电子病历停机应对措施:一个医疗系统的持续准备过程。

Q3 Medicine Journal of business continuity & emergency planning Pub Date : 2024-01-01
Julie Bulson, Sean Brower
{"title":"电子病历停机应对措施:一个医疗系统的持续准备过程。","authors":"Julie Bulson, Sean Brower","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Since the implementation of the HITECH Act 2009, the integration of the electronic health record (EHR) with other technology platforms has increased the complexity and necessity of technology downtimes, and the continuity of patient care has become increasingly dependent on an intact EHR. To maintain business continuity and safe patient care during planned or unplanned EHR downtime, it is imperative that organisations have solid downtime and disaster recovery plans. Successful downtime planning will include documenting, with annual reviews, the process for patient care during downtime, as well as an exercise programme that touches all aspects of the downtime process. This paper discusses the experience of a healthcare system based in the US Midwest, which has chosen to exercise part of that process on a quarterly basis, prior to scheduled EHR upgrades. Over the past year of exercises, this healthcare system has collected various data elements in order to identify the education needed and the fine-tuning of the exercise design required to ensure staff competency and patient safety during EHR downtime. The paper describes the process, outcome and the steps the organisation is taking to improve the outcomes of future EHR downtimes.</p>","PeriodicalId":39080,"journal":{"name":"Journal of business continuity & emergency planning","volume":"18 1","pages":"39-48"},"PeriodicalIF":0.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Electronic health record downtime responses : One health system's process for ongoing readiness.\",\"authors\":\"Julie Bulson, Sean Brower\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Since the implementation of the HITECH Act 2009, the integration of the electronic health record (EHR) with other technology platforms has increased the complexity and necessity of technology downtimes, and the continuity of patient care has become increasingly dependent on an intact EHR. To maintain business continuity and safe patient care during planned or unplanned EHR downtime, it is imperative that organisations have solid downtime and disaster recovery plans. Successful downtime planning will include documenting, with annual reviews, the process for patient care during downtime, as well as an exercise programme that touches all aspects of the downtime process. This paper discusses the experience of a healthcare system based in the US Midwest, which has chosen to exercise part of that process on a quarterly basis, prior to scheduled EHR upgrades. Over the past year of exercises, this healthcare system has collected various data elements in order to identify the education needed and the fine-tuning of the exercise design required to ensure staff competency and patient safety during EHR downtime. The paper describes the process, outcome and the steps the organisation is taking to improve the outcomes of future EHR downtimes.</p>\",\"PeriodicalId\":39080,\"journal\":{\"name\":\"Journal of business continuity & emergency planning\",\"volume\":\"18 1\",\"pages\":\"39-48\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of business continuity & emergency planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Medicine\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of business continuity & emergency planning","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Medicine","Score":null,"Total":0}
引用次数: 0

摘要

自 2009 年《HITECH 法案》实施以来,电子病历 (EHR) 与其他技术平台的整合增加了技术停机的复杂性和必要性,病人护理的连续性越来越依赖于完整的电子病历。为了在计划内或计划外的电子病历停机期间保持业务连续性和安全的病人护理,机构必须制定可靠的停机和灾难恢复计划。成功的停机计划包括记录停机期间的病人护理流程,并进行年度审查,还包括涉及停机流程各个方面的演练计划。本文讨论了位于美国中西部的一家医疗保健系统的经验,该系统选择在计划的电子病历升级之前,每季度进行一次部分流程演练。在过去一年的演练中,该医疗系统收集了各种数据元素,以确定所需的教育和演练设计的微调,从而确保员工在电子病历停机期间的能力和患者安全。本文介绍了演习的过程、结果以及该机构为改善未来电子病历停机的结果而采取的措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Electronic health record downtime responses : One health system's process for ongoing readiness.

Since the implementation of the HITECH Act 2009, the integration of the electronic health record (EHR) with other technology platforms has increased the complexity and necessity of technology downtimes, and the continuity of patient care has become increasingly dependent on an intact EHR. To maintain business continuity and safe patient care during planned or unplanned EHR downtime, it is imperative that organisations have solid downtime and disaster recovery plans. Successful downtime planning will include documenting, with annual reviews, the process for patient care during downtime, as well as an exercise programme that touches all aspects of the downtime process. This paper discusses the experience of a healthcare system based in the US Midwest, which has chosen to exercise part of that process on a quarterly basis, prior to scheduled EHR upgrades. Over the past year of exercises, this healthcare system has collected various data elements in order to identify the education needed and the fine-tuning of the exercise design required to ensure staff competency and patient safety during EHR downtime. The paper describes the process, outcome and the steps the organisation is taking to improve the outcomes of future EHR downtimes.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.30
自引率
0.00%
发文量
34
期刊介绍: Journal of Business Continuity & Emergency Planning is the leading professional journal publishing peer-reviewed articles and case studies written by and for business continuity and emergency managers.
期刊最新文献
A song of water and fire: Key lessons from Hurricane Fiona and Nova Scotia wildfires. Editorial. Knowledge production as an enabler to effective organisational resilience. Manitoba's provincial diagnostic and surgical recovery task force: Structure, processes and outcomes. Rapid disposition, emergency department flow and best practices in hospital mass casualty incident response.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1