{"title":"带储能系统的 HCPB BB 概念 DEMO BOP 的设计更新","authors":"Evaldas Bubelis,&nbsp;Sebastian Ruck","doi":"10.1016/j.fusengdes.2024.114610","DOIUrl":null,"url":null,"abstract":"<div><p>An option for the Intermediate Coupling Design (ICD) of the European Demonstration Fusion Reactor (DEMO) Balance of Plant (BOP) configuration for Helium-Cooled Pebble Bed (HCPB) Breeding Blanket (BB) concept consists of the Primary Heat Transport System (PHTS), the Intermediate Heat Transfer System (IHTS), using HITEC salt as coolant, equipped with a thermal Energy Storage System (ESS), and the Power Conversion System (PCS). The aforementioned BOP configuration is capable of producing electricity continuously during the pulse time (2 h) and dwell time (10 min) of DEMO plant operation.</p><p>The present study reports on the current (2023) thermal system design of DEMO HCPB ICD BOP for 12 operational states defined by the DEMO Design Central Team (DCT) in 2021. It was shown that the PCS is able to accommodate all of the 12 operational points defined based on the uncertainties of the energy map, provided that an additional bypass line at the outlet of the Divertor Cassettes (DIV-CAS) Heat Exchanger (HX) towards the low-pressure part of the feedwater line (to the condenser in this investigation) is installed in the system. This line is activated only in the cases, where the feedwater flow to the low temperature DEMO heat sources HXs is needed to be higher than that necessary to remove BB power at the Steam Generators (SGs). In all the other cases, the bypass line remains unused. Additionally, perspective improvements of DEMO HCPB BOP regarding thermal ESS, as well as PCS are discussed.</p></div>","PeriodicalId":55133,"journal":{"name":"Fusion Engineering and Design","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2024-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S0920379624004617/pdfft?md5=bc5d582f5fb01d05473437515e650582&pid=1-s2.0-S0920379624004617-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Design update of DEMO BOP for HCPB BB concept with an energy storage system\",\"authors\":\"Evaldas Bubelis,&nbsp;Sebastian Ruck\",\"doi\":\"10.1016/j.fusengdes.2024.114610\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>An option for the Intermediate Coupling Design (ICD) of the European Demonstration Fusion Reactor (DEMO) Balance of Plant (BOP) configuration for Helium-Cooled Pebble Bed (HCPB) Breeding Blanket (BB) concept consists of the Primary Heat Transport System (PHTS), the Intermediate Heat Transfer System (IHTS), using HITEC salt as coolant, equipped with a thermal Energy Storage System (ESS), and the Power Conversion System (PCS). The aforementioned BOP configuration is capable of producing electricity continuously during the pulse time (2 h) and dwell time (10 min) of DEMO plant operation.</p><p>The present study reports on the current (2023) thermal system design of DEMO HCPB ICD BOP for 12 operational states defined by the DEMO Design Central Team (DCT) in 2021. It was shown that the PCS is able to accommodate all of the 12 operational points defined based on the uncertainties of the energy map, provided that an additional bypass line at the outlet of the Divertor Cassettes (DIV-CAS) Heat Exchanger (HX) towards the low-pressure part of the feedwater line (to the condenser in this investigation) is installed in the system. This line is activated only in the cases, where the feedwater flow to the low temperature DEMO heat sources HXs is needed to be higher than that necessary to remove BB power at the Steam Generators (SGs). In all the other cases, the bypass line remains unused. Additionally, perspective improvements of DEMO HCPB BOP regarding thermal ESS, as well as PCS are discussed.</p></div>\",\"PeriodicalId\":55133,\"journal\":{\"name\":\"Fusion Engineering and Design\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2024-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S0920379624004617/pdfft?md5=bc5d582f5fb01d05473437515e650582&pid=1-s2.0-S0920379624004617-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fusion Engineering and Design\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0920379624004617\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fusion Engineering and Design","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0920379624004617","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

欧洲示范聚变反应堆(DEMO)氦气冷却卵石床(HCPB)育成毯(BB)概念的电站平衡(BOP)配置的中间耦合设计(ICD)方案包括初级热传输系统(PHTS)、使用 HITEC 盐作为冷却剂的中级热传输系统(IHTS)、配备热能存储系统(ESS)和功率转换系统(PCS)。上述 BOP 配置能够在 DEMO 工厂运行的脉冲时间(2 小时)和停留时间(10 分钟)内连续发电。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design update of DEMO BOP for HCPB BB concept with an energy storage system

An option for the Intermediate Coupling Design (ICD) of the European Demonstration Fusion Reactor (DEMO) Balance of Plant (BOP) configuration for Helium-Cooled Pebble Bed (HCPB) Breeding Blanket (BB) concept consists of the Primary Heat Transport System (PHTS), the Intermediate Heat Transfer System (IHTS), using HITEC salt as coolant, equipped with a thermal Energy Storage System (ESS), and the Power Conversion System (PCS). The aforementioned BOP configuration is capable of producing electricity continuously during the pulse time (2 h) and dwell time (10 min) of DEMO plant operation.

The present study reports on the current (2023) thermal system design of DEMO HCPB ICD BOP for 12 operational states defined by the DEMO Design Central Team (DCT) in 2021. It was shown that the PCS is able to accommodate all of the 12 operational points defined based on the uncertainties of the energy map, provided that an additional bypass line at the outlet of the Divertor Cassettes (DIV-CAS) Heat Exchanger (HX) towards the low-pressure part of the feedwater line (to the condenser in this investigation) is installed in the system. This line is activated only in the cases, where the feedwater flow to the low temperature DEMO heat sources HXs is needed to be higher than that necessary to remove BB power at the Steam Generators (SGs). In all the other cases, the bypass line remains unused. Additionally, perspective improvements of DEMO HCPB BOP regarding thermal ESS, as well as PCS are discussed.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Fusion Engineering and Design
Fusion Engineering and Design 工程技术-核科学技术
CiteScore
3.50
自引率
23.50%
发文量
275
审稿时长
3.8 months
期刊介绍: The journal accepts papers about experiments (both plasma and technology), theory, models, methods, and designs in areas relating to technology, engineering, and applied science aspects of magnetic and inertial fusion energy. Specific areas of interest include: MFE and IFE design studies for experiments and reactors; fusion nuclear technologies and materials, including blankets and shields; analysis of reactor plasmas; plasma heating, fuelling, and vacuum systems; drivers, targets, and special technologies for IFE, controls and diagnostics; fuel cycle analysis and tritium reprocessing and handling; operations and remote maintenance of reactors; safety, decommissioning, and waste management; economic and environmental analysis of components and systems.
期刊最新文献
Direct internal recycling fractions approaching unity Experimental study on the critical current in highly flexible REBCO cables under copper tube compaction Parametric study of liquid metal flows in conducting circular ducts in a strong nonuniform magnetic field Thermal hydraulic and material analysis of upgraded flat-type Graphite divertor mock-up for Pakistan Spherical Tokamak (PST) Numerical structural analysis and flow-induced vibration study in support of the design of the EU-DEMO once-through steam generator mock-up for the STEAM experimental facility
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1