{"title":"利用 HEC-RAS 分析溃坝对下游的影响:尼泊尔中部 Budhigandaki 混凝土拱坝的案例","authors":"Anu Awal, Utsav Bhattarai, Vishnu Prasad Pandey, Pawan Kumar Bhattarai","doi":"10.1186/s40068-024-00358-3","DOIUrl":null,"url":null,"abstract":"Studies on concrete dam breach are limited compared to earthen and other types of dams. With an increase in the construction of concrete dams, particularly in the developing world, it is imperative to have a better understanding of the dam breach phenomena and the identification of the most influential breach parameters. This study aims to contribute to this gap by taking the case of the concrete arch dam proposed for the 1200 MW Budhigandaki Hydropower Project located in central Nepal. This study carries special significance for Nepal, primarily because of the increasing number of under construction and proposed large dams for water resources development in the country. We carry out dam breach analysis of the Budhigandaki dam using HEC-RAS 2D model to calculate the flood discharge peaks, time to peak, water surface elevation and the extent of inundation for two scenarios (with and without probable maximum flood) to estimate the damage on four downstream settlements. We carry out sensitivity analysis of the breach parameters on the flood magnitudes and severity. Results show that all the study locations lie in the high flood hazard zone. Flood peaks can reach as high as 286,000 m3s− 1 to 511,000 m3s− 1 in the considered settlements. The time to peak ranges from 11.3 to 17 h after the breach at these locations. We estimate that if a breach should happen, it would most likely inundate around 150,000 buildings, impact nearly 672,000 lives and flood 3,500 km of road downstream. Furthermore, dam breach elevation is found to be the most sensitive parameter to downstream floods. Hence, rather than structural measures, it is recommended that non-structural measures are implemented for minimizing the impacts of flood disasters at the study locations. The findings could be a useful reference for future dam projects in Nepal and other areas with similar hydrological and topographical conditions.","PeriodicalId":12037,"journal":{"name":"Environmental Systems Research","volume":"9 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Downstream impacts of dam breach using HEC-RAS: a case of Budhigandaki concrete arch dam in central Nepal\",\"authors\":\"Anu Awal, Utsav Bhattarai, Vishnu Prasad Pandey, Pawan Kumar Bhattarai\",\"doi\":\"10.1186/s40068-024-00358-3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Studies on concrete dam breach are limited compared to earthen and other types of dams. With an increase in the construction of concrete dams, particularly in the developing world, it is imperative to have a better understanding of the dam breach phenomena and the identification of the most influential breach parameters. This study aims to contribute to this gap by taking the case of the concrete arch dam proposed for the 1200 MW Budhigandaki Hydropower Project located in central Nepal. This study carries special significance for Nepal, primarily because of the increasing number of under construction and proposed large dams for water resources development in the country. We carry out dam breach analysis of the Budhigandaki dam using HEC-RAS 2D model to calculate the flood discharge peaks, time to peak, water surface elevation and the extent of inundation for two scenarios (with and without probable maximum flood) to estimate the damage on four downstream settlements. We carry out sensitivity analysis of the breach parameters on the flood magnitudes and severity. Results show that all the study locations lie in the high flood hazard zone. Flood peaks can reach as high as 286,000 m3s− 1 to 511,000 m3s− 1 in the considered settlements. The time to peak ranges from 11.3 to 17 h after the breach at these locations. We estimate that if a breach should happen, it would most likely inundate around 150,000 buildings, impact nearly 672,000 lives and flood 3,500 km of road downstream. Furthermore, dam breach elevation is found to be the most sensitive parameter to downstream floods. Hence, rather than structural measures, it is recommended that non-structural measures are implemented for minimizing the impacts of flood disasters at the study locations. The findings could be a useful reference for future dam projects in Nepal and other areas with similar hydrological and topographical conditions.