使用 Aspen HYSYS 对 ITER 低温分布系统进行动态模拟

IF 1.9 3区 工程技术 Q1 NUCLEAR SCIENCE & TECHNOLOGY Fusion Engineering and Design Pub Date : 2024-08-06 DOI:10.1016/j.fusengdes.2024.114616
Vinit Shukla , Hitensinh Vaghela , Pratik Patel , Jotirmoy Das , Hyun-Sik Chang , Srinivasa Muralidhara , Cursan Marie , David Grillot
{"title":"使用 Aspen HYSYS 对 ITER 低温分布系统进行动态模拟","authors":"Vinit Shukla ,&nbsp;Hitensinh Vaghela ,&nbsp;Pratik Patel ,&nbsp;Jotirmoy Das ,&nbsp;Hyun-Sik Chang ,&nbsp;Srinivasa Muralidhara ,&nbsp;Cursan Marie ,&nbsp;David Grillot","doi":"10.1016/j.fusengdes.2024.114616","DOIUrl":null,"url":null,"abstract":"<div><p>The ITER cryogenic system consists of the Liquid Helium (LHe) plant, the Cryo-Distribution (CD) system, and the cryo-lines. The Auxiliary Cold Boxes (ACBs) dedicated to cooling the superconducting (SC) magnet system and the Cryoplant Termination Cold Box (CTCB) of the ITER CD system are in the factory acceptance phase. The internal components of ACBs, <em>e.g.</em>, cryogenic valves, a cold compressor (CCp), heat exchangers, and a cold circulator (CCr), have been sized and assembled, ensuring their functionality. The interdependency of the functional parameters of one component over the others needs to be assessed, as their integrated performance under the dynamic heat load deposition from the SC magnets may impact the overall operation of the ITER cryogenic system. The ACBs are equipped with two helium baths having ∼ 1200 kg of He inventory and situated inside the Tokamak building. These baths act as a thermal buffer for the LHe plant, situated in the cryoplant building, allowing it to operate at a quasi-steady state despite heat load variation from the applications. Such a large helium inventory can challenge the secondary confinement system of ITER due to helium ingress accidental events and thus needs to be optimized. The integrated system-level simulation is therefore necessary for the safe and reliable operation of the cryogenic system under such demanding requirements. The present study summarizes the results obtained for ACBs dedicated to the magnet system, including CTCB for the enhanced ITER operation modes, and confirms the integrated performance of the system. The results show that the LHe baths inside the ACBs can be used as a thermal buffer with the proposed limit of initial filling and by keeping a constant opening of the respective J-T valves upstream of the LHe baths. The study outcome and the proposed recommendations would be beneficial to mitigate the pulsed heat load to the LHe plant while minimizing the helium inventory.</p></div>","PeriodicalId":55133,"journal":{"name":"Fusion Engineering and Design","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2024-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Dynamic simulation of ITER cryo-distribution system using Aspen HYSYS\",\"authors\":\"Vinit Shukla ,&nbsp;Hitensinh Vaghela ,&nbsp;Pratik Patel ,&nbsp;Jotirmoy Das ,&nbsp;Hyun-Sik Chang ,&nbsp;Srinivasa Muralidhara ,&nbsp;Cursan Marie ,&nbsp;David Grillot\",\"doi\":\"10.1016/j.fusengdes.2024.114616\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The ITER cryogenic system consists of the Liquid Helium (LHe) plant, the Cryo-Distribution (CD) system, and the cryo-lines. The Auxiliary Cold Boxes (ACBs) dedicated to cooling the superconducting (SC) magnet system and the Cryoplant Termination Cold Box (CTCB) of the ITER CD system are in the factory acceptance phase. The internal components of ACBs, <em>e.g.</em>, cryogenic valves, a cold compressor (CCp), heat exchangers, and a cold circulator (CCr), have been sized and assembled, ensuring their functionality. The interdependency of the functional parameters of one component over the others needs to be assessed, as their integrated performance under the dynamic heat load deposition from the SC magnets may impact the overall operation of the ITER cryogenic system. The ACBs are equipped with two helium baths having ∼ 1200 kg of He inventory and situated inside the Tokamak building. These baths act as a thermal buffer for the LHe plant, situated in the cryoplant building, allowing it to operate at a quasi-steady state despite heat load variation from the applications. Such a large helium inventory can challenge the secondary confinement system of ITER due to helium ingress accidental events and thus needs to be optimized. The integrated system-level simulation is therefore necessary for the safe and reliable operation of the cryogenic system under such demanding requirements. The present study summarizes the results obtained for ACBs dedicated to the magnet system, including CTCB for the enhanced ITER operation modes, and confirms the integrated performance of the system. The results show that the LHe baths inside the ACBs can be used as a thermal buffer with the proposed limit of initial filling and by keeping a constant opening of the respective J-T valves upstream of the LHe baths. The study outcome and the proposed recommendations would be beneficial to mitigate the pulsed heat load to the LHe plant while minimizing the helium inventory.</p></div>\",\"PeriodicalId\":55133,\"journal\":{\"name\":\"Fusion Engineering and Design\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2024-08-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fusion Engineering and Design\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0920379624004678\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fusion Engineering and Design","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0920379624004678","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

