I. Simanjuntak, Heryanto, Akhmad Wahyu Dani, Ketty Salamah, L. M. Silalahi, Marsuki
{"title":"利用 Pvsyst 软件分析住宅区太阳能公共街道照明的优化问题","authors":"I. Simanjuntak, Heryanto, Akhmad Wahyu Dani, Ketty Salamah, L. M. Silalahi, Marsuki","doi":"10.24425/ijet.2024.149604","DOIUrl":null,"url":null,"abstract":"The duration of street light illumination on solarpowered public street lighting is often short-lived (decreased Tlol) due to exposure to near shading (loss irradiance) of 8.89% in residential complexes. Therefore, optimization of PV panels and battery components through PVsyst software simulation analysis is required. The simulation results after optimization showed that the PV array obtained 205 wp and a battery capacity of 62 ah (2 days of autonomy), resulting in a decrease in Tlol of 765 hours. While the Performance Ratio (PR) is 67.6%, there is an increase of 7.7%, and the sulfuric ratio is 93.6%, there is an increase in the energy supplied to users by 12.74% or 33.36 kWh.","PeriodicalId":13922,"journal":{"name":"International Journal of Electronics and Telecommunications","volume":null,"pages":null},"PeriodicalIF":0.5000,"publicationDate":"2024-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of solar power public street lighting optimization with Pvsyst software in a residential complex area\",\"authors\":\"I. Simanjuntak, Heryanto, Akhmad Wahyu Dani, Ketty Salamah, L. M. Silalahi, Marsuki\",\"doi\":\"10.24425/ijet.2024.149604\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The duration of street light illumination on solarpowered public street lighting is often short-lived (decreased Tlol) due to exposure to near shading (loss irradiance) of 8.89% in residential complexes. Therefore, optimization of PV panels and battery components through PVsyst software simulation analysis is required. The simulation results after optimization showed that the PV array obtained 205 wp and a battery capacity of 62 ah (2 days of autonomy), resulting in a decrease in Tlol of 765 hours. While the Performance Ratio (PR) is 67.6%, there is an increase of 7.7%, and the sulfuric ratio is 93.6%, there is an increase in the energy supplied to users by 12.74% or 33.36 kWh.\",\"PeriodicalId\":13922,\"journal\":{\"name\":\"International Journal of Electronics and Telecommunications\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2024-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Electronics and Telecommunications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24425/ijet.2024.149604\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"TELECOMMUNICATIONS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electronics and Telecommunications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/ijet.2024.149604","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"TELECOMMUNICATIONS","Score":null,"Total":0}
Analysis of solar power public street lighting optimization with Pvsyst software in a residential complex area
The duration of street light illumination on solarpowered public street lighting is often short-lived (decreased Tlol) due to exposure to near shading (loss irradiance) of 8.89% in residential complexes. Therefore, optimization of PV panels and battery components through PVsyst software simulation analysis is required. The simulation results after optimization showed that the PV array obtained 205 wp and a battery capacity of 62 ah (2 days of autonomy), resulting in a decrease in Tlol of 765 hours. While the Performance Ratio (PR) is 67.6%, there is an increase of 7.7%, and the sulfuric ratio is 93.6%, there is an increase in the energy supplied to users by 12.74% or 33.36 kWh.