{"title":"考虑随机突发事件的配电系统分布式稳健顺序负载恢复","authors":"Yangwu Shen,&nbsp;Feifan Shen,&nbsp;Heping Jin,&nbsp;Ziqian Li,&nbsp;Zhongchu Huang,&nbsp;Yunyun Xie","doi":"10.1049/gtd2.13155","DOIUrl":null,"url":null,"abstract":"<p>Natural disasters would destroy power grids and lead to blackouts. To enhance resilience of distribution systems, the sequential load restoration strategy can be adopted to restore outage portions using a sequence of control actions, such as switch on/off, load pickup, distributed energy resource dispatch etc. However, the traditional strategy may be unable to restore the distribution system in extreme weather events due to random sequential contingencies during the restoration process. To address this issue, this paper proposes a distributionally robust sequential load restoration strategy to determine restoration actions. Firstly, a novel multi-time period and multi-zone contingency occurrence uncertainty set is constructed to model spatial and temporal nature of sequential line contingencies caused by natural disasters. Then, a distributionally robust load restoration model considering uncertain line contingency probability distribution is formulated to maximize the expected restored load amount with respect to the worst-case line contingency probability distribution. Case studies were carried out on the modified IEEE 123-node system. Simulation results show that the proposed distributionally robust sequential load restoration strategy can produce a more resilient load restoration strategy against random sequential contingencies. Moreover, as compared with the conventional robust restoration strategy, the proposed strategy yields a less conservative restoration solution.</p>","PeriodicalId":13261,"journal":{"name":"Iet Generation Transmission & Distribution","volume":"18 18","pages":"2885-2896"},"PeriodicalIF":2.0000,"publicationDate":"2024-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13155","citationCount":"0","resultStr":"{\"title\":\"Distributionally robust sequential load restoration of distribution system considering random contingencies\",\"authors\":\"Yangwu Shen,&nbsp;Feifan Shen,&nbsp;Heping Jin,&nbsp;Ziqian Li,&nbsp;Zhongchu Huang,&nbsp;Yunyun Xie\",\"doi\":\"10.1049/gtd2.13155\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Natural disasters would destroy power grids and lead to blackouts. To enhance resilience of distribution systems, the sequential load restoration strategy can be adopted to restore outage portions using a sequence of control actions, such as switch on/off, load pickup, distributed energy resource dispatch etc. However, the traditional strategy may be unable to restore the distribution system in extreme weather events due to random sequential contingencies during the restoration process. To address this issue, this paper proposes a distributionally robust sequential load restoration strategy to determine restoration actions. Firstly, a novel multi-time period and multi-zone contingency occurrence uncertainty set is constructed to model spatial and temporal nature of sequential line contingencies caused by natural disasters. Then, a distributionally robust load restoration model considering uncertain line contingency probability distribution is formulated to maximize the expected restored load amount with respect to the worst-case line contingency probability distribution. Case studies were carried out on the modified IEEE 123-node system. Simulation results show that the proposed distributionally robust sequential load restoration strategy can produce a more resilient load restoration strategy against random sequential contingencies. Moreover, as compared with the conventional robust restoration strategy, the proposed strategy yields a less conservative restoration solution.</p>\",\"PeriodicalId\":13261,\"journal\":{\"name\":\"Iet Generation Transmission & Distribution\",\"volume\":\"18 18\",\"pages\":\"2885-2896\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2024-08-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1049/gtd2.13155\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iet Generation Transmission & Distribution\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13155\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iet Generation Transmission & Distribution","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/gtd2.13155","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

自然灾害会破坏电网,导致停电。为提高配电系统的恢复能力,可采用顺序负荷恢复策略,利用开关、负荷拾取、分布式能源资源调度等一系列控制操作来恢复停电部分。然而,在极端天气事件中,由于恢复过程中存在随机顺序突发事件,传统策略可能无法恢复配电系统。针对这一问题,本文提出了一种分布式鲁棒顺序负荷恢复策略来确定恢复行动。首先,构建了一个新颖的多时段、多区域突发事件发生不确定性集,以模拟自然灾害导致的连续线路突发事件的空间和时间性质。然后,考虑到不确定的线路突发事件概率分布,建立了分布稳健的负荷恢复模型,以最大化相对于最坏情况线路突发事件概率分布的预期恢复负荷量。对修改后的 IEEE 123 节点系统进行了案例研究。仿真结果表明,所提出的分布鲁棒性顺序负载恢复策略能够产生一种更有弹性的负载恢复策略,以应对随机顺序突发事件。此外,与传统的鲁棒性恢复策略相比,所提出的策略产生的恢复方案不那么保守。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Distributionally robust sequential load restoration of distribution system considering random contingencies

Natural disasters would destroy power grids and lead to blackouts. To enhance resilience of distribution systems, the sequential load restoration strategy can be adopted to restore outage portions using a sequence of control actions, such as switch on/off, load pickup, distributed energy resource dispatch etc. However, the traditional strategy may be unable to restore the distribution system in extreme weather events due to random sequential contingencies during the restoration process. To address this issue, this paper proposes a distributionally robust sequential load restoration strategy to determine restoration actions. Firstly, a novel multi-time period and multi-zone contingency occurrence uncertainty set is constructed to model spatial and temporal nature of sequential line contingencies caused by natural disasters. Then, a distributionally robust load restoration model considering uncertain line contingency probability distribution is formulated to maximize the expected restored load amount with respect to the worst-case line contingency probability distribution. Case studies were carried out on the modified IEEE 123-node system. Simulation results show that the proposed distributionally robust sequential load restoration strategy can produce a more resilient load restoration strategy against random sequential contingencies. Moreover, as compared with the conventional robust restoration strategy, the proposed strategy yields a less conservative restoration solution.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Iet Generation Transmission & Distribution
Iet Generation Transmission & Distribution 工程技术-工程:电子与电气
CiteScore
6.10
自引率
12.00%
发文量
301
审稿时长
5.4 months
期刊介绍: IET Generation, Transmission & Distribution is intended as a forum for the publication and discussion of current practice and future developments in electric power generation, transmission and distribution. Practical papers in which examples of good present practice can be described and disseminated are particularly sought. Papers of high technical merit relying on mathematical arguments and computation will be considered, but authors are asked to relegate, as far as possible, the details of analysis to an appendix. The scope of IET Generation, Transmission & Distribution includes the following: Design of transmission and distribution systems Operation and control of power generation Power system management, planning and economics Power system operation, protection and control Power system measurement and modelling Computer applications and computational intelligence in power flexible AC or DC transmission systems Special Issues. Current Call for papers: Next Generation of Synchrophasor-based Power System Monitoring, Operation and Control - https://digital-library.theiet.org/files/IET_GTD_CFP_NGSPSMOC.pdf
期刊最新文献
A collaborative planning of PCCs siting and transmission network expansion for super large-scale offshore wind clusters Analysis of steady-state operation of active distribution network under uncertain conditions A generalized method of power oscillation characteristic analysis for multi-VSC grid-connected system Resilience assessment of power transmission system during wildfire disasters considering spread process Two-stage stochastic energy and reserve market clearing model considering real-time offering strategy of renewable energy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1