost breakdown. The role of BIM in our approach is to automatically extract precise quantitative information that we can use to calculate the probability density function of the current cost and the expected total cost and eventually combine reliability analysis to provide the risk probability. The numerical experiment demonstrates that this algorithm can estimate the probability of cost overruns and cost deviation, and identify the primary cause of deviation. Additionally, the sensitivity requirements for cost management can be adjusted by adjusting the parameters, indicating its potential to meet multiple requirements in the different projects. The proposed algorithm provides a method for detecting the current risk of cost overruns and cost deviation, as well as identifying the primary cause of deviation, which is of potential value in the practical applications.","PeriodicalId":18319,"journal":{"name":"Mathematical Problems in Engineering","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Novel Probabilistic Approach for Quantification of Cost-Overruns Risk and Determination of Primary Causes\",\"authors\":\"Tianyu Liu, Shen Zhang, Xingyu Wang\",\"doi\":\"10.1155/2024/8893201\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cost management is a crucial component of construction project management, which assumes an increasingly critical role in modern large-scale projects. Ideally, cost management is achieved through a comparison between the current cost and the predetermined cost schedule. However, in real-world projects, it is often difficult to consistently obtain accurate costs for each cost item throughout the project life cycle and to predict the probability of various risk occurrences. To address this challenge, we propose a novel building information modeling- (BIM-) based algorithm to quantify the risk of cost overruns and cost deviation; and identify the primary causes without a detailed cost breakdown. The role of BIM in our approach is to automatically extract precise quantitative information that we can use to calculate the probability density function of the current cost and the expected total cost and eventually combine reliability analysis to provide the risk probability. The numerical experiment demonstrates that this algorithm can estimate the probability of cost overruns and cost deviation, and identify the primary cause of deviation. Additionally, the sensitivity requirements for cost management can be adjusted by adjusting the parameters, indicating its potential to meet multiple requirements in the different projects. The proposed algorithm provides a method for detecting the current risk of cost overruns and cost deviation, as well as identifying the primary cause of deviation, which is of potential value in the practical applications.\",\"PeriodicalId\":18319,\"journal\":{\"name\":\"Mathematical Problems in Engineering\",\"volume\":\"34 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mathematical Problems in Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1155/2024/8893201\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Mathematics\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mathematical Problems in Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1155/2024/8893201","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 0

摘要

成本管理是施工项目管理的重要组成部分,在现代大型项目中发挥着越来越关键的作用。理想情况下,成本管理是通过比较当前成本和预定成本进度表来实现的。然而,在现实世界的项目中,通常很难在整个项目生命周期内持续获得每个成本项目的准确成本,也很难预测各种风险发生的概率。为了应对这一挑战,我们提出了一种基于建筑信息模型(BIM)的新型算法,用于量化成本超支和成本偏差的风险,并在没有详细成本明细的情况下找出主要原因。在我们的方法中,建筑信息模型的作用是自动提取精确的定量信息,用于计算当前成本和预期总成本的概率密度函数,并最终结合可靠性分析提供风险概率。数值实验证明,该算法可以估算出成本超支和成本偏差的概率,并找出偏差的主要原因。此外,成本管理的灵敏度要求可通过调整参数进行调整,这表明该算法具有满足不同项目多种要求的潜力。所提出的算法提供了一种检测当前成本超支和成本偏差风险以及识别偏差主要原因的方法,在实际应用中具有潜在价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Novel Probabilistic Approach for Quantification of Cost-Overruns Risk and Determination of Primary Causes
Cost management is a crucial component of construction project management, which assumes an increasingly critical role in modern large-scale projects. Ideally, cost management is achieved through a comparison between the current cost and the predetermined cost schedule. However, in real-world projects, it is often difficult to consistently obtain accurate costs for each cost item throughout the project life cycle and to predict the probability of various risk occurrences. To address this challenge, we propose a novel building information modeling- (BIM-) based algorithm to quantify the risk of cost overruns and cost deviation; and identify the primary causes without a detailed cost breakdown. The role of BIM in our approach is to automatically extract precise quantitative information that we can use to calculate the probability density function of the current cost and the expected total cost and eventually combine reliability analysis to provide the risk probability. The numerical experiment demonstrates that this algorithm can estimate the probability of cost overruns and cost deviation, and identify the primary cause of deviation. Additionally, the sensitivity requirements for cost management can be adjusted by adjusting the parameters, indicating its potential to meet multiple requirements in the different projects. The proposed algorithm provides a method for detecting the current risk of cost overruns and cost deviation, as well as identifying the primary cause of deviation, which is of potential value in the practical applications.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Mathematical Problems in Engineering
Mathematical Problems in Engineering 工程技术-工程:综合
CiteScore
4.00
自引率
0.00%
发文量
2853
审稿时长
4.2 months
期刊介绍: Mathematical Problems in Engineering is a broad-based journal which publishes articles of interest in all engineering disciplines. Mathematical Problems in Engineering publishes results of rigorous engineering research carried out using mathematical tools. Contributions containing formulations or results related to applications are also encouraged. The primary aim of Mathematical Problems in Engineering is rapid publication and dissemination of important mathematical work which has relevance to engineering. All areas of engineering are within the scope of the journal. In particular, aerospace engineering, bioengineering, chemical engineering, computer engineering, electrical engineering, industrial engineering and manufacturing systems, and mechanical engineering are of interest. Mathematical work of interest includes, but is not limited to, ordinary and partial differential equations, stochastic processes, calculus of variations, and nonlinear analysis.
期刊最新文献
Flower Recognition Algorithm Based on Nonlinear Regression of Pixel Value On Spectral Radius and Energy of a Graph with Self-Loops Influence of Structural Parameters of Gearbox Seal System of Electrical Multiple Units on Seal Performance Implementation of Bioelectrical Impedance Measuring Instrument Based on Embedded System Analyzing Lower Limb Dynamics in Human Gait Using Average Value-Based Technique
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1