{"title":"水电管道水锤现象的数值建模 - Keyal Khawar 水电站案例研究","authors":"Muhammad Aslam, Ahsan Ali, Muhammad Kaleem Ullah, Muhammad Shafqat Ejaz, Bisma Khalid, Rana Sharjeel Ayaz","doi":"10.4028/p-2mes8o","DOIUrl":null,"url":null,"abstract":"This study aimed at development and application of a numerical model; WHPANM (Water Hammer Phenomenon Analysis Numerical Model), to investigate the water hammer phenomenon in the penstock of the Keyal Khawar hydropower plant in Khyber Pakhtunkhwa, Pakistan. The model, written in Visual Basic, utilized the numerical method of characteristics to solve the momentum and continuity water hammer equations. Results indicated that using a 2.2 m diameter pipe resulted in a maximum and minimum pressure head of 1462 m and 1420 m. Increasing the diameter to 3.0 m decreased the maximum pressure head to 1448 m, while the minimum pressure head increased to 1422 m. Conversely, decreasing the diameter to 1.0 m led to a maximum and minimum pressure head of 1522 m and 1363 m, respectively. Regarding pipe length, a standard length of 900 m maintained maximum and minimum pressure heads at 1462 m and 1420 m, respectively. Extending length to 1400 m increased maximum pressure head to 1485 m. Conversely, shortening length to 300 m resulted in a decreased maximum pressure head of 1436 m, with minimum pressure head remaining constant at 1420 m. To prevent water hammer damage in high head hydropower plants, study recommends utilizing a 2.2 m diameter penstock pipe and coordinating valve closure times accordingly. The study suggests a systematic design approach, optimal penstock diameter, and less rigid pipe materials to mitigate water hammer effects. The WHPANM model demonstrated strong concordance with the original data generated by the commercial software employed by the consultant for the Kyal Khwar hydropower plant.","PeriodicalId":10603,"journal":{"name":"Construction Technologies and Architecture","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Numerical Modeling of Water Hammer Phenomenon in Hydropower Pipelines - A Case Study of Keyal Khawar Hydropower Plant\",\"authors\":\"Muhammad Aslam, Ahsan Ali, Muhammad Kaleem Ullah, Muhammad Shafqat Ejaz, Bisma Khalid, Rana Sharjeel Ayaz\",\"doi\":\"10.4028/p-2mes8o\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aimed at development and application of a numerical model; WHPANM (Water Hammer Phenomenon Analysis Numerical Model), to investigate the water hammer phenomenon in the penstock of the Keyal Khawar hydropower plant in Khyber Pakhtunkhwa, Pakistan. The model, written in Visual Basic, utilized the numerical method of characteristics to solve the momentum and continuity water hammer equations. Results indicated that using a 2.2 m diameter pipe resulted in a maximum and minimum pressure head of 1462 m and 1420 m. Increasing the diameter to 3.0 m decreased the maximum pressure head to 1448 m, while the minimum pressure head increased to 1422 m. Conversely, decreasing the diameter to 1.0 m led to a maximum and minimum pressure head of 1522 m and 1363 m, respectively. Regarding pipe length, a standard length of 900 m maintained maximum and minimum pressure heads at 1462 m and 1420 m, respectively. Extending length to 1400 m increased maximum pressure head to 1485 m. Conversely, shortening length to 300 m resulted in a decreased maximum pressure head of 1436 m, with minimum pressure head remaining constant at 1420 m. To prevent water hammer damage in high head hydropower plants, study recommends utilizing a 2.2 m diameter penstock pipe and coordinating valve closure times accordingly. The study suggests a systematic design approach, optimal penstock diameter, and less rigid pipe materials to mitigate water hammer effects. The WHPANM model demonstrated strong concordance with the original data generated by the commercial software employed by the consultant for the Kyal Khwar hydropower plant.\",\"PeriodicalId\":10603,\"journal\":{\"name\":\"Construction Technologies and Architecture\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Technologies and Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4028/p-2mes8o\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Technologies and Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4028/p-2mes8o","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在开发和应用数值模型 WHPANM(水锤现象分析数值模型),以研究巴基斯坦开伯尔巴图克瓦省 Keyal Khawar 水电站水闸中的水锤现象。该模型由 Visual Basic 编写,利用数值特性法求解动量和连续性水锤方程。结果表明,使用直径为 2.2 米的管道时,最大和最小压头分别为 1462 米和 1420 米;直径增加到 3.0 米时,最大压头降至 1448 米,而最小压头增至 1422 米。在管道长度方面,900 米的标准长度使最大和最小压头分别保持在 1462 米和 1420 米。为防止高水头水电站发生水锤破坏,研究建议使用直径为 2.2 米的水闸管道,并相应协调阀门关闭时间。研究建议采用系统化设计方法、最佳水闸直径和硬度较低的管道材料来减轻水锤效应。WHPANM 模型与 Kyal Khwar 水电站顾问使用的商业软件生成的原始数据非常吻合。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Numerical Modeling of Water Hammer Phenomenon in Hydropower Pipelines - A Case Study of Keyal Khawar Hydropower Plant
This study aimed at development and application of a numerical model; WHPANM (Water Hammer Phenomenon Analysis Numerical Model), to investigate the water hammer phenomenon in the penstock of the Keyal Khawar hydropower plant in Khyber Pakhtunkhwa, Pakistan. The model, written in Visual Basic, utilized the numerical method of characteristics to solve the momentum and continuity water hammer equations. Results indicated that using a 2.2 m diameter pipe resulted in a maximum and minimum pressure head of 1462 m and 1420 m. Increasing the diameter to 3.0 m decreased the maximum pressure head to 1448 m, while the minimum pressure head increased to 1422 m. Conversely, decreasing the diameter to 1.0 m led to a maximum and minimum pressure head of 1522 m and 1363 m, respectively. Regarding pipe length, a standard length of 900 m maintained maximum and minimum pressure heads at 1462 m and 1420 m, respectively. Extending length to 1400 m increased maximum pressure head to 1485 m. Conversely, shortening length to 300 m resulted in a decreased maximum pressure head of 1436 m, with minimum pressure head remaining constant at 1420 m. To prevent water hammer damage in high head hydropower plants, study recommends utilizing a 2.2 m diameter penstock pipe and coordinating valve closure times accordingly. The study suggests a systematic design approach, optimal penstock diameter, and less rigid pipe materials to mitigate water hammer effects. The WHPANM model demonstrated strong concordance with the original data generated by the commercial software employed by the consultant for the Kyal Khwar hydropower plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Lantana Camara Plant-Biochar Added Cementitious Mortar for Carbon Sequestration: Effect on Early-Age Properties An Experimental Study on the Mechanical Properties of Concrete by Using Human Hair Fiber as Reinforcement Designing a Material Database for the Flood-Resistant Housing An Experimental Study on Mechanical Properties of Concrete by Using Various Types of Coarse Aggregates of Different Quarries Progressive Pushover Analysis of a Reinforced Concrete Bridge of Pakistan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1