面向团队的产品开发项目的完整精益系统设计

IF 3.8 2区 工程技术 Q2 ENGINEERING, INDUSTRIAL International Journal of Lean Six Sigma Pub Date : 2024-07-10 DOI:10.1108/ijlss-07-2023-0124
M. B. Durmusoglu, C. Aglan
{"title":"面向团队的产品开发项目的完整精益系统设计","authors":"M. B. Durmusoglu, C. Aglan","doi":"10.1108/ijlss-07-2023-0124","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe inherent variability on process times and demand are the factors that prevent the efficient application of lean philosophy in multi-project product development (PD) environments. Considering this variability, a hybrid push–pull project control system is developed, and value stream costing (VSC) analysis is performed to reflect the relation between project lead time, capacity and project cost. The assessment of the push/pull project control on lead time improvement and long-term savings on capacity have been aimed with the proposed complete design structure.\n\n\nDesign/methodology/approach\nIn a team-based structure, formed through clustering, push control techniques for planning tasks within cross-functional teams and pull control techniques for planning tasks between cross-functional teams are developed. The final step evaluates the proposed structure through VSC and long-term savings have been pointed out, especially in terms of freed-up capacity. For the validation of the proposed methodology, an office furniture manufacturing firm’s PD department has been considered and the performance of the hybrid system has been observed through simulation experiments and based on the simulation results, the lean system is evaluated by VSC.\n\n\nFindings\nThe results of simulation experiments show a superior performance of the proposed hybrid push/pull project control mechanism under different settings of cycle time between projects or shortly project cycle time, dispatching rules within teams and variability levels. The results of the Box-Score (tool to apply VSC) indicate increased capacity in the long term to add extra projects during the planning period with the same project lead time and without additional cost.\n\n\nResearch limitations/implications\nAlthough extensive simulation experiments have been performed to quantify the effect of project control structure and positive results have been reported on lead time and cost, the proposed design structure has not been tested in all existing PD environments.\n\n\nOriginality/value\nTo the best of authors’ knowledge, the quantification of the effect of hybrid project control with VSC is the first attempt to be applied in lean PD projects.\n","PeriodicalId":48601,"journal":{"name":"International Journal of Lean Six Sigma","volume":null,"pages":null},"PeriodicalIF":3.8000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A complete lean system design for team-oriented product development projects\",\"authors\":\"M. B. Durmusoglu, C. Aglan\",\"doi\":\"10.1108/ijlss-07-2023-0124\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThe inherent variability on process times and demand are the factors that prevent the efficient application of lean philosophy in multi-project product development (PD) environments. Considering this variability, a hybrid push–pull project control system is developed, and value stream costing (VSC) analysis is performed to reflect the relation between project lead time, capacity and project cost. The assessment of the push/pull project control on lead time improvement and long-term savings on capacity have been aimed with the proposed complete design structure.\\n\\n\\nDesign/methodology/approach\\nIn a team-based structure, formed through clustering, push control techniques for planning tasks within cross-functional teams and pull control techniques for planning tasks between cross-functional teams are developed. The final step evaluates the proposed structure through VSC and long-term savings have been pointed out, especially in terms of freed-up capacity. For the validation of the proposed methodology, an office furniture manufacturing firm’s PD department has been considered and the performance of the hybrid system has been observed through simulation experiments and based on the simulation results, the lean system is evaluated by VSC.\\n\\n\\nFindings\\nThe results of simulation experiments show a superior performance of the proposed hybrid push/pull project control mechanism under different settings of cycle time between projects or shortly project cycle time, dispatching rules within teams and variability levels. The results of the Box-Score (tool to apply VSC) indicate increased capacity in the long term to add extra projects during the planning period with the same project lead time and without additional cost.\\n\\n\\nResearch limitations/implications\\nAlthough extensive simulation experiments have been performed to quantify the effect of project control structure and positive results have been reported on lead time and cost, the proposed design structure has not been tested in all existing PD environments.