敏感粘土中挖掘基底下土壤元素的时间有效应力响应

Johannes Tornborg, Mats Karlsson, J. Dijkstra
{"title":"敏感粘土中挖掘基底下土壤元素的时间有效应力响应","authors":"Johannes Tornborg, Mats Karlsson, J. Dijkstra","doi":"10.1139/cgj-2023-0355","DOIUrl":null,"url":null,"abstract":"Investigations into the temporally evolving stress state below the base of excavations and underground structures are very scarce, in contrast to studies of horizontal earth pressures during the construction stage. Therefore in this work, the measured temporal response in terms of vertical and horizontal effective stresses and displacements below a tunnel slab at the base of an excavation located in a deep sensitive clay deposit is reported. In addition to the measured unloading response over time, the completeness of the site description and complementary measurements enables future benchmarking of numerical models at boundary and element level. Instrument clusters of earth pressure cells and piezometers were installed at three locations in one cross-section. The monitoring data allows the interpretation of effective stress paths and stress ratios, K=σ'h/σ'v, at soil element level covering the construction and the serviceability stages. The in situ stress ratios enable a unique comparison to prior laboratory studies of K during unloading. The data presented herein on the evolution of K corroborate, although approximately, previous studies at laboratory scale. Furthermore, at system level, the monitoring data reveal the intricate interplay between deformations resulting from excavation and pile driving.","PeriodicalId":505159,"journal":{"name":"Canadian Geotechnical Journal","volume":"72 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Temporal effective stress response of soil elements below the base of an excavation in sensitive clay\",\"authors\":\"Johannes Tornborg, Mats Karlsson, J. Dijkstra\",\"doi\":\"10.1139/cgj-2023-0355\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Investigations into the temporally evolving stress state below the base of excavations and underground structures are very scarce, in contrast to studies of horizontal earth pressures during the construction stage. Therefore in this work, the measured temporal response in terms of vertical and horizontal effective stresses and displacements below a tunnel slab at the base of an excavation located in a deep sensitive clay deposit is reported. In addition to the measured unloading response over time, the completeness of the site description and complementary measurements enables future benchmarking of numerical models at boundary and element level. Instrument clusters of earth pressure cells and piezometers were installed at three locations in one cross-section. The monitoring data allows the interpretation of effective stress paths and stress ratios, K=σ'h/σ'v, at soil element level covering the construction and the serviceability stages. The in situ stress ratios enable a unique comparison to prior laboratory studies of K during unloading. The data presented herein on the evolution of K corroborate, although approximately, previous studies at laboratory scale. Furthermore, at system level, the monitoring data reveal the intricate interplay between deformations resulting from excavation and pile driving.\",\"PeriodicalId\":505159,\"journal\":{\"name\":\"Canadian Geotechnical Journal\",\"volume\":\"72 2\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-02-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Canadian Geotechnical Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1139/cgj-2023-0355\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Canadian Geotechnical Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1139/cgj-2023-0355","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

与施工阶段对水平土压力的研究相比,对挖掘和地下结构底部随时间变化的应力状态的研究非常少。因此,在这项研究中,我们报告了位于深层敏感粘土沉积中的挖掘工程底部隧道底板下面的垂直和水平有效应力和位移的时间响应测量结果。除了测量到的卸载随时间变化的响应之外,现场描述和补充测量的完整性还有助于未来在边界和元素层面对数值模型进行基准测试。在一个断面的三个位置安装了由土压力传感器和压强计组成的仪器群。通过监测数据,可以解释施工和使用阶段土壤元素层面的有效应力路径和应力比 K=σ'h/σ'v。通过现场应力比,可以将卸载过程中的 K 与之前的实验室研究进行比较。本文提供的有关 K 演变的数据与之前在实验室规模上进行的研究相吻合(尽管只是近似)。此外,在系统层面,监测数据揭示了开挖和打桩造成的变形之间错综复杂的相互作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Temporal effective stress response of soil elements below the base of an excavation in sensitive clay
Investigations into the temporally evolving stress state below the base of excavations and underground structures are very scarce, in contrast to studies of horizontal earth pressures during the construction stage. Therefore in this work, the measured temporal response in terms of vertical and horizontal effective stresses and displacements below a tunnel slab at the base of an excavation located in a deep sensitive clay deposit is reported. In addition to the measured unloading response over time, the completeness of the site description and complementary measurements enables future benchmarking of numerical models at boundary and element level. Instrument clusters of earth pressure cells and piezometers were installed at three locations in one cross-section. The monitoring data allows the interpretation of effective stress paths and stress ratios, K=σ'h/σ'v, at soil element level covering the construction and the serviceability stages. The in situ stress ratios enable a unique comparison to prior laboratory studies of K during unloading. The data presented herein on the evolution of K corroborate, although approximately, previous studies at laboratory scale. Furthermore, at system level, the monitoring data reveal the intricate interplay between deformations resulting from excavation and pile driving.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Strength and Dilatancy of Crushable Soils With Different Gradings Physical model case study: treatment effect of soft ground by vacuum preloading combined with liquid bag pressurization method Discussion of “Investigation of soil setup effects on pile response in clay considering over-consolidation ratio and installation method through physical modeling” Numerical investigation on the pullout capacity of suction caissons in silty sand-over-clay deposit Three-dimensional voxel geological modelling for subsurface stratigraphy: A graph convolutional network approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1