\",\"PeriodicalId\":12037,\"journal\":{\"name\":\"Environmental Systems Research\",\"volume\":\"9 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Environmental Systems Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1186/s40068-024-00358-3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental Systems Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1186/s40068-024-00358-3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

与土坝和其他类型的大坝相比,对混凝土溃坝的研究十分有限。随着混凝土大坝建设的增加,特别是在发展中国家,必须更好地了解大坝的溃坝现象,并确定最有影响力的溃坝参数。本研究以位于尼泊尔中部的 1200 兆瓦布迪甘达基水电站项目拟建的混凝土拱坝为例,旨在填补这一空白。这项研究对尼泊尔具有特殊意义,主要是因为该国在建和拟建的大型水资源开发大坝数量不断增加。我们使用 HEC-RAS 2D 模型对布迪甘达基大坝进行了溃坝分析,计算了两种情况下(可能发生最大洪水和不发生最大洪水)的泄洪峰值、达到峰值的时间、水面高程和淹没范围,以估算对下游四个居民点造成的损失。我们对洪水量级和严重程度的泄洪参数进行了敏感性分析。结果显示,所有研究地点都位于洪水高危险区。在所考虑的居民点,洪峰可达 286,000 立方米-1 至 511,000 立方米-1。在这些地点,溃口后达到峰值的时间从 11.3 小时到 17 小时不等。我们估计,如果发生溃坝,很可能会淹没约 150,000 座建筑物,影响近 672,000 人的生活,并淹没下游 3,500 公里的道路。此外,我们发现溃坝高程是对下游洪水最敏感的参数。因此,建议在研究地点采取非结构性措施,而不是结构性措施,以尽量减少洪水灾害的影响。研究结果可为尼泊尔及其他具有类似水文和地形条件的地区未来的大坝项目提供有用的参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Downstream impacts of dam breach using HEC-RAS: a case of Budhigandaki concrete arch dam in central Nepal
Studies on concrete dam breach are limited compared to earthen and other types of dams. With an increase in the construction of concrete dams, particularly in the developing world, it is imperative to have a better understanding of the dam breach phenomena and the identification of the most influential breach parameters. This study aims to contribute to this gap by taking the case of the concrete arch dam proposed for the 1200 MW Budhigandaki Hydropower Project located in central Nepal. This study carries special significance for Nepal, primarily because of the increasing number of under construction and proposed large dams for water resources development in the country. We carry out dam breach analysis of the Budhigandaki dam using HEC-RAS 2D model to calculate the flood discharge peaks, time to peak, water surface elevation and the extent of inundation for two scenarios (with and without probable maximum flood) to estimate the damage on four downstream settlements. We carry out sensitivity analysis of the breach parameters on the flood magnitudes and severity. Results show that all the study locations lie in the high flood hazard zone. Flood peaks can reach as high as 286,000 m3s− 1 to 511,000 m3s− 1 in the considered settlements. The time to peak ranges from 11.3 to 17 h after the breach at these locations. We estimate that if a breach should happen, it would most likely inundate around 150,000 buildings, impact nearly 672,000 lives and flood 3,500 km of road downstream. Furthermore, dam breach elevation is found to be the most sensitive parameter to downstream floods. Hence, rather than structural measures, it is recommended that non-structural measures are implemented for minimizing the impacts of flood disasters at the study locations. The findings could be a useful reference for future dam projects in Nepal and other areas with similar hydrological and topographical conditions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of land cover degradation due to mining activities using remote sensing and digital photogrammetry A comprehensive review on challenges and choices of food waste in Saudi Arabia: exploring environmental and economic impacts Performance evaluation of integrated Upflow Anaerobic Sludge Blanket reactor with trickling filter used for municipal wastewater treatment and effluent reuse potential for agriculture Machine learning downscaling of GRACE/GRACE-FO data to capture spatial-temporal drought effects on groundwater storage at a local scale under data-scarcity Downstream impacts of dam breach using HEC-RAS: a case of Budhigandaki concrete arch dam in central Nepal
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1