通过重型设备维修革命实现设施布局优化创新

Mochamad Afan Wahyu Prediansyah, A. S. Cahyana
{"title":"通过重型设备维修革命实现设施布局优化创新","authors":"Mochamad Afan Wahyu Prediansyah, A. S. Cahyana","doi":"10.21070/ijins.v25i3.1167","DOIUrl":null,"url":null,"abstract":"This study addresses the challenge of prolonged forklift repair times at PT Karya Mitra Teknik, a heavy equipment repair company, attributed to inefficient facility layout. Through field observations and stakeholder interviews, Activity Relationship Chart (ARC) and Analysis Allocation Diagram (AAD) methods were applied to identify inefficiencies and propose layout improvements. Results show a significant reduction in total repair area distance from 110 meters to 55 meters, indicating enhanced operational efficiency. The findings underscore the importance of optimizing facility layout in heavy equipment repair workshops to streamline operations and reduce repair turnaround times, offering practical implications for similar industries seeking cost-effective solutions. \nHighlights: \n1. Efficient facility layout reduces repair area distance.2. ARC and AAD methods streamline resource allocation.3. Optimal layout enhances operational efficiency, reduces turnaround times. \nKeywords: Facility Layout Optimization, Heavy Equipment Repair, Operational Efficiency, Activity Relationship Chart (ARC), Analysis Allocation Diagram (AAD)","PeriodicalId":431998,"journal":{"name":"Indonesian Journal of Innovation Studies","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-06-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Innovation in Facility Layout Optimization through Heavy Equipment Repair revolution\",\"authors\":\"Mochamad Afan Wahyu Prediansyah, A. S. Cahyana\",\"doi\":\"10.21070/ijins.v25i3.1167\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study addresses the challenge of prolonged forklift repair times at PT Karya Mitra Teknik, a heavy equipment repair company, attributed to inefficient facility layout. Through field observations and stakeholder interviews, Activity Relationship Chart (ARC) and Analysis Allocation Diagram (AAD) methods were applied to identify inefficiencies and propose layout improvements. Results show a significant reduction in total repair area distance from 110 meters to 55 meters, indicating enhanced operational efficiency. The findings underscore the importance of optimizing facility layout in heavy equipment repair workshops to streamline operations and reduce repair turnaround times, offering practical implications for similar industries seeking cost-effective solutions. \\nHighlights: \\n1. Efficient facility layout reduces repair area distance.2. ARC and AAD methods streamline resource allocation.3. Optimal layout enhances operational efficiency, reduces turnaround times. \\nKeywords: Facility Layout Optimization, Heavy Equipment Repair, Operational Efficiency, Activity Relationship Chart (ARC), Analysis Allocation Diagram (AAD)\",\"PeriodicalId\":431998,\"journal\":{\"name\":\"Indonesian Journal of Innovation Studies\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indonesian Journal of Innovation Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21070/ijins.v25i3.1167\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Journal of Innovation Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21070/ijins.v25i3.1167","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT Karya Mitra Teknik 是一家重型设备维修公司,由于设施布局效率低下,导致叉车维修时间延长。通过实地观察和利益相关者访谈,采用了活动关系图(ARC)和分析分配图(AAD)方法来识别低效问题并提出布局改进建议。结果显示,维修区总距离从 110 米大幅缩短至 55 米,表明运营效率得到提高。研究结果强调了优化重型设备维修车间设施布局以简化操作和缩短维修周转时间的重要性,为寻求具有成本效益的解决方案的类似行业提供了实际意义。亮点1.2. ARC 和 AAD 方法简化了资源分配。 3. 优化布局提高了运营效率,缩短了周转时间。关键词:设施布局优化设施布局优化、重型设备维修、运营效率、活动关系图 (ARC)、分析分配图 (AAD)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Innovation in Facility Layout Optimization through Heavy Equipment Repair revolution
This study addresses the challenge of prolonged forklift repair times at PT Karya Mitra Teknik, a heavy equipment repair company, attributed to inefficient facility layout. Through field observations and stakeholder interviews, Activity Relationship Chart (ARC) and Analysis Allocation Diagram (AAD) methods were applied to identify inefficiencies and propose layout improvements. Results show a significant reduction in total repair area distance from 110 meters to 55 meters, indicating enhanced operational efficiency. The findings underscore the importance of optimizing facility layout in heavy equipment repair workshops to streamline operations and reduce repair turnaround times, offering practical implications for similar industries seeking cost-effective solutions. Highlights: 1. Efficient facility layout reduces repair area distance.2. ARC and AAD methods streamline resource allocation.3. Optimal layout enhances operational efficiency, reduces turnaround times. Keywords: Facility Layout Optimization, Heavy Equipment Repair, Operational Efficiency, Activity Relationship Chart (ARC), Analysis Allocation Diagram (AAD)
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of the Effect of Fraud Pentagon on Financial Statement Fraud Using M-Score and F-Score Transforming Aluminum Welding Through FSW Innovations Revolutionizing Welding Ergonomics to Mitigate Musculoskeletal Risks NaOH Treatment Revolutionizes Strength of Fiber Composites Globally Overcoming Quality Control Challenges in Car Exhaust Manufacturing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1