大型政府项目的成本和进度绩效

Morten Welde, Atle Engebø
{"title":"大型政府项目的成本和进度绩效","authors":"Morten Welde, Atle Engebø","doi":"10.1088/1755-1315/1389/1/012027","DOIUrl":null,"url":null,"abstract":"This paper uses data from 111 large government projects in Norway. We compare their final cost to the formal budget set by the parliament in their formal funding decision. We use standard statistical measures to illustrate their cost performance and whether the projects have been completed within the agreed schedule. We also examine the proportion of projects that have been fully successful from an operational perspective, that is, how many have been completed without either cost overruns or delays. The results are encouraging and better than most reported in the international research literature. On average, Norwegian government projects are completed 5% below budget. Three of four projects experience cost underrun. Schedule performance is weaker as the average completion is ten months after planned completion. Only about a third of the projects can be considered fully successful according to the performance targets for both time and cost. Despite these somewhat positive results, we warn against the implications of large projects currently under construction and which are experiencing challenges concerning costs and schedule.","PeriodicalId":14556,"journal":{"name":"IOP Conference Series: Earth and Environmental Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost and schedule performance in large government projects\",\"authors\":\"Morten Welde, Atle Engebø\",\"doi\":\"10.1088/1755-1315/1389/1/012027\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper uses data from 111 large government projects in Norway. We compare their final cost to the formal budget set by the parliament in their formal funding decision. We use standard statistical measures to illustrate their cost performance and whether the projects have been completed within the agreed schedule. We also examine the proportion of projects that have been fully successful from an operational perspective, that is, how many have been completed without either cost overruns or delays. The results are encouraging and better than most reported in the international research literature. On average, Norwegian government projects are completed 5% below budget. Three of four projects experience cost underrun. Schedule performance is weaker as the average completion is ten months after planned completion. Only about a third of the projects can be considered fully successful according to the performance targets for both time and cost. Despite these somewhat positive results, we warn against the implications of large projects currently under construction and which are experiencing challenges concerning costs and schedule.\",\"PeriodicalId\":14556,\"journal\":{\"name\":\"IOP Conference Series: Earth and Environmental Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IOP Conference Series: Earth and Environmental Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1088/1755-1315/1389/1/012027\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOP Conference Series: Earth and Environmental Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1755-1315/1389/1/012027","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文使用了挪威 111 个大型政府项目的数据。我们将这些项目的最终成本与议会在正式拨款决定中设定的正式预算进行了比较。我们使用标准的统计方法来说明项目的成本绩效,以及项目是否在商定的时间表内完成。我们还研究了从运作角度看完全成功的项目比例,即有多少项目在完成时没有出现成本超支或延误。结果令人鼓舞,比国际研究文献中的大多数报告都要好。挪威政府项目的平均完成成本比预算低 5%。四个项目中有三个出现成本超支。进度表现较差,平均竣工时间比计划竣工时间晚 10 个月。根据时间和成本方面的绩效目标,只有大约三分之一的项目可以被认为是完全成功的。尽管取得了这些积极的成果,我们还是要提醒大家注意目前正在施工的大型项目在成本和进度方面遇到的挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Cost and schedule performance in large government projects
This paper uses data from 111 large government projects in Norway. We compare their final cost to the formal budget set by the parliament in their formal funding decision. We use standard statistical measures to illustrate their cost performance and whether the projects have been completed within the agreed schedule. We also examine the proportion of projects that have been fully successful from an operational perspective, that is, how many have been completed without either cost overruns or delays. The results are encouraging and better than most reported in the international research literature. On average, Norwegian government projects are completed 5% below budget. Three of four projects experience cost underrun. Schedule performance is weaker as the average completion is ten months after planned completion. Only about a third of the projects can be considered fully successful according to the performance targets for both time and cost. Despite these somewhat positive results, we warn against the implications of large projects currently under construction and which are experiencing challenges concerning costs and schedule.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.00
自引率
0.00%
发文量
0
期刊最新文献
Peer Review Statement Response Surface Methodological Approach for the Adsorptive Removal of Geosmin and 2-Methylisoborneol on Sodium Hydroxide-Treated Powdered Activated Carbon Torrefaction performance of Macadamia husk under a flue gas atmosphere for solid biofuel applications Assessing the Techno-Economics of Solar-Assisted Absorption Air Conditioning in a University Building in Jordan Wyoming's produced water: Analysis and green hydrogen potential
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1