仁新高速公路里洞隧道穿越岩溶洞穴的受力分析与处理

IF 1.1 Q3 ENGINEERING, CIVIL Archives of Civil Engineering Pub Date : 2024-03-29 DOI:10.24425/ace.2024.148936
Kai Zhu, Kui Zhang, Xiang-Dong Wu, Xiang-Ge Chen
{"title":"仁新高速公路里洞隧道穿越岩溶洞穴的受力分析与处理","authors":"Kai Zhu, Kui Zhang, Xiang-Dong Wu, Xiang-Ge Chen","doi":"10.24425/ace.2024.148936","DOIUrl":null,"url":null,"abstract":"There are several large karst caves at haunch part of the Lidong Tunnel during construction, together with inrush water due to high pressure within these caves. In light of it, this paper takes YK342+113 section as an example and adopts finite difference software FLAC 3D, so as to analyze tunnel deformation when crossing karst caves under six different working conditions, including with or without karst cave, before and after karst treatment, along with support locations. According to analysis results: First, the wall rock mainly had deformation at tunnel vault when evacuating at the third bench, which is a critical monitoring focus for tunnel construction; Second, karst cave treatment contributed to better conduct forces on both sides of wall rock, thus reducing vault settlement, while not affecting horizontal convergence and upturn of vaults; Third, treatment measures were proved to be effective in minimizing wall rock deformation by comparing deformation curves under different conditions; Fourth, after treatment measures, the angular points within the cave’s chamber had stress concentration, which might cause secondary collapse. Field monitoring data revealed that the final settlement of the tunnel vault was relatively consistent with the numerical analysis results, with a distinct change in daily settlement after initial support construction. By integrating numerical analysis and field monitoring, the rationality of the karst treatment plan was fully verified, providing a valuable reference for similar projects.","PeriodicalId":45753,"journal":{"name":"Archives of Civil Engineering","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2024-03-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Force analysis and treatments for Lidong tunnel of Renxin expressway crossing karst caves\",\"authors\":\"Kai Zhu, Kui Zhang, Xiang-Dong Wu, Xiang-Ge Chen\",\"doi\":\"10.24425/ace.2024.148936\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are several large karst caves at haunch part of the Lidong Tunnel during construction, together with inrush water due to high pressure within these caves. In light of it, this paper takes YK342+113 section as an example and adopts finite difference software FLAC 3D, so as to analyze tunnel deformation when crossing karst caves under six different working conditions, including with or without karst cave, before and after karst treatment, along with support locations. According to analysis results: First, the wall rock mainly had deformation at tunnel vault when evacuating at the third bench, which is a critical monitoring focus for tunnel construction; Second, karst cave treatment contributed to better conduct forces on both sides of wall rock, thus reducing vault settlement, while not affecting horizontal convergence and upturn of vaults; Third, treatment measures were proved to be effective in minimizing wall rock deformation by comparing deformation curves under different conditions; Fourth, after treatment measures, the angular points within the cave’s chamber had stress concentration, which might cause secondary collapse. Field monitoring data revealed that the final settlement of the tunnel vault was relatively consistent with the numerical analysis results, with a distinct change in daily settlement after initial support construction. By integrating numerical analysis and field monitoring, the rationality of the karst treatment plan was fully verified, providing a valuable reference for similar projects.\",\"PeriodicalId\":45753,\"journal\":{\"name\":\"Archives of Civil Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2024-03-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24425/ace.2024.148936\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/ace.2024.148936","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

丽洞隧道在施工过程中,洞口部位存在多处大型岩溶洞穴,洞内压力高,涌水量大。有鉴于此,本文以 YK342+113 断面为例,采用有限差分软件 FLAC 3D,对隧道在有无岩溶溶洞、岩溶处理前后、支护位置等六种不同工况下穿越岩溶溶洞时的变形进行了分析。分析结果显示第一,岩壁岩体主要在隧道拱顶第三台阶疏散时发生变形,这是隧道施工的关键监测重点;第二,岩溶洞穴处理有助于更好地传导两侧岩壁岩体的作用力,从而减少拱顶沉降,同时不影响拱顶的水平收敛和上翻;第三,通过比较不同条件下的变形曲线,证明处理措施能有效减少岩壁岩体变形;第四,采取处理措施后,洞室内的角点出现应力集中,可能造成二次坍塌。现场监测数据显示,隧道拱顶的最终沉降与数值分析结果较为一致,初期支护施工后的日沉降量有明显变化。通过将数值分析与现场监测相结合,充分验证了岩溶处理方案的合理性,为类似工程提供了宝贵的参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Force analysis and treatments for Lidong tunnel of Renxin expressway crossing karst caves
There are several large karst caves at haunch part of the Lidong Tunnel during construction, together with inrush water due to high pressure within these caves. In light of it, this paper takes YK342+113 section as an example and adopts finite difference software FLAC 3D, so as to analyze tunnel deformation when crossing karst caves under six different working conditions, including with or without karst cave, before and after karst treatment, along with support locations. According to analysis results: First, the wall rock mainly had deformation at tunnel vault when evacuating at the third bench, which is a critical monitoring focus for tunnel construction; Second, karst cave treatment contributed to better conduct forces on both sides of wall rock, thus reducing vault settlement, while not affecting horizontal convergence and upturn of vaults; Third, treatment measures were proved to be effective in minimizing wall rock deformation by comparing deformation curves under different conditions; Fourth, after treatment measures, the angular points within the cave’s chamber had stress concentration, which might cause secondary collapse. Field monitoring data revealed that the final settlement of the tunnel vault was relatively consistent with the numerical analysis results, with a distinct change in daily settlement after initial support construction. By integrating numerical analysis and field monitoring, the rationality of the karst treatment plan was fully verified, providing a valuable reference for similar projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Archives of Civil Engineering
Archives of Civil Engineering ENGINEERING, CIVIL-
CiteScore
1.50
自引率
28.60%
发文量
0
审稿时长
24 weeks
期刊介绍: ARCHIVES OF CIVIL ENGINEERING publish original papers of the theoretical, experimental, numerical and practical nature in the fields of structural mechanics, soil mechanics and foundations engineering, concrete, metal, timber and composite polymer structures, hydrotechnical structures, roads, railways and bridges, building services, building physics, management in construction, production of construction materials, construction of civil engineering structures, education of civil engineers.
期刊最新文献
Determining the trend of geometrical changes of a hydrotechnical object based on data in the form of LiDAR point clouds A study on time schedules for construction projects in Hanoi, Vietnam Study on failure modes and calculation method of the cast steel joint with branches in treelike structure Prediction of CPTu static sounding parameters based on DPH dynamic probing heavy test on the example of “the Praski terrace” sands inWarsaw title Application of the interval approach to determine the exploitation time of pipelines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1