并行机器调度,处理时间取决于位置,维护活动不断恶化

IF 16.4 1区 化学 Q1 CHEMISTRY, MULTIDISCIPLINARY Accounts of Chemical Research Pub Date : 2024-06-27 DOI:10.1007/s10898-024-01411-2
Chaoming Hu, Rui Zheng, Shaojun Lu, Xinbao Liu
{"title":"并行机器调度,处理时间取决于位置,维护活动不断恶化","authors":"Chaoming Hu, Rui Zheng, Shaojun Lu, Xinbao Liu","doi":"10.1007/s10898-024-01411-2","DOIUrl":null,"url":null,"abstract":"<p>Maintenance and production exert reciprocal influence in practical manufacturing applications. However, decisions regarding production scheduling and maintenance planning are often made separately, leading to frequent conflicts between production and maintenance plans. This paper investigates an integrated production scheduling and maintenance planning problem for a parallel machine system, considering both deteriorating jobs and deteriorating maintenance activities. Additionally, the problem features constraints on the number of available maintenance activities due to maintenance budget limitations. The objective is to determine the optimal scheduling and maintenance plan that minimizes the makespan. To tackle this complex problem, we initially delve into the special case where jobs and maintenance activities are already assigned to machines. In our endeavor to minimize the makespan for each machine, we uncover some crucial structural properties and present a polynomial-time algorithm. Subsequently, we develop a hybrid algorithm that combines Whale Optimization Algorithm and Variable Neighborhood Search (WOA–VNS) to address the assignment challenge encompassing jobs and maintenance activities within the parallel machine environment. A series of rigorous comparative experiments are conducted to assess the effectiveness of the proposed algorithm. The results conclusively demonstrate the superior performance of the WOA–VNS algorithm over the WOA, VNS, ABC, and ACO algorithms in addressing the presented problem.</p>","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2024-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Parallel machine scheduling with position-dependent processing times and deteriorating maintenance activities\",\"authors\":\"Chaoming Hu, Rui Zheng, Shaojun Lu, Xinbao Liu\",\"doi\":\"10.1007/s10898-024-01411-2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Maintenance and production exert reciprocal influence in practical manufacturing applications. However, decisions regarding production scheduling and maintenance planning are often made separately, leading to frequent conflicts between production and maintenance plans. This paper investigates an integrated production scheduling and maintenance planning problem for a parallel machine system, considering both deteriorating jobs and deteriorating maintenance activities. Additionally, the problem features constraints on the number of available maintenance activities due to maintenance budget limitations. The objective is to determine the optimal scheduling and maintenance plan that minimizes the makespan. To tackle this complex problem, we initially delve into the special case where jobs and maintenance activities are already assigned to machines. In our endeavor to minimize the makespan for each machine, we uncover some crucial structural properties and present a polynomial-time algorithm. Subsequently, we develop a hybrid algorithm that combines Whale Optimization Algorithm and Variable Neighborhood Search (WOA–VNS) to address the assignment challenge encompassing jobs and maintenance activities within the parallel machine environment. A series of rigorous comparative experiments are conducted to assess the effectiveness of the proposed algorithm. The results conclusively demonstrate the superior performance of the WOA–VNS algorithm over the WOA, VNS, ABC, and ACO algorithms in addressing the presented problem.</p>\",\"PeriodicalId\":1,\"journal\":{\"name\":\"Accounts of Chemical Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":16.4000,\"publicationDate\":\"2024-06-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Accounts of Chemical Research\",\"FirstCategoryId\":\"100\",\"ListUrlMain\":\"https://doi.org/10.1007/s10898-024-01411-2\",\"RegionNum\":1,\"RegionCategory\":\"化学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CHEMISTRY, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"100","ListUrlMain":"https://doi.org/10.1007/s10898-024-01411-2","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

在实际生产应用中,维护与生产相互影响。然而,有关生产调度和维护计划的决策往往是分开进行的,导致生产计划和维护计划之间经常发生冲突。本文研究了并行机器系统的生产调度和维护计划综合问题,同时考虑了不断恶化的工作和不断恶化的维护活动。此外,由于维护预算的限制,该问题的特点是对可用维护活动数量的约束。我们的目标是确定最优的排产和维护计划,使生产周期最小化。为了解决这个复杂的问题,我们首先研究了工作和维护活动已经分配给机器的特殊情况。在努力最小化每台机器的运行间隔的过程中,我们发现了一些关键的结构特性,并提出了一种多项式时间算法。随后,我们开发了一种结合了鲸鱼优化算法和变量邻域搜索(WOA-VNS)的混合算法,以解决并行机器环境中包含作业和维护活动的分配难题。为评估所提算法的有效性,我们进行了一系列严格的对比实验。结果确凿证明,在解决所提出的问题时,WOA-VNS 算法的性能优于 WOA、VNS、ABC 和 ACO 算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Parallel machine scheduling with position-dependent processing times and deteriorating maintenance activities

Maintenance and production exert reciprocal influence in practical manufacturing applications. However, decisions regarding production scheduling and maintenance planning are often made separately, leading to frequent conflicts between production and maintenance plans. This paper investigates an integrated production scheduling and maintenance planning problem for a parallel machine system, considering both deteriorating jobs and deteriorating maintenance activities. Additionally, the problem features constraints on the number of available maintenance activities due to maintenance budget limitations. The objective is to determine the optimal scheduling and maintenance plan that minimizes the makespan. To tackle this complex problem, we initially delve into the special case where jobs and maintenance activities are already assigned to machines. In our endeavor to minimize the makespan for each machine, we uncover some crucial structural properties and present a polynomial-time algorithm. Subsequently, we develop a hybrid algorithm that combines Whale Optimization Algorithm and Variable Neighborhood Search (WOA–VNS) to address the assignment challenge encompassing jobs and maintenance activities within the parallel machine environment. A series of rigorous comparative experiments are conducted to assess the effectiveness of the proposed algorithm. The results conclusively demonstrate the superior performance of the WOA–VNS algorithm over the WOA, VNS, ABC, and ACO algorithms in addressing the presented problem.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Accounts of Chemical Research
Accounts of Chemical Research 化学-化学综合
CiteScore
31.40
自引率
1.10%
发文量
312
审稿时长
2 months
期刊介绍: Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance. Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.
期刊最新文献
Management of Cholesteatoma: Hearing Rehabilitation. Congenital Cholesteatoma. Evaluation of Cholesteatoma. Management of Cholesteatoma: Extension Beyond Middle Ear/Mastoid. Recidivism and Recurrence.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1