{"title":"钢结构隧道中的 TEM 响应反演及其应用","authors":"Shang Ran, Jinsong Shen, Zuzhi Hu, Gang Long","doi":"10.3390/min14080802","DOIUrl":null,"url":null,"abstract":"Steel infrastructure in tunnels significantly affects the accuracy of transient electromagnetic (TEM) data inversion. This study proposes and compares two methods to effectively mitigate this interference: the correction factor method and the prior information constraint method. The correction factor method constructs correction factors using interference data obtained in two ways. The first method, numerical simulation, is theoretically precise but relies heavily on accurate model parameters and requires significant computational resources. The second is conducted by measuring the interference data in the working space. While this approach is simple and operationally convenient, its effectiveness in correction is limited by the measured data quality. The a priori information constraint method improves the inversion by introducing a more accurate initial model. The inversion results of synthetic data indicate that the inversion based on the correction factor method and the prior information constraint method can effectively invert the anomaly. However, the delay effect remains a challenge for the correction factor method. Finally, we invert the field data measured in a mine tunnel by combining the interference processing methods.","PeriodicalId":18601,"journal":{"name":"Minerals","volume":"35 1","pages":""},"PeriodicalIF":2.2000,"publicationDate":"2024-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Inversion of TEM Responses in Tunnel with Steel Infrastructure and Its Application\",\"authors\":\"Shang Ran, Jinsong Shen, Zuzhi Hu, Gang Long\",\"doi\":\"10.3390/min14080802\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Steel infrastructure in tunnels significantly affects the accuracy of transient electromagnetic (TEM) data inversion. This study proposes and compares two methods to effectively mitigate this interference: the correction factor method and the prior information constraint method. The correction factor method constructs correction factors using interference data obtained in two ways. The first method, numerical simulation, is theoretically precise but relies heavily on accurate model parameters and requires significant computational resources. The second is conducted by measuring the interference data in the working space. While this approach is simple and operationally convenient, its effectiveness in correction is limited by the measured data quality. The a priori information constraint method improves the inversion by introducing a more accurate initial model. The inversion results of synthetic data indicate that the inversion based on the correction factor method and the prior information constraint method can effectively invert the anomaly. However, the delay effect remains a challenge for the correction factor method. Finally, we invert the field data measured in a mine tunnel by combining the interference processing methods.\",\"PeriodicalId\":18601,\"journal\":{\"name\":\"Minerals\",\"volume\":\"35 1\",\"pages\":\"\"},\"PeriodicalIF\":2.2000,\"publicationDate\":\"2024-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Minerals\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://doi.org/10.3390/min14080802\",\"RegionNum\":4,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"GEOCHEMISTRY & GEOPHYSICS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Minerals","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.3390/min14080802","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"GEOCHEMISTRY & GEOPHYSICS","Score":null,"Total":0}
Inversion of TEM Responses in Tunnel with Steel Infrastructure and Its Application
Steel infrastructure in tunnels significantly affects the accuracy of transient electromagnetic (TEM) data inversion. This study proposes and compares two methods to effectively mitigate this interference: the correction factor method and the prior information constraint method. The correction factor method constructs correction factors using interference data obtained in two ways. The first method, numerical simulation, is theoretically precise but relies heavily on accurate model parameters and requires significant computational resources. The second is conducted by measuring the interference data in the working space. While this approach is simple and operationally convenient, its effectiveness in correction is limited by the measured data quality. The a priori information constraint method improves the inversion by introducing a more accurate initial model. The inversion results of synthetic data indicate that the inversion based on the correction factor method and the prior information constraint method can effectively invert the anomaly. However, the delay effect remains a challenge for the correction factor method. Finally, we invert the field data measured in a mine tunnel by combining the interference processing methods.
期刊介绍:
Minerals (ISSN 2075-163X) is an international open access journal that covers the broad field of mineralogy, economic mineral resources, mineral exploration, innovative mining techniques and advances in mineral processing. It publishes reviews, regular research papers and short notes. Our aim is to encourage scientists to publish their experimental and theoretical results in as much detail as possible. There is no restriction on the length of the papers. The full experimental details must be provided so that the results can be reproduced.