{"title":"国际热核聚变实验堆再次出现长达十年的延误","authors":"Michael Banks","doi":"10.1088/2058-7058/37/08/08","DOIUrl":null,"url":null,"abstract":"The ITER fusion reactor will now cost €5bn more and not reach full operation with deuterium and tritium until 2039, as Michael Banks explains.","PeriodicalId":54613,"journal":{"name":"Physics World","volume":"2 1","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2024-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ITER hit by new decade-long delay\",\"authors\":\"Michael Banks\",\"doi\":\"10.1088/2058-7058/37/08/08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The ITER fusion reactor will now cost €5bn more and not reach full operation with deuterium and tritium until 2039, as Michael Banks explains.\",\"PeriodicalId\":54613,\"journal\":{\"name\":\"Physics World\",\"volume\":\"2 1\",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2024-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Physics World\",\"FirstCategoryId\":\"101\",\"ListUrlMain\":\"https://doi.org/10.1088/2058-7058/37/08/08\",\"RegionNum\":4,\"RegionCategory\":\"物理与天体物理\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"PHYSICS, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Physics World","FirstCategoryId":"101","ListUrlMain":"https://doi.org/10.1088/2058-7058/37/08/08","RegionNum":4,"RegionCategory":"物理与天体物理","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"PHYSICS, MULTIDISCIPLINARY","Score":null,"Total":0}