改进在一条轨道上组装车组的时间分配方法

D. Kozachenko, B. Gera, I. Taran, R. Korobiova, V. Malashkin, Y. Hermaniuk
{"title":"改进在一条轨道上组装车组的时间分配方法","authors":"D. Kozachenko, B. Gera, I. Taran, R. Korobiova, V. Malashkin, Y. Hermaniuk","doi":"10.33271/nvngu/2024-1/147","DOIUrl":null,"url":null,"abstract":"Purpose. To improve the method for standardizing the duration of the shunting operation of assembling cars on one track. This can be achieved as a result of solving the following research problems: development of a method for searching the optimal order of assembling cars on one track; distribution parameters estimation of the random value of the duration of shunting operation of assembling cars on one track based on calculation experiments. Methodology. During the research, the methods of theory of railway operation, dynamic programming and mathematical statistics were used. Findings. Research on the assembling process of car group to one track established the distribution parameters of the random variable of time spent for shunting. In the course of the research, the problem of choosing the optimal order of shunting operations during car assembling was formalized and solved as a problem of dynamic programming. The time spent for shunting work was chosen as the optimality criterion. The paper considers the possibility of approximating the data of calculation experiments by analytical dependencies. It was found out that the use of linear polynomials with interaction allows obtaining dependencies describing time standards with a relative accuracy of ±5 %. Originality. The method is improved for developing the time standards for shunting work, which, unlike the existing one, is based on the performance of a series of calculation experiments, each of which solves the optimization problem of finding such an order of assembling cars that ensures minimum time consumption for shunting. Practical value. The methods developed in the work and the dependencies obtained allow improving the quality of decisions made when developing technology and designing railway stations and sidings of industrial enterprises.","PeriodicalId":19101,"journal":{"name":"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu","volume":"6 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improvement of the method of time rationing for assembling car groups on one track\",\"authors\":\"D. Kozachenko, B. Gera, I. Taran, R. Korobiova, V. Malashkin, Y. Hermaniuk\",\"doi\":\"10.33271/nvngu/2024-1/147\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose. To improve the method for standardizing the duration of the shunting operation of assembling cars on one track. This can be achieved as a result of solving the following research problems: development of a method for searching the optimal order of assembling cars on one track; distribution parameters estimation of the random value of the duration of shunting operation of assembling cars on one track based on calculation experiments. Methodology. During the research, the methods of theory of railway operation, dynamic programming and mathematical statistics were used. Findings. Research on the assembling process of car group to one track established the distribution parameters of the random variable of time spent for shunting. In the course of the research, the problem of choosing the optimal order of shunting operations during car assembling was formalized and solved as a problem of dynamic programming. The time spent for shunting work was chosen as the optimality criterion. The paper considers the possibility of approximating the data of calculation experiments by analytical dependencies. It was found out that the use of linear polynomials with interaction allows obtaining dependencies describing time standards with a relative accuracy of ±5 %. Originality. The method is improved for developing the time standards for shunting work, which, unlike the existing one, is based on the performance of a series of calculation experiments, each of which solves the optimization problem of finding such an order of assembling cars that ensures minimum time consumption for shunting. Practical value. The methods developed in the work and the dependencies obtained allow improving the quality of decisions made when developing technology and designing railway stations and sidings of industrial enterprises.\",\"PeriodicalId\":19101,\"journal\":{\"name\":\"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu\",\"volume\":\"6 3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33271/nvngu/2024-1/147\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/nvngu/2024-1/147","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

目的改进标准化单轨集车调车作业持续时间的方法。这可以通过解决以下研究问题来实现:开发一种寻找单轨集车最佳顺序的方法;根据计算实验估算单轨集车调车作业持续时间随机值的分布参数。研究方法。在研究过程中,使用了铁路运行理论、动态程序设计和数理统计方法。研究结果。通过对单轨集车过程的研究,确定了调车时间随机变量的分布参数。在研究过程中,选择车辆组装过程中最佳调车作业顺序的问题被形式化,并作为动态程序设计问题加以解决。调车工作所花费的时间被选为优化标准。论文考虑了用分析依赖关系近似计算实验数据的可能性。结果发现,使用具有交互作用的线性多项式可以获得描述时间标准的依赖关系,其相对精确度为±5%。原创性。改进了制定调车工作时间标准的方法,与现有方法不同的是,该方法以一系列计算实验为基础,每个计算实验都要解决一个优化问题,即找到确保调车耗时最少的装车顺序。实用价值。该作品中开发的方法和获得的依赖关系有助于提高工业企业在开发技术、设计火车站和侧线时的决策质量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Improvement of the method of time rationing for assembling car groups on one track
Purpose. To improve the method for standardizing the duration of the shunting operation of assembling cars on one track. This can be achieved as a result of solving the following research problems: development of a method for searching the optimal order of assembling cars on one track; distribution parameters estimation of the random value of the duration of shunting operation of assembling cars on one track based on calculation experiments. Methodology. During the research, the methods of theory of railway operation, dynamic programming and mathematical statistics were used. Findings. Research on the assembling process of car group to one track established the distribution parameters of the random variable of time spent for shunting. In the course of the research, the problem of choosing the optimal order of shunting operations during car assembling was formalized and solved as a problem of dynamic programming. The time spent for shunting work was chosen as the optimality criterion. The paper considers the possibility of approximating the data of calculation experiments by analytical dependencies. It was found out that the use of linear polynomials with interaction allows obtaining dependencies describing time standards with a relative accuracy of ±5 %. Originality. The method is improved for developing the time standards for shunting work, which, unlike the existing one, is based on the performance of a series of calculation experiments, each of which solves the optimization problem of finding such an order of assembling cars that ensures minimum time consumption for shunting. Practical value. The methods developed in the work and the dependencies obtained allow improving the quality of decisions made when developing technology and designing railway stations and sidings of industrial enterprises.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.70
自引率
0.00%
发文量
148
期刊最新文献
Influence of ice structure on vitability of frozen sand-water and sand-clay mixtures Scientific bases and peculiarities of conversion of CHPP anthracite boilers to sub-bituminous coal combustion Enhancement of sorption of the azoic dye (Azucryl Red) by natural and calcined hyper-aluminous kaolins Improvement of the methodology for calculating the expected drilling speed with PDC chisels Influence of the rock mass structure and the blasting technique on blast results in the Heliopolis quarry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1