{"title":"加强电力系统中风力发电厂互联的电网影响分析","authors":"A. Senen, Arif Kurniawan, Hasna Satya Dini, Dwi Anggaini","doi":"10.11591/ijeecs.v35.i1.pp32-41","DOIUrl":null,"url":null,"abstract":"The Timor system is one of the large systems in the East Nusa Tenggara region. Based on the general plan for electricity supply for 2021-2030, there is a plan to interconnect a 2x11 MW wind power plant. The addition of wind power plants will pose a considerable threat to the system due to the intermittency nature of renewable energy plants. Therefore, a comprehensive grid impact study is needed to convince network managers that adding wind farms will not cause disruptions to the system either locally or in general and is expected to strengthen the electricity system. The power flow simulation results, installing a 2x11 MW wind farm on the Timor system can improve voltage quality and reduce losses on both 70 and 150 kV systems. For transient stability, the frequency value on the Timor system still meets the grid code requirements. In addition, the simulation results of the intermittency impact of the wind power plant output show that the Timor system is still in a stable condition. The stability of the rotor angle of the existing power plant when the transient stability simulation is carried out shows that it is still in a balanced condition.","PeriodicalId":13480,"journal":{"name":"Indonesian Journal of Electrical Engineering and Computer Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Grid impact analysis on wind power plant interconnection in strengthening electricity systems\",\"authors\":\"A. Senen, Arif Kurniawan, Hasna Satya Dini, Dwi Anggaini\",\"doi\":\"10.11591/ijeecs.v35.i1.pp32-41\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Timor system is one of the large systems in the East Nusa Tenggara region. Based on the general plan for electricity supply for 2021-2030, there is a plan to interconnect a 2x11 MW wind power plant. The addition of wind power plants will pose a considerable threat to the system due to the intermittency nature of renewable energy plants. Therefore, a comprehensive grid impact study is needed to convince network managers that adding wind farms will not cause disruptions to the system either locally or in general and is expected to strengthen the electricity system. The power flow simulation results, installing a 2x11 MW wind farm on the Timor system can improve voltage quality and reduce losses on both 70 and 150 kV systems. For transient stability, the frequency value on the Timor system still meets the grid code requirements. In addition, the simulation results of the intermittency impact of the wind power plant output show that the Timor system is still in a stable condition. The stability of the rotor angle of the existing power plant when the transient stability simulation is carried out shows that it is still in a balanced condition.\",\"PeriodicalId\":13480,\"journal\":{\"name\":\"Indonesian Journal of Electrical Engineering and Computer Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indonesian Journal of Electrical Engineering and Computer Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11591/ijeecs.v35.i1.pp32-41\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Mathematics\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Journal of Electrical Engineering and Computer Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11591/ijeecs.v35.i1.pp32-41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 0

摘要

帝汶系统是东努沙登加拉地区的大型系统之一。根据 2021-2030 年电力供应总体规划,计划互联一座 2x11 兆瓦的风力发电厂。由于可再生能源发电厂的间歇性,风力发电厂的增加将对系统构成相当大的威胁。因此,需要进行全面的电网影响研究,使电网管理者相信增加风力发电厂不会对局部或整体系统造成干扰,并有望加强电力系统。电力流模拟结果表明,在帝汶系统中安装 2x11 兆瓦风力发电场可改善电压质量,减少 70 千伏和 150 千伏系统的损耗。在暂态稳定性方面,帝汶系统的频率值仍然符合电网规范要求。此外,风力发电厂输出间歇性影响的模拟结果显示,帝汶系统仍处于稳定状态。在进行暂态稳定性仿真时,现有发电厂转子角度的稳定性表明其仍处于平衡状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Grid impact analysis on wind power plant interconnection in strengthening electricity systems
The Timor system is one of the large systems in the East Nusa Tenggara region. Based on the general plan for electricity supply for 2021-2030, there is a plan to interconnect a 2x11 MW wind power plant. The addition of wind power plants will pose a considerable threat to the system due to the intermittency nature of renewable energy plants. Therefore, a comprehensive grid impact study is needed to convince network managers that adding wind farms will not cause disruptions to the system either locally or in general and is expected to strengthen the electricity system. The power flow simulation results, installing a 2x11 MW wind farm on the Timor system can improve voltage quality and reduce losses on both 70 and 150 kV systems. For transient stability, the frequency value on the Timor system still meets the grid code requirements. In addition, the simulation results of the intermittency impact of the wind power plant output show that the Timor system is still in a stable condition. The stability of the rotor angle of the existing power plant when the transient stability simulation is carried out shows that it is still in a balanced condition.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.90
自引率
0.00%
发文量
782
期刊介绍: The aim of Indonesian Journal of Electrical Engineering and Computer Science (formerly TELKOMNIKA Indonesian Journal of Electrical Engineering) is to publish high-quality articles dedicated to all aspects of the latest outstanding developments in the field of electrical engineering. Its scope encompasses the applications of Telecommunication and Information Technology, Applied Computing and Computer, Instrumentation and Control, Electrical (Power), Electronics Engineering and Informatics which covers, but not limited to, the following scope: Signal Processing[...] Electronics[...] Electrical[...] Telecommunication[...] Instrumentation & Control[...] Computing and Informatics[...]
期刊最新文献
Sampled-data observer design for sensorless control of wind energy conversion system with PMSG URL shortener for web consumption: an extensive and impressive security algorithm Artificial intelligence powered internet of vehicles: securing connected vehicles in 6G PQ enhancement in grid connected EV charging station using novel GVCR control algorithm for AUPQC device Identification of soluble solid content and total acid content using real-time visual inspection system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1