关于越南河内建筑项目时间表的研究

IF 1.1 Q3 ENGINEERING, CIVIL Archives of Civil Engineering Pub Date : 2024-03-29 DOI:10.24425/ace.2024.148935
D. Hai
{"title":"关于越南河内建筑项目时间表的研究","authors":"D. Hai","doi":"10.24425/ace.2024.148935","DOIUrl":null,"url":null,"abstract":"With its position as the capital, Hanoi is the political center as well as the second largest economic center of the country. Therefore, the city is always allocated a large budget in construction investment to create material facilities for political tasks and economic and social development. During the implementation of construction projects, a number of difficulties and limitations have appeared. In which, projects are delayed in construction and disbursement, reducing investment efficiency and not meeting the expectations of the government and people. From this fact, the authors have conducted a study to evaluate the causes affecting the time schedule of construction projects in Hanoi. The method F-APH (Fuzzy Analytic Hierarchy Process) was used to analyze data objectively and accurately about the causes affecting the time schedule. From there, these causes are classified into groups of subjective causes (from within the project) and groups of objective causes (from outside the project). The results show that subjective causes, originating from project participants, have a stronger influence than objective causes. A number of specific proposals to the actors involved in construction projects are made to eliminate or limit the impact of the causes of construction progress.","PeriodicalId":45753,"journal":{"name":"Archives of Civil Engineering","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2024-03-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A study on time schedules for construction projects in Hanoi, Vietnam\",\"authors\":\"D. Hai\",\"doi\":\"10.24425/ace.2024.148935\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With its position as the capital, Hanoi is the political center as well as the second largest economic center of the country. Therefore, the city is always allocated a large budget in construction investment to create material facilities for political tasks and economic and social development. During the implementation of construction projects, a number of difficulties and limitations have appeared. In which, projects are delayed in construction and disbursement, reducing investment efficiency and not meeting the expectations of the government and people. From this fact, the authors have conducted a study to evaluate the causes affecting the time schedule of construction projects in Hanoi. The method F-APH (Fuzzy Analytic Hierarchy Process) was used to analyze data objectively and accurately about the causes affecting the time schedule. From there, these causes are classified into groups of subjective causes (from within the project) and groups of objective causes (from outside the project). The results show that subjective causes, originating from project participants, have a stronger influence than objective causes. A number of specific proposals to the actors involved in construction projects are made to eliminate or limit the impact of the causes of construction progress.\",\"PeriodicalId\":45753,\"journal\":{\"name\":\"Archives of Civil Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2024-03-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24425/ace.2024.148935\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/ace.2024.148935","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

河内作为首都,是全国的政治中心和第二大经济中心。因此,河内市一直在建设投资方面拨出大量预算,为政治任务和经济社会发展创造物质条件。在建设项目的实施过程中,出现了一些困难和限制。其中,项目建设和资金拨付滞后,降低了投资效率,没有达到政府和人民的期望。基于这一事实,作者对影响河内建设项目时间进度的原因进行了评估研究。研究采用了 F-APH(模糊分析层次过程)方法,对影响工期的原因进行客观、准确的数据分析。然后,将这些原因分为主观原因组(来自项目内部)和客观原因组(来自项目外部)。结果表明,来自项目参与者的主观原因比客观原因的影响更大。为消除或限制施工进度原因的影响,向参与施工项目的人员提出了一些具体建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A study on time schedules for construction projects in Hanoi, Vietnam
With its position as the capital, Hanoi is the political center as well as the second largest economic center of the country. Therefore, the city is always allocated a large budget in construction investment to create material facilities for political tasks and economic and social development. During the implementation of construction projects, a number of difficulties and limitations have appeared. In which, projects are delayed in construction and disbursement, reducing investment efficiency and not meeting the expectations of the government and people. From this fact, the authors have conducted a study to evaluate the causes affecting the time schedule of construction projects in Hanoi. The method F-APH (Fuzzy Analytic Hierarchy Process) was used to analyze data objectively and accurately about the causes affecting the time schedule. From there, these causes are classified into groups of subjective causes (from within the project) and groups of objective causes (from outside the project). The results show that subjective causes, originating from project participants, have a stronger influence than objective causes. A number of specific proposals to the actors involved in construction projects are made to eliminate or limit the impact of the causes of construction progress.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Archives of Civil Engineering
Archives of Civil Engineering ENGINEERING, CIVIL-
CiteScore
1.50
自引率
28.60%
发文量
0
审稿时长
24 weeks
期刊介绍: ARCHIVES OF CIVIL ENGINEERING publish original papers of the theoretical, experimental, numerical and practical nature in the fields of structural mechanics, soil mechanics and foundations engineering, concrete, metal, timber and composite polymer structures, hydrotechnical structures, roads, railways and bridges, building services, building physics, management in construction, production of construction materials, construction of civil engineering structures, education of civil engineers.
期刊最新文献
Determining the trend of geometrical changes of a hydrotechnical object based on data in the form of LiDAR point clouds A study on time schedules for construction projects in Hanoi, Vietnam Study on failure modes and calculation method of the cast steel joint with branches in treelike structure Prediction of CPTu static sounding parameters based on DPH dynamic probing heavy test on the example of “the Praski terrace” sands inWarsaw title Application of the interval approach to determine the exploitation time of pipelines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1