卡普阿斯胡鲁县普图西鲍市 Tugu Pancasila 环形路的性能分析

Jurnal Teknik Sipil, Hifzhan Hanif Darmawan, Elsa Tri Mukti, S. Kadarini
{"title":"卡普阿斯胡鲁县普图西鲍市 Tugu Pancasila 环形路的性能分析","authors":"Jurnal Teknik Sipil, Hifzhan Hanif Darmawan, Elsa Tri Mukti, S. Kadarini","doi":"10.26418/jts.v24i1.75946","DOIUrl":null,"url":null,"abstract":"Tugu Pancasila Roundabout in Putussibau City is a 5-arm roundabout that organizes traffic in 5 directions of movement. Poor traffic management at this roundabout, such as the lack of roundabout signs and no separation island or median on roads other than the main road, makes motorists who should pass through the roundabout instead choose not to cross the roundabout and go against the flow because they want to reach their destination faster. In addition, due to the increasing population and the volume of vehicles traveling, it is anticipated that in the future, the Tugu Pancasila roundabout will have increasingly heavy traffic flows. The performance analysis of Tugu Pancasila Roundabout was calculated using MKJI 1997 and VISSIM software. The performance analysis of Tugu Pancasila Roundabout was carried out by taking roundabout geometric data, manually taking side obstacle data, and traffic volume data for three days using survey aids in the form of CCTV starting at 06.00 - 18.00 WIB. Analysis of the existing conditions in 2023, the highest degree of saturation is 0.62 with the level of service B; in the 2028 projection conditions, the highest degree of saturation is 0.73 with the level of service B; and in the 2033 projection conditions, the highest degree of saturation is 0.86 with the level of service E. With a poor level of service, the volume of vehicles and the roundabout capacity could be more balanced, so improvements are needed for the Tugu Pancasila Roundabout in Putussibau City. The improvement solution is to re-plan the roundabout following the Roundabout Planning Guidelines for Intersections (2004). For the results of the MKJI 1997 analysis of the roundabout re-planning solution, the 2028 projection obtained the highest degree of saturation of 0.54 with level of service B, and in the 2033 projection obtained the highest degree of saturation of 0.63 with level of service B. for the results of the VISSIM software simulation, the roundabout re-planning solution for the 2028 projection obtained a delay of 13.14 seconds with level of service B, and the 2033 projection obtained a delay of 15.60 seconds with level of service C.","PeriodicalId":52838,"journal":{"name":"Jurnal Teknik Sipil","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-03-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERFORMANCE ANALYSIS OF TUGU PANCASILA ROUNDABOUT IN PUTUSSIBAU CITY KAPUAS HULU DISTRICT\",\"authors\":\"Jurnal Teknik Sipil, Hifzhan Hanif Darmawan, Elsa Tri Mukti, S. Kadarini\",\"doi\":\"10.26418/jts.v24i1.75946\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Tugu Pancasila Roundabout in Putussibau City is a 5-arm roundabout that organizes traffic in 5 directions of movement. Poor traffic management at this roundabout, such as the lack of roundabout signs and no separation island or median on roads other than the main road, makes motorists who should pass through the roundabout instead choose not to cross the roundabout and go against the flow because they want to reach their destination faster. In addition, due to the increasing population and the volume of vehicles traveling, it is anticipated that in the future, the Tugu Pancasila roundabout will have increasingly heavy traffic flows. The performance analysis of Tugu Pancasila Roundabout was calculated using MKJI 1997 and VISSIM software. The performance analysis of Tugu Pancasila Roundabout was carried out by taking roundabout geometric data, manually taking side obstacle data, and traffic volume data for three days using survey aids in the form of CCTV starting at 06.00 - 18.00 WIB. Analysis of the existing conditions in 2023, the highest degree of saturation is 0.62 with the level of service B; in the 2028 projection conditions, the highest degree of saturation is 0.73 with the level of service B; and in the 2033 projection conditions, the highest degree of saturation is 0.86 with the level of service E. With a poor level of service, the volume of vehicles and the roundabout capacity could be more balanced, so improvements are needed for the Tugu Pancasila Roundabout in Putussibau City. The improvement solution is to re-plan the roundabout following the Roundabout Planning Guidelines for Intersections (2004). For the results of the MKJI 1997 analysis of the roundabout re-planning solution, the 2028 projection obtained the highest degree of saturation of 0.54 with level of service B, and in the 2033 projection obtained the highest degree of saturation of 0.63 with level of service B. for the results of the VISSIM software simulation, the roundabout re-planning solution for the 2028 projection obtained a delay of 13.14 seconds with level of service B, and the 2033 projection obtained a delay of 15.60 seconds with level of service C.