{"title":"尼日利亚海港-腹地物流效率制约因素分析","authors":"O. O. Adepoju","doi":"10.3311/pptr.23287","DOIUrl":null,"url":null,"abstract":"Having realized that most Nigerian seaports are congested and the problem of moving goods have been difficult, the Federal Government through Bureau of Public Enterprises and Nigerian Shippers’ Council were mandated to identify Inland Container Depots (ICDs) and Container Freight Stations (CFSs) across the country with connectivity to rail transport. Since 2004 to date, these have mostly not been functioning. This paper therefore examined the constraints and possible factors responsible. The Nigerian Ports Authority, Road Haulage Association, Terminal Operators, selected Shipping companies were used as respondents. 34.1% (253) from the population of 743 respondents were sampled with the use of Cochran formula and stratified random sampling technique. Shaphiro Test and multiple regression were used to analyze the constraints against the use of ICDs and CFSs. Principal Component Analysis was used to extract the major factors hindering port-hinterland logistics in Nigeria. It was observed that 50% of general logistics constraints emanated from lack of efficient rail system, enforcement and finance combined. Extracted causative factors against port-hinterland movements of goods are: inadequate terminal capacity, parking and inadequacy of cargo handling facilities. The research concluded that both general constraints and causative factors are to be looked into with stringent policy enforcement.","PeriodicalId":39536,"journal":{"name":"Periodica Polytechnica Transportation Engineering","volume":"26 19","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Constraints against Efficiency of Seaport-hinterland Logistics in Nigeria\",\"authors\":\"O. O. Adepoju\",\"doi\":\"10.3311/pptr.23287\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Having realized that most Nigerian seaports are congested and the problem of moving goods have been difficult, the Federal Government through Bureau of Public Enterprises and Nigerian Shippers’ Council were mandated to identify Inland Container Depots (ICDs) and Container Freight Stations (CFSs) across the country with connectivity to rail transport. Since 2004 to date, these have mostly not been functioning. This paper therefore examined the constraints and possible factors responsible. The Nigerian Ports Authority, Road Haulage Association, Terminal Operators, selected Shipping companies were used as respondents. 34.1% (253) from the population of 743 respondents were sampled with the use of Cochran formula and stratified random sampling technique. Shaphiro Test and multiple regression were used to analyze the constraints against the use of ICDs and CFSs. Principal Component Analysis was used to extract the major factors hindering port-hinterland logistics in Nigeria. It was observed that 50% of general logistics constraints emanated from lack of efficient rail system, enforcement and finance combined. Extracted causative factors against port-hinterland movements of goods are: inadequate terminal capacity, parking and inadequacy of cargo handling facilities. The research concluded that both general constraints and causative factors are to be looked into with stringent policy enforcement.\",\"PeriodicalId\":39536,\"journal\":{\"name\":\"Periodica Polytechnica Transportation Engineering\",\"volume\":\"26 19\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Periodica Polytechnica Transportation Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/pptr.23287\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Periodica Polytechnica Transportation Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/pptr.23287","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

联邦政府意识到尼日利亚大多数海港拥挤不堪,货物运输困难重重,因此通过公共企业局和尼日利亚托运人理事会授权在全国范围内确定与铁路运输连接的内陆集装箱中转站(ICD)和集装箱货运站(CFS)。自 2004 年至今,这些设施大多未能正常运行。因此,本文对制约因素和可能的原因进行了研究。调查对象包括尼日利亚港务局、公路运输协会、码头运营商和部分船运公司。采用科克兰公式和分层随机抽样技术,从 743 名受访者中抽取了 34.1%(253 人)的样本。采用 Shaphiro 检验和多元回归分析了使用综合商品分类和集装箱货运站的制约因素。主成分分析法用于提取阻碍尼日利亚港口-腹地物流的主要因素。结果表明,50%的一般物流制约因素来自于缺乏高效的铁路系统、执法和资金。提取出的阻碍港口-腹地货物运输的成因包括:码头能力不足、停车场和货物装卸设施不足。研究得出的结论是,应通过严格的政策执行来研究一般制约因素和成因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis of Constraints against Efficiency of Seaport-hinterland Logistics in Nigeria
Having realized that most Nigerian seaports are congested and the problem of moving goods have been difficult, the Federal Government through Bureau of Public Enterprises and Nigerian Shippers’ Council were mandated to identify Inland Container Depots (ICDs) and Container Freight Stations (CFSs) across the country with connectivity to rail transport. Since 2004 to date, these have mostly not been functioning. This paper therefore examined the constraints and possible factors responsible. The Nigerian Ports Authority, Road Haulage Association, Terminal Operators, selected Shipping companies were used as respondents. 34.1% (253) from the population of 743 respondents were sampled with the use of Cochran formula and stratified random sampling technique. Shaphiro Test and multiple regression were used to analyze the constraints against the use of ICDs and CFSs. Principal Component Analysis was used to extract the major factors hindering port-hinterland logistics in Nigeria. It was observed that 50% of general logistics constraints emanated from lack of efficient rail system, enforcement and finance combined. Extracted causative factors against port-hinterland movements of goods are: inadequate terminal capacity, parking and inadequacy of cargo handling facilities. The research concluded that both general constraints and causative factors are to be looked into with stringent policy enforcement.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Periodica Polytechnica Transportation Engineering
Periodica Polytechnica Transportation Engineering Engineering-Automotive Engineering
CiteScore
2.60
自引率
0.00%
发文量
47
期刊介绍: Periodica Polytechnica is a publisher of the Budapest University of Technology and Economics. It publishes seven international journals (Architecture, Chemical Engineering, Civil Engineering, Electrical Engineering, Mechanical Engineering, Social and Management Sciences, Transportation Engineering). The journals have free electronic versions.
期刊最新文献
Investigating the Preference on Public Transport in a Metropolitan Area of Lampung Province, Indonesia Secure Travel Planning Using a Heuristic Algorithm Verification of Railway Control Systems Using Model Checking and CTL, Explained Through a Case Study A Grid-based Framework for Managing Autonomous Vehicles' Movement at Intersections The Environmental Sustainability Potential of Autonomous Vehicles: An Overview
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1