{"title":"为未铺设路面的重型运输道路开发基于 RBI-overden 的稳定材料","authors":"Soumya Ranjan Mallick, Abhiram Kumar Verma","doi":"10.1007/s42461-024-00959-7","DOIUrl":null,"url":null,"abstract":"<p>In any mining operation, huge quantities of overburden materials such as soil, sandstone and shale are extracted as waste. Generally, waste such as soil and sandstone is used in mines for road construction or haul roads. In many such mines, it is challenging to design haul road pavement to match the dumper capacity. This paper investigates overburden soil to find its utility as a pavement material. It is found that overburden soil is unsuitable pavement material without stabilization; hence, nine composite materials are developed using overburden soil and RBI. Physical, mechanical and microstructural properties of unstabilized and stabilized soil are determined. Statistical analysis is carried out to assess the effect of soil type, RBI and curing period of strength characteristics of unstabilized and stabilized soil. ANOVA tests assess the influence of RBI percentage on soil geotechnical properties, and regression relations are developed. Two-way ANOVA shows the effect of RBI and soil type on soil geotechnical properties, whereas one-way ANOVA shows that the influence of soil type is more than the RBI. The regression relation is developed for CBR, UCS, Poisson’s ratio and modulus of elasticity with a good correlation coefficient. The performance of RBI is more with the finer material and reduces with an increase in the size of soil grains. The performance of the developed composite is better than the earlier developed composite based on overburden with fly ash, lime kiln dust, lime or clinker.</p>","PeriodicalId":18588,"journal":{"name":"Mining, Metallurgy & Exploration","volume":"20 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2024-03-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of RBI-Overburden–Based Stabilized Material for Unpaved Heavy-Duty Haul Roads\",\"authors\":\"Soumya Ranjan Mallick, Abhiram Kumar Verma\",\"doi\":\"10.1007/s42461-024-00959-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>In any mining operation, huge quantities of overburden materials such as soil, sandstone and shale are extracted as waste. Generally, waste such as soil and sandstone is used in mines for road construction or haul roads. In many such mines, it is challenging to design haul road pavement to match the dumper capacity. This paper investigates overburden soil to find its utility as a pavement material. It is found that overburden soil is unsuitable pavement material without stabilization; hence, nine composite materials are developed using overburden soil and RBI. Physical, mechanical and microstructural properties of unstabilized and stabilized soil are determined. Statistical analysis is carried out to assess the effect of soil type, RBI and curing period of strength characteristics of unstabilized and stabilized soil. ANOVA tests assess the influence of RBI percentage on soil geotechnical properties, and regression relations are developed. Two-way ANOVA shows the effect of RBI and soil type on soil geotechnical properties, whereas one-way ANOVA shows that the influence of soil type is more than the RBI. The regression relation is developed for CBR, UCS, Poisson’s ratio and modulus of elasticity with a good correlation coefficient. The performance of RBI is more with the finer material and reduces with an increase in the size of soil grains. The performance of the developed composite is better than the earlier developed composite based on overburden with fly ash, lime kiln dust, lime or clinker.</p>\",\"PeriodicalId\":18588,\"journal\":{\"name\":\"Mining, Metallurgy & Exploration\",\"volume\":\"20 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2024-03-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining, Metallurgy & Exploration\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1007/s42461-024-00959-7\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"METALLURGY & METALLURGICAL ENGINEERING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining, Metallurgy & Exploration","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1007/s42461-024-00959-7","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"METALLURGY & METALLURGICAL ENGINEERING","Score":null,"Total":0}
引用次数: 0

摘要

在任何采矿作业中,都会提取大量的覆盖层材料,如土壤、砂岩和页岩等废物。一般来说,土壤和砂岩等废料被矿山用于道路建设或运输道路。在许多此类矿山,设计与翻斗车容量相匹配的运输道路路面是一项挑战。本文对堆积土进行了研究,以发现其作为路面材料的实用性。研究发现,如果不进行稳定化处理,堆积土不适合用作路面材料;因此,本文利用堆积土和 RBI 开发了九种复合材料。确定了未稳定土壤和稳定土壤的物理、机械和微观结构特性。通过统计分析来评估土壤类型、RBI 和固化期对未稳定土壤和稳定土壤强度特性的影响。方差分析测试评估了 RBI 百分比对土壤岩土特性的影响,并建立了回归关系。双向方差分析显示了 RBI 和土壤类型对土壤岩土特性的影响,而单向方差分析则显示土壤类型的影响大于 RBI 的影响。对 CBR、UCS、泊松比和弹性模量建立的回归关系具有良好的相关系数。材料越细,RBI 的性能越高,而土壤颗粒越大,RBI 的性能越低。所开发的复合材料的性能优于早期开发的基于粉煤灰、石灰窑粉尘、石灰或熟料的覆土复合材料。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Development of RBI-Overburden–Based Stabilized Material for Unpaved Heavy-Duty Haul Roads

In any mining operation, huge quantities of overburden materials such as soil, sandstone and shale are extracted as waste. Generally, waste such as soil and sandstone is used in mines for road construction or haul roads. In many such mines, it is challenging to design haul road pavement to match the dumper capacity. This paper investigates overburden soil to find its utility as a pavement material. It is found that overburden soil is unsuitable pavement material without stabilization; hence, nine composite materials are developed using overburden soil and RBI. Physical, mechanical and microstructural properties of unstabilized and stabilized soil are determined. Statistical analysis is carried out to assess the effect of soil type, RBI and curing period of strength characteristics of unstabilized and stabilized soil. ANOVA tests assess the influence of RBI percentage on soil geotechnical properties, and regression relations are developed. Two-way ANOVA shows the effect of RBI and soil type on soil geotechnical properties, whereas one-way ANOVA shows that the influence of soil type is more than the RBI. The regression relation is developed for CBR, UCS, Poisson’s ratio and modulus of elasticity with a good correlation coefficient. The performance of RBI is more with the finer material and reduces with an increase in the size of soil grains. The performance of the developed composite is better than the earlier developed composite based on overburden with fly ash, lime kiln dust, lime or clinker.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Mining, Metallurgy & Exploration
Mining, Metallurgy & Exploration Materials Science-Materials Chemistry
CiteScore
3.50
自引率
10.50%
发文量
177
期刊介绍: The aim of this international peer-reviewed journal of the Society for Mining, Metallurgy & Exploration (SME) is to provide a broad-based forum for the exchange of real-world and theoretical knowledge from academia, government and industry that is pertinent to mining, mineral/metallurgical processing, exploration and other fields served by the Society. The journal publishes high-quality original research publications, in-depth special review articles, reviews of state-of-the-art and innovative technologies and industry methodologies, communications of work of topical and emerging interest, and other works that enhance understanding on both the fundamental and practical levels.
期刊最新文献
Prediction of Backbreak in Surface Production Blasting Using 3-Dimensional Finite Element Modeling and 3-Dimensional Nearfield Vibration Modeling Improving Feldspar Flotation Using CTAB As Amine Collector (Part Two) Research on Vibrating Screen Screening Technology and Method Based on DEM: a Review Slope Stability Analysis of Opencast Mine Dump using the Limit Equilibrium Method—a Case Study Spatial Clustering of Primary Geochemical Halos Using Unsupervised Machine Learning in Sari Gunay Gold Deposit, Iran
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1