\",\"PeriodicalId\":52838,\"journal\":{\"name\":\"Jurnal Teknik Sipil\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26418/jts.v24i1.75946\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/jts.v24i1.75946","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

位于普图西保市的 Tugu Pancasila 环岛是一个 5 臂环岛,将交通组织成 5 个行进方向。该环岛的交通管理不善,如缺少环岛标志,主干道以外的道路没有分隔岛或分隔带等,使得本应通过环岛的驾驶者因想更快到达目的地而选择不通过环岛,逆向行驶。此外,由于人口和车辆行驶量的增加,预计未来 Tugu Pancasila 环岛的交通流量将越来越大。Tugu Pancasila 环岛的性能分析使用 MKJI 1997 和 VISSIM 软件进行计算。Tugu Pancasila 环岛的性能分析是通过采集环岛几何数据、手动采集侧面障碍物数据以及使用闭路电视调查辅助工具(从 6:00 - 18:00 WIB 开始)采集三天的交通流量数据进行的。分析 2023 年的现有条件,最高饱和度为 0.62,服务水平为 B;在 2028 年的预测条件下,最高饱和度为 0.73,服务水平为 B;在 2033 年的预测条件下,最高饱和度为 0.86,服务水平为 E。改进方案是按照《交叉口环岛规划指南》(2004 年)重新规划环岛。根据 1997 年 MKJI 对环岛重新规划方案的分析结果,2028 年预测的饱和度最高,为 0.54,服务等级为 B 级;2033 年预测的饱和度最高,为 0.63,服务等级为 B 级;根据 VISSIM 软件模拟结果,2028 年预测的环岛重新规划方案的延迟时间为 13.14 秒,服务等级为 B 级;2033 年预测的延迟时间为 15.60 秒,服务等级为 C 级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERFORMANCE ANALYSIS OF TUGU PANCASILA ROUNDABOUT IN PUTUSSIBAU CITY KAPUAS HULU DISTRICT
Tugu Pancasila Roundabout in Putussibau City is a 5-arm roundabout that organizes traffic in 5 directions of movement. Poor traffic management at this roundabout, such as the lack of roundabout signs and no separation island or median on roads other than the main road, makes motorists who should pass through the roundabout instead choose not to cross the roundabout and go against the flow because they want to reach their destination faster. In addition, due to the increasing population and the volume of vehicles traveling, it is anticipated that in the future, the Tugu Pancasila roundabout will have increasingly heavy traffic flows. The performance analysis of Tugu Pancasila Roundabout was calculated using MKJI 1997 and VISSIM software. The performance analysis of Tugu Pancasila Roundabout was carried out by taking roundabout geometric data, manually taking side obstacle data, and traffic volume data for three days using survey aids in the form of CCTV starting at 06.00 - 18.00 WIB. Analysis of the existing conditions in 2023, the highest degree of saturation is 0.62 with the level of service B; in the 2028 projection conditions, the highest degree of saturation is 0.73 with the level of service B; and in the 2033 projection conditions, the highest degree of saturation is 0.86 with the level of service E. With a poor level of service, the volume of vehicles and the roundabout capacity could be more balanced, so improvements are needed for the Tugu Pancasila Roundabout in Putussibau City. The improvement solution is to re-plan the roundabout following the Roundabout Planning Guidelines for Intersections (2004). For the results of the MKJI 1997 analysis of the roundabout re-planning solution, the 2028 projection obtained the highest degree of saturation of 0.54 with level of service B, and in the 2033 projection obtained the highest degree of saturation of 0.63 with level of service B. for the results of the VISSIM software simulation, the roundabout re-planning solution for the 2028 projection obtained a delay of 13.14 seconds with level of service B, and the 2033 projection obtained a delay of 15.60 seconds with level of service C.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
PLANNING FOR THE DEVELOPMENT OF A DRINKING WATER DISTRIBUTION SYSTEM NETWORK IN SUNGAI PINYUH DETERMINATION OF DISCHARGE COEFFICIENT THROUGH LABORATORY TESTING USING BROAD-CRESTED WEIR DETERMINATION OF REPRESENTATIVE MOCK MODEL PARAMETERS FOR MONTHLY DISCHARGE CURVE DEVELOPMENT IN THE UPPER KAPUAS RIVER BASIN FLOW HYDROGRAPH GENERATION FOR MELAWI SUB-WATERSHED USING THE SNYDER SYNTHETIC UNIT HYDROGRAPH MODEL BRACKISH WATER DESALINATION IN SUNGAI ITIK AREA USING REVERSE OSMOSIS (RO) METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1