热核实验堆低温系统由液氦(LHe)装置、低温配送(CD)系统和低温管线组成。专用于冷却超导(SC)磁体系统的辅助冷箱(ACB)和 ITER CD 系统的低温终端冷箱(CTCB)正处于工厂验收阶段。ACB 的内部组件(低温阀、冷压缩机 (CCp)、热交换器和冷循环器 (CCr))已确定尺寸并组装完毕,以确保其功能性。需要对一个组件的功能参数与其他组件的相互依存关系进行评估,因为它们在 SC 磁体动态热负荷沉积下的综合性能可能会影响热核实验堆低温系统的整体运行。ACB 配备了两个氦浴,氦存量为 1200 千克,位于托卡马克建筑内。这些氦池为低温装置大楼内的低温氦设备提供热缓冲,使其能够在应用产生热负荷变化的情况下仍能以准稳定状态运行。如此庞大的氦库存可能会因氦气意外进入而对热核实验堆的二次约束系统造成挑战,因此需要对其进行优化。因此,为了使低温系统在如此苛刻的要求下安全可靠地运行,有必要进行综合系统级模拟。本研究总结了磁体系统专用 ACB(包括用于增强型热核实验堆运行模式的 CTCB)的结果,并确认了系统的综合性能。研究结果表明,ACB 内部的氦气槽可用作热缓冲器,建议限制初始填充量,并保持氦气槽上游相应 J-T 阀门的恒定开度。研究结果和提出的建议将有助于减轻氦气厂的脉冲热负荷,同时最大限度地减少氦气库存。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Dynamic simulation of ITER cryo-distribution system using Aspen HYSYS

The ITER cryogenic system consists of the Liquid Helium (LHe) plant, the Cryo-Distribution (CD) system, and the cryo-lines. The Auxiliary Cold Boxes (ACBs) dedicated to cooling the superconducting (SC) magnet system and the Cryoplant Termination Cold Box (CTCB) of the ITER CD system are in the factory acceptance phase. The internal components of ACBs, e.g., cryogenic valves, a cold compressor (CCp), heat exchangers, and a cold circulator (CCr), have been sized and assembled, ensuring their functionality. The interdependency of the functional parameters of one component over the others needs to be assessed, as their integrated performance under the dynamic heat load deposition from the SC magnets may impact the overall operation of the ITER cryogenic system. The ACBs are equipped with two helium baths having ∼ 1200 kg of He inventory and situated inside the Tokamak building. These baths act as a thermal buffer for the LHe plant, situated in the cryoplant building, allowing it to operate at a quasi-steady state despite heat load variation from the applications. Such a large helium inventory can challenge the secondary confinement system of ITER due to helium ingress accidental events and thus needs to be optimized. The integrated system-level simulation is therefore necessary for the safe and reliable operation of the cryogenic system under such demanding requirements. The present study summarizes the results obtained for ACBs dedicated to the magnet system, including CTCB for the enhanced ITER operation modes, and confirms the integrated performance of the system. The results show that the LHe baths inside the ACBs can be used as a thermal buffer with the proposed limit of initial filling and by keeping a constant opening of the respective J-T valves upstream of the LHe baths. The study outcome and the proposed recommendations would be beneficial to mitigate the pulsed heat load to the LHe plant while minimizing the helium inventory.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Fusion Engineering and Design
Fusion Engineering and Design 工程技术-核科学技术
CiteScore
3.50
自引率
23.50%
发文量
275
审稿时长
3.8 months
期刊介绍: The journal accepts papers about experiments (both plasma and technology), theory, models, methods, and designs in areas relating to technology, engineering, and applied science aspects of magnetic and inertial fusion energy. Specific areas of interest include: MFE and IFE design studies for experiments and reactors; fusion nuclear technologies and materials, including blankets and shields; analysis of reactor plasmas; plasma heating, fuelling, and vacuum systems; drivers, targets, and special technologies for IFE, controls and diagnostics; fuel cycle analysis and tritium reprocessing and handling; operations and remote maintenance of reactors; safety, decommissioning, and waste management; economic and environmental analysis of components and systems.
期刊最新文献
Direct internal recycling fractions approaching unity Experimental study on the critical current in highly flexible REBCO cables under copper tube compaction Parametric study of liquid metal flows in conducting circular ducts in a strong nonuniform magnetic field Thermal hydraulic and material analysis of upgraded flat-type Graphite divertor mock-up for Pakistan Spherical Tokamak (PST) Numerical structural analysis and flow-induced vibration study in support of the design of the EU-DEMO once-through steam generator mock-up for the STEAM experimental facility
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1