\\n\\n\\nOriginality/value\\nTo the best of authors’ knowledge, the quantification of the effect of hybrid project control with VSC is the first attempt to be applied in lean PD projects.\\n\",\"PeriodicalId\":48601,\"journal\":{\"name\":\"International Journal of Lean Six Sigma\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.8000,\"publicationDate\":\"2024-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Lean Six Sigma\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1108/ijlss-07-2023-0124\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Lean Six Sigma","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1108/ijlss-07-2023-0124","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

目的 流程时间和需求的内在可变性是阻碍精益理念在多项目产品开发(PD)环境中有效应用的因素。考虑到这种可变性,我们开发了一种混合推拉式项目控制系统,并进行了价值流成本计算(VSC)分析,以反映项目提前期、产能和项目成本之间的关系。设计/方法/途径在通过聚类形成的基于团队的结构中,开发了用于跨职能团队内部计划任务的推式控制技术和用于跨职能团队之间计划任务的拉式控制技术。最后一步是通过 VSC 对建议的结构进行评估,并指出长期的节约,特别是在释放能力方面。为了验证所提出的方法,考虑了一家办公家具制造公司的 PD 部门,通过仿真实验观察了混合系统的性能,并根据仿真结果通过 VSC 对精益系统进行了评估。仿真实验结果表明,在不同的项目间周期时间或短期项目周期时间、团队内部调度规则和可变性水平设置下,所提出的推/拉混合项目控制机制性能优越。研究的局限性/意义虽然已经进行了大量的模拟实验来量化项目控制结构的效果,并报告了在前置时间和成本方面的积极结果,但所提出的设计结构尚未在所有现有的项目开发环境中进行测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A complete lean system design for team-oriented product development projects
Purpose The inherent variability on process times and demand are the factors that prevent the efficient application of lean philosophy in multi-project product development (PD) environments. Considering this variability, a hybrid push–pull project control system is developed, and value stream costing (VSC) analysis is performed to reflect the relation between project lead time, capacity and project cost. The assessment of the push/pull project control on lead time improvement and long-term savings on capacity have been aimed with the proposed complete design structure. Design/methodology/approach In a team-based structure, formed through clustering, push control techniques for planning tasks within cross-functional teams and pull control techniques for planning tasks between cross-functional teams are developed. The final step evaluates the proposed structure through VSC and long-term savings have been pointed out, especially in terms of freed-up capacity. For the validation of the proposed methodology, an office furniture manufacturing firm’s PD department has been considered and the performance of the hybrid system has been observed through simulation experiments and based on the simulation results, the lean system is evaluated by VSC. Findings The results of simulation experiments show a superior performance of the proposed hybrid push/pull project control mechanism under different settings of cycle time between projects or shortly project cycle time, dispatching rules within teams and variability levels. The results of the Box-Score (tool to apply VSC) indicate increased capacity in the long term to add extra projects during the planning period with the same project lead time and without additional cost. Research limitations/implications Although extensive simulation experiments have been performed to quantify the effect of project control structure and positive results have been reported on lead time and cost, the proposed design structure has not been tested in all existing PD environments. Originality/value To the best of authors’ knowledge, the quantification of the effect of hybrid project control with VSC is the first attempt to be applied in lean PD projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Lean Six Sigma
International Journal of Lean Six Sigma Engineering-Industrial and Manufacturing Engineering
CiteScore
8.90
自引率
15.00%
发文量
46
期刊介绍: Launched in 2010, International Journal of Lean Six Sigma publishes original, empirical and review papers, case studies and theoretical frameworks or models related to Lean and Six Sigma methodologies. High quality submissions are sought from academics, researchers, practitioners and leading management consultants from around the world. Research, case studies and examples can be cited from manufacturing, service and public sectors. This includes manufacturing, health, financial services, local government, education, professional services, IT Services, transport, etc.
期刊最新文献
Overall lean and green effectiveness based on the environmentally sustainable value stream mapping adapted to agribusiness Quality improvement of magnetron in Company T based on Six Sigma Adapting and validating the EPLIT for assessing lean healthcare maturity in Brazilian hospitals Quality improvement development in Swedish healthcare and welfare services Adopting Industry 4.0 technologies through lean tools: evidence from the European Manufacturing Survey
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1